ML20038A215

From kanterella
Jump to navigation Jump to search

UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 6 of 7 (Redacted)
ML20038A215
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/01/2018
From: Bhalchandra Vaidya
Plant Licensing Branch III
To: Bryan Hanson
Exelon Nuclear
Vaidya B
Shared Package
ML18117A015 List:
References
EPID L-2020-LRO-0002
Download: ML20038A215 (7)


Text

LaSalle UNITS 1 AND 2 UFSAR, REVISION 23 AND FIRE PROTECTION REPORT (FPR), REVISION 8 THE SECURITY SENSITIVE INFORMATION HAS BEEN REDACTED FROM THE ORIGINAL DOCUMENT.

THIS DOCUMENT PROVIDES THE REDACTED VERSION.

THE REDACTED INFORMATION WITHIN THIS DOCUMENT IS INDICATED BY SOLID BLACKEDOUT REGIONS.

l:

Gl LC' ~ 6<: lHS s

s REV. 17 APRIL 2008 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.5-1 FIRE PROTECTION SYSTEM (SHEET290F41 I EL. 6B7'-d 8

7 6

4 2

~I--

. _ i!:,g~...__._._'

~v~ OE: 'lHS l '

5

),

~

REV. 17 APRIL 2008 A

F B

o LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT B.

c F

A I

FIGURE 9.5-1 FIRE PROTECTION SYSTEM

( SHEET 300F4f EL.687'-0" 8

7 4

2

REV. 17 APRIL 2008 3

I 4

5 6

I B

~~.:IO ~E -'lHS F

F E

o E

o c

c EL.677'-0*

flI1'l"'!

1 I

( SHEET 310F41 )

FIGURE 9.5-1 FIRE PROTECTION SYSTEM 2

LA SAllE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT I

t 4

A B

REV. 19 APRIL 2012 B

~".:IO 2t-133HS E

B

. L.

6 a

s 4

3 E

LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT A

FIGURE 9,5-1 FIRE PROTECTION SYSTEM

.( SHEET 32 OF 41 )

EL. 663'-0' 2

REV. 19 APRIL 2012 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9,5-1 FIRE PROTECTION SYSTEM

( SHEET-33 OF41 )

EL.663'-0"

B D

E F

REV. 17 APRIL 2008 8

6 5

4 3

~v.:lo V~.LHS F

B E

c D

A 6

t 4

LA SALLE COUNTY STATION A

UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.5-'

FIRE PROTECTION SYSTEM (SHEET340F41 )

EL. 663'*0*

3 2