Advises That Implementation Schedule for All Required hardware-related Mods to Be Completed by End of Refuel 7 Acceptable,Per Generic Ltr 88-17, Loss of Dhr. Insp Will Take Place After Sufficient Progress Made on Enhancements
ML20043A834
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/18/1990
From: Silver H
Office of Nuclear Reactor Regulation
To: Beard P
FLORIDA POWER CORP.
References
GL-88-17, TAC-69738, NUDOCS 9005230176
Download: ML20043A834 (3)


Text

-

/

g,,

l o

o, UNITED STATES

,[

NUCLEAR REGULATORY COMMISSION j

.r.

n sb f

WASHINGTON, D. C. 20555

, r,

.f May 18, 1990

]

)

f Docket No. 50-302 3

Mr. Percy H. Beard, Jr.

I Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Operations 1

Licensing P. 0.. Box 219-NA-21 Crystal River, Florida 32629

Dear Mr. Beard:

SUBJECT:

CRYSTAL RIVER UNIT 3 - PROGRAMMED ENHANCEMENTS FOR GENERIC LETTER 88-17, "LOSSOFDECAYHEATREMOVAL"(TACNO.69738)

The NRC staff has completed its review of all licensee responses regarding programmed enhancements as defined in Generic Letter (GL) 88-17 " Loss of Dccay Heat Removal". The NRC staff review was based on a sampling of about one-third of all responses. Since the sample did not result in significant comments, the remainder of the responses will not be reviewed by NRR. NRC review of this phase of GL 88-17 will be accomplished as an inspection under Temporary Inscruction (TI) 2515/103 in the NRC Inspection Manual. The inspection will take place after you have made sufficient progress for NRC to make a full assessment of your programmed enharcements. This letter constitutes the NRR report stated in paragraph 05.01 as a prerequisite to the inspection under TI 2515/103.

As for your implementation schedule, ycu indicate that all required hardware-related modifications will be completed by the end of Refuel 7.

Since this is by the end of.the first refueling outage that is initiated 18 months or later following your receipt of GL 88-17, your schedule is consistent with the GL-and is acceptable. Also, you indicate that progransned enhancements that do not depend on hardware changes are either in progress or shall be implemented as a part of the Technical Specification Improvement Program. TH s also is consistent with the GL and is acceptable.

l l

Mditionally, you are requested to inform the NRC in writing of any signifi-cant changes in the estimated completion schedule identified above. You are also requested to inform the NRC in writing when the action has actually been implemented and the modifications are determined to be operational.

E This request is covered by Office of Management and Budget Clearance Number 3150-0011, which expires January 11, 1991. The estimated average burden-hours is 4 person-hours per owner response, including searching data sources, gathering and analyzing the data, and preparing the letter. These estimated average burden-hours pertain only to the identified response-related matters and do not include the time for actual implementation of the requested action.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this turden, to I-1 9005230176 pong 19 u

{DR ADOCK 05000302 pgl x

PDC N

l(O

l

~

a

w. l, Mr. P.M. Beard 2-May 18, 1990 the Information and Records Management Branch, Division of Information Support Services, Office of Information Resourc2s Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (31500011), Office of Management and Budget, Washington, D.C. 20503.

Please address your response to this letter to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, pursuant to 10 CFR Section 50.4 of the NRC's regulations.

I Please contact us should you have any questions regarding this matter.

This completes the staff's efforts on TAC No. 69738 Sincerely, l

Original signed by l

Harley Silver, Project Manager Project Directorate II.2

~

Division of Reactor Projects. 1/II L

Office of Nuclear Reactor Regulation cc: See next page 1

DISTRIBUTION HBerkow

Docket File-NRC & LPDRs CTrammell 13/E/16 PD22 Rdg File HSmith 12/H/5 SVarga 14/E/4 Glainas 14/H/3 i

DMiller GWunder g

HSilver OGC EJordan MNBB-3302 ACRS(10)

MSinkule RII n

PM:PD i;-
D:PDII.2

.-2

PE:

L :qI'4.......:.,

OFC m

HAME :D #r

G r
HS y4
HB r )

-......;q....s..........:............,.:..............:..............:..............:.............

DATE :05/ d 90

05////90
05/W/90
05//8/90 3

iv 0FFICIAL RECORD COPY Document Name: GL 8817 CR3

l' s

d d~* '

  • Mr. Percy M. Beard, Jr.

Crystal River Unit No. 3 Nuclear i

Florida Power Corporation Generating Plant cc:

Mr. A. H. Stephens State Planning and Developinent General Counsel Clearinghouse Florida Power Corporation Office of Planning and Budget MAC - A50 Executive Office of the Governor P. O. Box 14042 The Capitol Building St. Petersburg, Florida 33733 Tallahassee, Florida 32301 Mr. P. F.14cKee, Director Chairman

. Nuclear Plant Operations Board of County Commissioners Florida Power Corporatica Citrus County P. O. Box 219-NA-2C 110 North Apopka Avenue Crystal River, Florida 32629 Inverness, Florida 32650 Mr. Robert b. Borsum Mr. Rolf C. Wide 11, Director Babcock & Wilcox Nuclear Operations Site Support Nuclear Power Generation Division Florida Power Corporation 1700 Rockville Pike, Suite 525 P.O. Box 219-NA-21 Rockville, Maryland 20852 Crystal River, Florida 32629 Senior Resident Inspector Mr. Gary L. Boldt Crystal River Unit 3 Vice President, Nuclear Production U.S. Nuclear Regulatory Commission Florida Power Corporation 15760 West Powerline Street P. O. Box 219-SA-2C Crystal River, Florida 32029 Crystal River, Florida 32629 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Administrator 4

Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 i

i