ML20040C142

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/81-18,50-519/81-18, 50-520/81-18 & 50-521/81-18 on 811001-31 & Notice of Violation
ML20040C142
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 11/17/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20040C129 List:
References
NUDOCS 8201270308
Download: ML20040C142 (2)


See also: IR 05000518/1981018

Text

~

m

YELLOW

.-

'

.

.

.

NOV 171981

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos.618/81M)50-519/81-18, 50-520/81-18 and

50-521/81-18

This refers to the routine safety inspection conducted by Mr.11. B. Swan of this

office on October 1-31, 1981, of activities authorized by NRC Construction Pemit

Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility.

Our

preliminary findings were discussed with Mr. R. T. Hathcote, Project Manager, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item ad references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

One new unresolved item is identified in the enclosed inspection report.

This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

t

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

.

8201270308 820118

PDR ADOCK 05000518

0

PDR

m

,.

-j

-

'

-

,

,

17 E

Tennessee Valley Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely.-

b

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

' Enclosures:

1.

Appendix A, Notice of Violation

2.

Report Nos. 50-518/81-18, 50-519/81-18,

50-520/81-18 and 50-521/81-18

cc w/ encl:

H. J. Green, Director of Nuclear Power

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N.' Culver, Chief

Nuclear Safety Review Staff

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

RII:RRPI

RII:RRPI

RU:RRPI

RII:RRP

y

- .)/14

W$

W$

W

W

f

dWBSwan:gr

JFSchapker

PTaylor

FCantrell

/ a I(/(

/

11/t1/81

11// 7/81

11// 7/81

11/t 7/81

.-

-

- - -

- -

.

-