Letter Sequence Other |
|---|
|
|
MONTHYEARML20008E6661981-03-0404 March 1981 Forwards TR-ESE-411, Steam Generator Crevice Flow Test for Wi Electric Power Co. Verifies Analysis Re Leakage Characteristics of Simulated Tube Defects in Tube Sheet Crevice Project stage: Other ML20009B0101981-07-0202 July 1981 Tech Spec Change Request 69,amending Licenses DPP-24 & DPR- 27,to Permit Repair of Degraded or Defective Steam Generator Tubes by Sleeving.Request Involves Class III Fee.Asme Code & Regulatory Requirements Table & Fee Encl Project stage: Other ML20031B6611981-09-28028 September 1981 Motion for Authorization for Interim Operation of Unit 1 W/Steam Generator Tubes Sleeved Rather than Plugged.Limited Scope,Duration of Program,Stringent Requirements & Operating Limits Will Assure No Danger to Public Project stage: Request ML20031E3741981-10-12012 October 1981 Application for Tech Specs Amend,Authorizing Operation W/Steam Generator Tubes Sleeved Rather than Plugged Project stage: Request ML20042A9481982-03-0404 March 1982 Authorizes Utilization of Affidavits AW-80-32 & AW-80-53 to Justify Withholding of Revision 1 to Point Beach Steam Generator Sleeving Rept Project stage: Other ML20042A9431982-03-11011 March 1982 Forwards Proprietary Version of Revision 1 to Point Beach Steam Generator Sleeving Rept, Consisting of Results of Addl Testing to Verify Resistance of Sleeving Matl.Svc List Encl.Rept Withheld (Ref 10CFR2.790) Project stage: Other IR 05000266/19820041982-03-11011 March 1982 IE Insp Repts 50-266/82-04 & 50-301/82-04 on 820130.No Noncompliance Noted.Major Areas Inspected:Prompt Public Notification/Warning Sys Project stage: Request ML20042A8411982-03-19019 March 1982 Informs That Westinghouse Rept, Point Beach Steam Generator Sleeving Rept,WCAP-9960,Revision 1 (Proprietary),WCAP-9960, Revision 1, Was Incorrectly Marked.Entire Rept Should Be Considered Proprietary.Corrected Version to Be Sent 820322 Project stage: Other ML20054C5791982-04-0606 April 1982 Authorizes Utilization of Affidavit AW-80-53 to Justify Withholding of Reissued Revision 1 to Point Beach Steam Generator Sleeving Rept Project stage: Other ML20054C5391982-04-13013 April 1982 Forwards Reprint of Revision 1 to Point Beach Steam Generator Sleeving Rept. Reprint Completely Marks Matl Considered to Be Proprietary.Rept Withheld (Ref 10CFR2.790) Project stage: Other ML20071E7261983-03-0909 March 1983 Proposed Revised Tech Spec Section 15.3.1.C & Table 15.4.1-2 Re Max Coolant Activity & Min Frequencies for Equipment & Sampling Tests,Respectively Project stage: Other ML20071E7071983-03-0909 March 1983 Mod to Application for Amend to Licenses DPR-24 & DPR-27, Changing Tech Spec Change Request 69 to Revise Section 15.3.1.C & Table 15.4.1-2 Re Max Coolant Activity & Min Frequencies for Equipment & Sampling Tests,Respectively Project stage: Request 1982-03-11
[Table View] |
Informs That Westinghouse Rept, Point Beach Steam Generator Sleeving Rept,WCAP-9960,Revision 1 (Proprietary),WCAP-9960, Revision 1, Was Incorrectly Marked.Entire Rept Should Be Considered Proprietary.Corrected Version to Be Sent 820322| ML20042A841 |
| Person / Time |
|---|
| Site: |
Point Beach  |
|---|
| Issue date: |
03/19/1982 |
|---|
| From: |
Davis F WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
|---|
| To: |
Clark R, Harold Denton Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| TAC-46694, TAC-46695, NUDOCS 8203240188 |
| Download: ML20042A841 (1) |
|
Text
-m
)
y z
v WestinghoUSB law Department Electric Corporation westinghouse Building Gateway Center Pittsburg!1 Pennsylvania 15222 P. 0. Box 355 Pittsburgh, PA 15230 (412) 373-4558 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation March 19,1982 U. S. Nuclear Regulatory Commission Washington, D.C.
20555 N
g Attention: Mr. R. A. Clark, Chief
[f
_6 c.3 Operating Reactors, Branch 3 y
<.w Re: Wisconsin Electric Power Company d
3-Docket Nos. 50-266 and 50-301 d
qi,@
Steam Generator Sleeving Repair Report, Rev. 1 gk g
Point Beach Nuclear Plant, Units 1 and 2 f
ff Gentlemen:
The material proprietary to the Westinghouse Electric Corporation (Westinghouse) in the Westinghouse report entitled " Point Beach Steam Generator Sleeving Report, WCAP-9960, Retision 1 (Proprietary), WCAP-9960, Rev.1," 10 copies of which were sent to you on March 11, 1982, by Mr. C. W. Fay, the Assistant Vice President of Wisconsin Electric Power Company was marked incompletely.
This resulted from an effort to complete the report in time for the hearings which were pending when this report was being prepared, but which have now been canceled.
Please make no public disclosure of the contents of this report, whether marked as proprietary or not.
A correctly marked version is being prepared, and should be printed and 4
delivered sometime the week of March 22, 1982.
Its substantive contents are the same as the report the regulatory staff is now reviewing. We see no reason that the staff's technical review cannot continue pending delivery of the correctly marked version.
- cerely, t
,} w)
Wl Francis X. Davis 00 cc: Judge Bloch Attorney 5
Judge Kline Judge Paxton sO S. Treby, Esq.
R. Bachmann, Esq.
B. Churchill, Esq.
K. Falk, Esq.
Atomic Safety & Licensing Board Panel Atomic Safety & Licensing Appeal Board Panel Office of the Secretary, Docketing & Service Section 8203240188 820319 PDR ADOCK 05000266 P
PDR