Text
l f}
- r. g g--
...n b
f Q* ^
g
~
March 10, 1982 Docket Nos. 50-528, 50-529, 50-530 Arizona Public Service Company P. O. Box 21666 Phoenix, Arizona 85036 Attention: Mr. E. E. Van Brunt, Jr.
Vice President, Nuclear Projects IE INFORMATION NOTICE NO. 82-04: POTENTIAL DEFICIENCY OF CERTAIN AGASTAT E-7000 SERIES TD1E-DELAY RELAYS IE INFORMATION NOTICE NO. 82-05:
INCREASING FREQUENCY OF DRUG-RELATED INCIDENTS Gentlemen:
The enclosed Infomation Notices provide early notification of an event and a series of incidents that may have safety significance.
It is expected that recipients will review the Information Notices for possible applicability to their facilities.
If you have any questions regarding these matters, please contact this office.
Sincerely,
)
)
R.11. Engelken Regional Administrator
Enclosures:
IE Informatior; H5tict No. 82-04 IE Information N3tice No. 82-05 cc w/ enclosures:
F. W. Ilartley, APS G. C. Andognini, APS g
ome, p RV o L eunawa)
BIS ?
ENGELIKEN
' " "' "f/11f/ i)" "iFiH7db"
,,a8203160287 8203iO PDR ADOCK 05000133
.NRc C
PDR jFFICIAL RECORD COPY 4 um iseo-329 e24
SSINS No.: 6835 Accession No.:
8202040107 IN 82-04 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 March 10,1982 IE INFORMATION NOTICE NO. 82-04:
POTENTIAL DEFICIENCY OF CERTAIN AGASTAT E-7000 SERIES TIME-DELAY RELAYS Description of Circumstances:
On February 2, 1982, the Control Product Division, Amerace Corporation informed the U.S. Nuclear Regulatory Comission that approximately 20 percent of their AGASTAT E-7000 Series time-delay relays manufactured during the period between July 15, 1981 to January 12, 1982 may not operate properly.
Quality Assurance tests performed to ascertain acceptable performance over ex-tended time periods have determined that the pneumatic timing diaphragm manu-factured by one of two diaphragm suppliers exhibited a bleed-out of a fluid substance as a function of time and temperature. This substance may affect the diaphragm seal on the relays operated at high temperatures for extended periods, resulting in shorter time delays than those set on the relay dial.
Although the temperature required to initiate significant bleed-out would not be encountered in the majority of these relay applications, it is within the range of nuclear safety qualification tests required by IEEE-323 and IEEE-344.
In a letter dated February 2,1982, the Control Products Division of Amerace Corporation requested users to return all of the discussed relays for inspection and possible replacements. Copies of the letter and a list of the users are enclosed.The Control Products Division records do not identify individual nuclear power plants because most shipments were made to nuclear steam supply system (NSSS) suppliers, vendors, panel manufacturers, architects and engineers and utilities.
This information notice is provided as an early notification of a potentially significant matter.
It is expected that recipients will review the infor-mation for possible applicability to their facilities and take appropriate action as necessary. No specific action or response is required at this time.
-If you have any questions regarding this matter, please contact the Regional Administrator of-the appropriate NRC Regional Office.
Attachments:
1.
List of customers to whom applicable relays were shipped.
2.
Recently issued IE Information Notices k((D
^
f CONTROL PRODUCTS DIVISloN ttdChm00t I AVEHACE COHPORA'lON 1000 tilCKORY STREET IN 82-04 GR AFToN WISCONSIN 53024 (414) 377-0800 March 10. 1982 February 2,1982 Page 1 of 7 l
I i
i In accordance with 10CFR21 we are notifying you and the NRC of the following situation regarding some of the Agastat E7000 Serios time-delay rolays manufactured between the 24th week of 1981 and the 3rd week of 1982.
Extended-performance Quality Assurance tests have deter-mined that pneumatic timing diaphragms manufactured by one of two diaphragm suppliers exhibit a timo and temperature based, blood-out of a fluid substance.
This substance may affect the diaphragm seal on relays operated at high temperatures for ox-tended periods, resulting in shorter timo delays than those set on the relay dial.
Relays containing diaphragms from this supplier consti-tuted about 20% of our production and may have been shipped j
to fill your purchase order (s) as listed on the attached printout 4
I Although the temperature required to initiato significant bloed-out would not be encountered in the majority of normal product applications it is within the range of nuclear safety related qualification tests.1 We are, thorofore, asking you to return all E7000 relays from subject order (s), to my atten-l tion, for inspection and possiblo replacement.
Sorial numbers of all E7000 Series relays received by you during the time period concerned are attached.
I i
Please acknowledge roccipt of this notico.
If you need assistance in returning the listed items, please contact me.
Yours very truly, CONT,80L PRODUCTS D SION i
g
- fQjf,
!'I!CIC23 M. Q. Martin l
D. t/ /jy
- n l
Quality Assurance Manager
' U Yli 2 9' i
i MQM/vf 021h03U IIEEE 323 and IEEE 344 o
S w entoso; w l l<g yL RII
CUSTOMER NAMES I
Attachmert 1 f
IN 82-04 GENERAL ELECTRIC COMPANY P, arch 10,1982 175 Curtnor Ave M/C 016 Page 2 o+ 7 San Jose, CA 95125 i
Attn:
Jerrold B. Morris A
GENERAL ELECTRIC COMPANY f
Buckhorn Exit I85 - Rt 1374 l
P.O. Box 489 i
Mebane, NC 27302 l
l Attn:
QA Manager L. K. COMSTOCK P. O. Box 1094 i
Monroe, MI 48161 Attn:
QA Manager i
SOUTH CAROLINA ELECTRIC & GAS CO.
f P.O. Box 764 i
Columbia, SC 29218 i
Attn:
Mr. Sam Cash - QA Representative i
AUTOMATIC SWITCH COMPANY i
Hanover Road i
Florham Park, NJ 07932 Attn:
QA Manager EATON CORPORATION I
l!
Cutler-Ilammer Division 1349 Bryn Mawr Avenue Itasca,QA Manager IL 60143 Attn:
i NORTilERN STATES POWER COMPANY 414 Nicollet Mall Minneapolis, MN 54401 Attn:
QA Managor VIRGINIA ELECTRIC POWER COMPANY l
P.
O., Box 537 Richmond, VA 23204 Attn:
QA Manager BROWN-BOVERI GOULD INC.
i
, 4371 County Line Road Chalfont, PA 18914 i
Attn:
QA Manager 1 _
1
~
CUSTOMER NAMES _.
f IN 82-04 March 10,1982 GENERAL ELECTRIC COMPANY Page 3 of 7 P.O. Box 2149 1114 Old Concord Road l
Salisbury, NC 28144 1
Attn:
QA Manager li f
i FLORIDA POWER CORPORATION P.O. Box 14042 St. Petersburg, FL 33733 3
Attn:
QA Manager f
4 FLORIDA POWER CORPORATION l
P.O. Box 219 I
Crystal River, FL 32629 Attn:
Pam Mullins t
4 FISCHBACK LORD ELECTRIC COMPANY BOX 771 Hanford #2 l
Richland, WA 99352 l
Attn:
Gordon Kittle, Purchasing Agent l
WESTINGIIOUSE ELECTRIC CORPORATION I
SWITCHGEAR DIVISION 700 Braddock Avenue E. Pittsburgh, PA 15112 i
Attn: A. S. Merrill, Switchgear Purchasing 10NN COMSIP CUSTOMLINE i
1418 E. Linden Avenue Linden, NJ 07036 Attn:
QA Manager l
COLT INDUSTRIES FAIRBANKS MORSE 701 Lawton Avenue l
Beloit, WI 53551 j
Attn:
QA Manager i
l PHILADELPIIIA ELECTRIC CO.
l P. O. Box 8699 2301 Market Street N3-2 1
l Philadelphia, PA 19109 i
Attn:
Designer in Charge i
f l
i
=
g' CUSTOMER NAMES i
~
IN 82-04 ifarch 10, 1982 k',
BECHTEL POWER CORPORATION Page 4 of 7 I
P.O. BOX 60860 i
'l Terminal Annex 3
Los Angeles, CA 90060 i
Attn:
QA Manager l
!l FRANK ELECTRIC CORPORATION l
P.O. Box 69
?
Willow Springs Lane Road #5 s
York, PA 17405 i
Attn:
QA Manager I
i GENERAL ELECTRIC COMPANY P. O. Box 488 l
Agency Road l
Burlington, Iowa 52601 i
Attn:
E. F. McMillan TOLEDO EDISON COMPANY 300 Madison Avenue i
Toledo, OH 43652 i
Attn:
QA Director I
t INDIANA & MICHICAN ELECTRIC CO.
I f
P.O. BOX 60 Fort Wayne, IN 46801 l
Attn:
QA Manager RELIANCE ELECTRIC 4900 Lewis Road I
Stone Mountain, GA 30083 l
Attn:
Ms C. Eakin MERCURY CO. OF NORWOOD, INC.
l Subsidiary of bischbach & Moore, Inc.
P.O. Box 1687 l
10 Burke Drive Brockton, MA 02403 l
Attn:. Lawrence P. Capron, QA Manager j
NORTHEAST NUCLEAR ENERGY CO.
CONNECTICUT YANKEE ATOMIC POWER CO.
P.O. Box 270
. Hartford, CT 06101 I
Attn:
Norman Thomas (W24) 9
CUSTOMER NAMES
,tttachment 1 IN 82-04 LONC ISLAND LIGHTING COMPANY March 10,1982 Old Country Road Page 5 of 7 I
Mineola, NY 11530 Attn:
QA Manager BELOIT POWER SYSTEMS l
DIVISION OF LITTON INDUSTRIES 555 Lawton Avenue Beloit, WI 53511 Attn:
Roger Churchill, Purchasing Agent WISCONSIN PUBLIC SERVICE COMPANY 700 N. Adams Street P.O. Box 700 Green Bay, WI 54305 j
Attn:
Purchasing Department i!
,\\
[
SHOREHAM NUCLEAR POWER STATION i
P.O. Box 618 North County Road Wading River, NY 11792
[
Attn:
Mr. D.R. McCaffray, Project Engineer LILCO Project Office r!
AMERACE N.V.
P.O. Box 13 Industrielaan -
t Ille Industriezone i
9440 - EREMBODEGEM 1l 1
Belgium Attn:
Mr. Rudy De Schnepmeester i
SYSTEMS CONTROL CORPORATION P.O. Box 788 NO US #2
(
Iron Mountain, MI 49801 i
Attn:
QA Manager l
HARLO CORPORATIdN l
l CONTROL PANEL DIVISION ii 4210 Ferry Street i
l Grandville, MI 49418 l
Attn:
QA Manager l
WESTINGHOUSE ELECTRIC CORPORATION ii GENERAL CONTROL DIVISION 3900 West 41st Street Chicago, IL 60632 Attn:
QA Manager i
. _ ~
,..\\
pt.
{
1, CUSTOMER tlA.'1ES Attachmen2 1
,' [ck
,1982 SOUTHERN CALIFORNIA EDISON COMPANY
% Bechtel Power Corporation
' age 6 of 7 P
P.O. Box 450 San Clemento, CA 92672 Attn:
MS Gail Walters, Field Purchasing OMAHA PUBLIC POWER DISTRICT 1623 !!arney Street Omaha, NB 68102 Attn:
QA Manager FLORIDA POWER & LIGHT COMPANY
%.Ebasco Backfit P.O. Dox 2108 Ft. Pierce, FL.
33450 Attn:
QA Manager VERMONT YANKEE NUCLEAR PCWER P.O. Box 157 Vernon, Vermont 05354 Attn:
Greg Gillmore, Purchasing VIRGINIA ELECTRIC & POWER CO.
SURRY POWER STATION Route 650 Off INY 10 curry, VA 23883 Attn:
Purchasing Agent BECHTEL POWER CORPORATION P. O. Box 384 Route 11 5 Miles NE of Berwick Berwick, PA 18603 Attn:
Mr. I. E. Booher TENNESSEE VALLEY AUTHORITY 285 llancy Building Chattanooga, TN 37401 Attn:
QA Manager 4
COMSIP 3030 Red Hat Lane Whittier, CA 90601 Attn:
QA Manager ALABAMA POWER COMPANY P. O. BOX 2641 Birmingham, AL 35291 Attn:
Mr. J.W. McGowan, QA Manager
_._s 4
.2 m.
2
=
.2a
_aw.
mc_._
m m.
._u,.
m.
4
__..-2 m -
. 3 CIISTQMER_ EMES Attachmen2 1 IN 82 04 GOULD Mirch 10, 1982 i
2002 Bethel Road Page 7 o f 7 Finksburg, MD 21048 Attn:
QA Manager
-1 4
(
i 1
J 4
1 I
4 i
i 4
4 9
i i
i e
l 3 '
1 i
l 3
i J
i e
i t
I i
1 s
i 5
4' t
4 i
IN 82-04 March 10, 1982 RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No.
Subject Issue Issued to 82-03 Environmental Tests of 03/04/82 All power reactor Electrical Terminal Blocks facilities holding an OL or CP 82-01 Auxiliary Feedwater Pump 02/26/82 All power reactor Rev. 1 Lockout Resulting from facilities holding Westinghouse W-2 Switch an OL or CP Circuitry Modification 80-32 Clarification of Certain 02/26/82 All facility, Rev. 1 Requirements for Exlusive-materials and Use Shipements of Radio-Part 50 licensees active Materials 82-02 Westinghouse NBFD Relay 01/27/82 All power reactor Failures in Reactor facilities holding Protection Systems at an OL or CP Certain Nuclear Power Plants 82-01 Auxiliary Feedwater Pump 01/22/82 All power reactor Lockout Resulting from facilities holding Westinghouse W-2 Switch an OL or CP Circuit Modification 81-39 EPA Crosscheck Program -
12/23/81 All power reactor Low Level Radiciodine in facilities holding Water Test Program an OL or CP 81-38 Potentially Significant 12/16/81 All power reactor Equipment Failures Resulting facilities holding from Contamination of Air-an OL or CP Operated Systems 81-37 Unnecessary Radiation 12/15/81 All power reactor Exposure to the Public and facilities holding Workers During Events byproduct material Involving Thickness and licenses Level Measuring Device 81-36 Replacement Diaphragms for 12/3/81 All power reactor Robertshaw Valve (Model facilities holding No. VC-210) an OL or CP OL = Operating License CP = Construction Permit
~
1 SSINS No.: 6835 Accession No.:
8202040104 IN 82-05 UNITED STATES NUCLEAR REGULATORY C0fEISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 March 10, 1982 IE INFORMATION NOTICE NO. 82-05:
INCREASING FREQUENCY OF DRUG-RELATED INCIDENTS Description of Circumstances:
Based on data reported to the Nuclear Regulatory Commission (NRC) and either published or to be published in the Safeguards Sununary Event List (NUREG-0525),
the number of drug-related incidents in which licensee or contractor employees were arrested or terminated has increased dramatically in the past year. During the last 5 years, the increasing trend is as follows:
two in 1977; none in 1978; one in 1979; five in 1980; and twelve in 1981. Thus far in 1982, Regional Pre-liminary Notifications dealing with at least four new drug-related incidents have been issued.
The reported incidents implicate a range of licensee or con-tractor personnel, including personnel in construction, operations and security.
The reported incidents are widespread geographically, and involve power reactor sites in each of the five NRC regions.
Reported incidents have involved both onsite use or possession of drugs and personnel reporting to work under the influence of controlled substances.
Marijuana was the most frequently reported controlled substance involved in these events; however, incidents involving amphetamines, cocaine, hashish, phencyclidine and methaqualone have also been reported.
Given the alarming increase in reported drug-related incidents, the wide range of personnel implicated, and the pervasiveness of the reports on a national basis, the Office of Inspection and Enforcement (IE) has established a Drug Abuse Task Force to address the problem on a generic basis.
IE has given top priority to the prompt and effective development of a generic approach to the problem of possible drug (including alcohol) abuse by licensee or contractor personnel. As such, IE solicits relevant licensee experience in this undertaking.
l Teams from the Task Force are presently gathering information in a series of visits to selected licensees to discuss the drug problem and possible generic approaches that would best address the problem.
The Task Force is also collaborating with other members of the NRC staff to
-explore several regulatory approaches to the drug problem. The information obtained from the series of utility visits will be factored into the results j
of the inter-office efforts.
This information notice is provided as an early notification of a potentially significant matter.
It. s expected that recipients will review the information for applicability to their facilities.
No specific action or response is required at this time.
If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office.
Attachment:
Recently issued 'IE Information Notices 4
/1 1 7_ M_-(L.b
Attachment IN 82-05 March 10,1982 RECENTLY ISSUED IE INFORMATION :0TICES Infonnation Date of Notice No.
Subject Issue Issued to 82-04 Potential ~ Deficiency of 03/10/82 All power reactor Certain AGASTAT E-7000 facilities holding
< Series Time-Delay Relays an OL or CP 82-03 Environmental Tests of 03/04/82 All power reactor Electrical Terminal Blocks facilities holding an OL or CP 82;01 Auxiliary Feedwater Pump 02/26/82 All power reactor Rev. 1 Lockout Resulting from facilities holding Westinghouse W-2 Switch an OL or CP Circuitry Modification 80-32 Clarification of Certain 02/26/82 All facility, Rev. 1 Requirements for Exlusive-materials and Use Shipements of Radio-Part 50 licensees active Materials 82-02 Westinghouse NBFD Relay 01/27/82 All power reactor Failures in Reactor facilities holding Protection Systems at an OL or CP Certain Nuclear Power Plants 82-01 Auxiliary Feedwater Pump 01/22/82 All power reactor Lockout Resulting from facilities holding Westinghouse W-2 Switch an OL or CP Circuit Modification 81-39 EPA Crosscheck Program -
12/23/81 All power reactor Low Level Radiciodine in facilities holding Water Test Program an OL or CP 81-38 Potentially Significant 12/16/81 All power reactor Equipment Failures Resulting facilities holding from Contamination of Air-an OL or CP Operated Systems 81-37 Unnecessary Radiation 12/15/81 All power reactor Exposure to the Public and facilities holding Workers During Events byproduct material Involving Thickness and licenses Level Measuring Devices OL = Operating License CP = Construction Permit
,