ML20044H092
| ML20044H092 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/24/1993 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Richard Anderson CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20044H093 | List: |
| References | |
| NUDOCS 9306070377 | |
| Download: ML20044H092 (4) | |
See also: IR 05000324/1993201
Text
_
- _-____
f
%
,
$
UNITED STATES
DIF )(%
NUCLEAR REGULATORY COMMISSION
g
.
)
a
WASHINGTON, D. C. 20555
-
\\\\[ QE
/
May 24, 1993
Docket No. 50-324
Mr. Roy A. Anderson
Vice President
Brunswick Steam Electric Plant
P.O. Box 10429
Southport, NC 28461
Dear Mr. Anderson:
SUBJECT: NRC INSPECTION REPORT 50-324/93-201 BRUNSWICK STEAM ELECTRIC PLANT,
UNIT 2, OPERATIONAL READINESS ASSESSMENT TEAM INSPECTION
This letter transmits the report of the U.S. Nuclear Regulatory Commission
(NRC) Operational Readiness Assessment Team (ORAT) inspection, conducted from
March 29 through April 9, 1993, of activities authorized by NRC Operating
License No. DPR-62 for the Brunswick Steam Electric Plant, Unit 2.
The
inspection was conducted by the Special Inspection Branch of the Office of
Nuclear Reactor Regulation (NRR) and consisted of staff from NRR, Regions I,
II and V.
The ORAT performed an independent, in-depth assessment of the readiness of
management controls, programs, and personnel to support safe restart and
operation of the Unit 2 facility in the functional areas of facility
management, operations, maintenance, surveillance and testing, engineering and
technical support, and safety assessment and quality verification. The team's
findings were discussed with you and other members of your staff at the
i
conclusion of the inspection on April 9,1993.
i
i
The team concluded that your staff had demonstrated the ability to control
activities and safely operate Brunswick Steam Electric Plant, Unit 2, in
accordance with NRC requirements. The OPAT's findings regarding strengths and
weaknesses in the functional areas reviewed are discussed in the enclosed
report.
With regard to the areas of weakness, the ORAT identified four issues which
Carolina Power & Light company management indicated would receive the
necessary attention before restart. These issues were 1) performance of an
alternate safe shutdown drill, 2) backlog of maintenance procedure changes,
3) unauthorized operator aids, and 4) backlog of corrective maintenance. A
letter summarizing these areas of weakness was sent to you on April 16, 1993.
Region II verified that appropriate corrective action was taken before
restart. Another weakness, loss of control over some work activities, was
also addressed by your managers.
j
No response to this letter is required. The NRC Region II office will issue
l
any enforcement action that may result from this inspection.
e - e m eses 2.
a
m
-
" t
DR
ADOCK 05000324
I]
_ _ _ _
- - _ _ _ _ _ _
.
.
'
Mr. Roy A. Anderson
-2-
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the inspection report will be placed in the NRC Public
Document Room. Should you have any questions concerning this inspection, we
will be pleased to discuss them with you.
Sincerely,
P
4
Steven A. Varga, Director
Division of Reactor Projects, I/II
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-324/93-201
,
I
t
4
-
-
-
--
- ]
,
i
.
.
.
Mr. Roy A. Anderson
-3-
Brunswick Steam Electric Plant
.
Carolina Power & Light Company
Units I and 2
cc:
Mr. Mark S. Calvert
Mr. H. A. Cole
Associate General Counsel
Special Deputy Attorney General Post
Brunswick Steam Counsel
State of North Carolina
.
!
Post Office Box 10429
Post-Office Box 629
Southport, NC 28461
Raleigh, NC 27602
1
!
Mr. Kelly Holden, Chairman
Mr. Robert P. Gruber
Board of Commissioners
Executive Director
Post Office Box 249
Public Staff - NCUC
Southport, NC 28422
Post Office Box 29520
Raleigh, NC 27626-0520
Resident Inspector
U.S. Nuclear Regulatory Commission
Mr. H. W. Habermeyer, Jr.
Star Route 1, Post Office Box 208
Vice President
1,
Southport, NC 28461
Nuclear Services Department
Carolina Power & Light Company
Regional Administrator, Region 11
Post Office Box 1551 - Mail OHS 7
U.S. Nuclear Regulatory Commission
Raleigh, NC 27602
,
101 Marietta St., NW, Suite 2900
Atlanta, GA 30323
Mr. Dayne H. Brown, Director
Division of Radiation Protection
NC Department of Environmental,
Commerce and Natural Resources
,"
Post Office Box 27687
!
Raleigh, NC 27611-7687
.
Mr. J. M. Brown
Plant Manager - Unit 1
'
Brunswick Steam Electric Plant
Post Office Box 10429
Southport NC 28461
Public Service Commission
>
State of South Carolina
3
Post Office Drawer 11649
Columbia, SC 29211
.;
Mr. C. C. Warren
Plant Manager - Unit 2
Brunswick Steam Electric Plant
Post Office Box 10429
Southport, NC 28461
9
>
L
..
-$ .
-4-
"
Distribution:
" Docket-Files:
.,
^
RSIB R/F
DRIL R/F
TEMurley, NRR
FJMiraglia, NRR
WTRussell, NRR
JGPartlow, NRR
CERossi, NRR
RPZimmerman, NRR
EVImbro, NRR
DPNorkin, NRR
PSKoltay, NRR
RLSpessard, AE0D
SAVarga, NRR
EGAdensam, NRR
PDMilano, NRR
'
PDAnderson, NRR
RLPrevatte, RII
Regional Administrator
Regional
DRP and DRS Division Directors
Inspection Team
LPDR
ACRS (3)
OGC (3)
IS Distribution
.
64000G
1
$
,