ML20041F440

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-460/82-01 & 50-513/82-01 on 820101-15 & Notice of Violation
ML20041F440
Person / Time
Site: Washington Public Power Supply System
Issue date: 02/24/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20041F441 List:
References
NUDOCS 8203160502
Download: ML20041F440 (2)


See also: IR 05000460/1982001

Text

4

,y

j

.y

9

f7

7

FEB 241982

>

Docket Hos. 50-460

50-513

a)

p

S>

4

g

RECE1VED

Washington Public Power Supply System

P.

O.

Box 968

5

MAR 15 EE2m- [@

Richland, Washington 99352

-

5sutus sy;en enume

-

8Eleus su:am as

Attention

Mr.

D.

W.

Mazur

4

M4

I

Program Director

to

Gentlemen:

Subject:

NRC Inspection

This refers to the routine inspection conducted by Mr. A. D. Toth

of this office, during January 1982, of activities authorized by

URC Construction Permit Nos. CPPR-134 and 174, and to the discussion

of findings held by Mr. Toth with Mr.

C. Edwards and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the er. closed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with URC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this Notice is to be submitted in accordance with

the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of

Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter an? the

enclosures will be placed in the NRC Public Document Room unless

you notify this office, by telephone, within ten days of the date

of this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of 2.790

(b)(1).

0203160502 820224

[-

DRADOCK05000g

emce >

gy:

.......e..

f

7'> . A

.T . . . .i.g.

.-

.

..

.

.

....

.

...

...

.. .. . ..

,

9

4.-

.d.d s. .

.B. . . . a n.1 k e n b e.r.r.y..

.. .

. .

. ...

.

.. ..

..

21.Wkl.. . ?0.YRL

2.l b.lR A. .

..

.. .. ........

.

............

. . . .. . .. ..

.. .

. . . . . . . . . .

L8"oe m cuo24o

OFFICIAL RECORD COPY

eu

m_m eu

r

.*

s#

W.shington Public Power Supply System

-2-

g4 g

Should you have any questions concerning this inspection, we will

bo glad to discuss them with you.

The responses directed by this letter and the accompanying Notice

cro not subject to the cicarance procedures of the Office of Management

cud Budget as required by the Paperwork Reduction Act of 1980, PL96-

511.

Sincerely.

Orioinal sinned bv

B. H. Faulkenberry

B. H.

Faulkenberry, Chief

Reactor Construction Projects Branch

Enclosure:

Appendix A, Notico of Violation

NRC Inspection Report

Nos. 50-460/82-01

50-513/82-01

cc w/o enclosures

R.

B.

Glasscock, Quality Assurance Director

DMB/ Document Control Desk (RIDS)

'

bec:

Distributed by RV:

Engelken (ltr & N.0.V.)

A. Johnson (1tr & N.0.V.)

'

ResidentInspector(5)

State of WA (Lewis)

i

J