ML20038A871
| ML20038A871 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/23/1981 |
| From: | Davis T INDUSTRIAL BATTERIES & CHARGES |
| To: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-PT21-81 QA-2991, NUDOCS 8111240355 | |
| Download: ML20038A871 (1) | |
Text
@ b=-
ATTERIES DIVISION (MMA) industrial Betteries and Chargers 3043 WALTON ACAD. PLYMOUTH WEETING. PE NNSYLVANIA 19462 TE LEPHONE : 216 828 0000. TELETYPE: 610 660-8436 November 13, 1981 QA-2991
-4 & W Y,3-
/
y,.
/
al'?f!fe
'y\\
Of fice of Inspection & Enforcement f*; '
!B "I
Region I
?
HL U. S. Nuclear Regulatory Commission E,
gy;f g
{
631 Park Avenue e.
. d).,' ' ' // 2[l5% " " d I King of Prussia, PA 19406
~'
Attn: far. Stewart Ebneter Q
Con en Ppwerito.
Palisados Plant Bechtel Job 12447-057 10CFR21 Report Gentlemen:
C&D Batteries acknowledges the receipt of the Bechtel Power Corp.
letter re: the subject of October 21, 1981, with the C&D TWX to Bechtel of November 2, 1981 (copies to Consumers Power Co., NRC Region I & III).
C&D is in the process of evaluating the reported condition which will include examination of the sectioned frame welds upon receipt from Bechtel. Comparise, will be made to those welds on the similar rack designed, tested and qualified at Wyle Labs on liovember 16, 1976 (Report #43450-1). Consideration will be given the application /in-stallation conditions observed by CLD personnel at the site (October 14
& 15, 1981).
The Commission will be advised immediately of our determination, and of any subsequent appropriate actions.
Very truly yours, T f/ i T. P. Davis, P.E.
Director Quality Assurance TED/h cc: NJ. G. Keppler, Region III NRC J. I. Dotson, Bechtel Power Corp.
("}7 S
c-...-
y 8111240355 81111'3
[g',
h.
.; 1 s, a 9
/
g ani Eltra jcompany
..... +
'6