ML20040C142
| ML20040C142 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 11/17/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20040C129 | List: |
| References | |
| NUDOCS 8201270308 | |
| Download: ML20040C142 (2) | |
See also: IR 05000518/1981018
Text
~
m
YELLOW
.-
'
.
.
.
NOV 171981
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nos.618/81M)50-519/81-18, 50-520/81-18 and
50-521/81-18
This refers to the routine safety inspection conducted by Mr.11. B. Swan of this
office on October 1-31, 1981, of activities authorized by NRC Construction Pemit
Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility.
Our
preliminary findings were discussed with Mr. R. T. Hathcote, Project Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item ad references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
One new unresolved item is identified in the enclosed inspection report.
This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
t
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of2.790(b)(1).
.
8201270308 820118
PDR ADOCK 05000518
0
m
,.
-j
-
'
-
,
,
17 E
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely.-
b
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
' Enclosures:
1.
Appendix A, Notice of Violation
2.
Report Nos. 50-518/81-18, 50-519/81-18,
50-520/81-18 and 50-521/81-18
cc w/ encl:
H. J. Green, Director of Nuclear Power
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N.' Culver, Chief
Nuclear Safety Review Staff
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
RII:RRPI
RII:RRPI
RU:RRPI
RII:RRP
y
- .)/14
W$
W$
W
W
f
dWBSwan:gr
JFSchapker
PTaylor
FCantrell
/ a I(/(
/
11/t1/81
11// 7/81
11// 7/81
11/t 7/81
.-
-
- - -
- -
.
-