ML20041F051
| ML20041F051 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/26/1982 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20041F052 | List: |
| References | |
| TAC-48143, NUDOCS 8203160139 | |
| Download: ML20041F051 (2) | |
See also: IR 05000206/1982002
Text
^:g
.
,
y
,rg.
,
FEB '2 6 1981
/
Docket No. 50-206
c, \\ *
-
O
[ RECElVED
Southern California Edison Company
,
P. O. Box 800
y
2244 Walnut Grove Avenue
-7
4
MARI51982a.I2
9
Rosemead, California 91770
Attention: Dr. L. T. Papay, Vice President
GNkp
D
Advanced Engineering
/
t*
Gentlemen:
e
Subject:
This refers to the routine inspection conducted by ifr. J. W. Hornor of
this office on January 25-29, 1982, of activities authorized by NRC
License No. DPR-13, and to the discussion of our findings held by
Mr. J. W. Hornor with Mr. W. ficody and other members of your staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
flo items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and semit written application to withhold information contained
therein within thirty days of the date of this letter. Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
h$[kDO
O
6
O
M'
Q
gdI
'
G
-
D. ". Sternberg, CMaf
/
'
"
Z
5"
su a
,
,
,
,
,
"* . .?n82
2/as/82
2/2q,2
,
.
.,,,,
,
,
,,,
,
,,,,
,
NRC P o,aM 318 00 80l NRCM O240
OFFICIAL RECORD COPY
,u m m o- m e2
~
1
.
Southern California Edison Company
-2-
FEB 2 6 ES2
/
Enclosure:
RV Inspection Report
No. 50-206/82-02
cc w/o enclosure:
Mr. R. Dietch, Vice President
Nuclear Engineering 1 Operations, SCE
4
fir.11. B. Ray, SCE
DMB/ Document Control Desk (RIDS)
Distributed by RV:
Engelken
State of CA (Hahn/ Johnson)
Resident Inspectors (3)
!
!
l
l
l
l
l
l
l
l
l
l