ML20039B980

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 47 to License DPR-72
ML20039B980
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/1981
From: Fairtile M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20039B978 List:
References
47407, NUDOCS 8112280165
Download: ML20039B980 (2)


Text

i

?

,4 7590-01 UNITED STATES NUCLEAR REGULATORY COPNISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 47 to Facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Smyrna Beach and Utilities Comission, City of New

~

Smyrna Beach, City of Ocala, 0rlando Utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative.

Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications (TSs) for operation for the Crystal River Unit No.

3 Nuclear Generating Plant (the facility) located in Citrus County, Florida. The amendrent is effective as of the date of issuance.

The amendment revises Figure 3.1-7 of the TSs to be consistent with operational Cycle 4 application. The licensee failed to include this figure in their proposed TSs for Cycle 4 and subsequently, our approval of December 4,1981, of Cycle 4 did not include Figure 3.1-7.

This amendment, an administrative change, corrects that deficiency.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

8112280165 811210%

PDR ADOCK 05000302' P

PDR'

~.

-. _. _. _ _ _, _. - -. _., _. _ _ ~... _.. _. _ _ _ _ _ _ -.. _ -

7590-01 The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated December 8,1981,(2) Amendnent No. 47 to License No. DPR-72, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Florida. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 10th day of December 1981.

FOR THE NUCLEAR REGULATORY COMMISSION i

1 b'

Morton B. Fairtile, Acting Chief Operating Reactors Branch #4 Division of Licensing