Forwards long-range Planning Program Semiannual Update of Integrated Schedule ABC Project Listing,Consisting of Changes Made Since Last Submittal Forwarded by
ML20036A878
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/06/1993
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C-93-2087, C000-93-2087, C311-93-2053, NUDOCS 9305170125
Download: ML20036A878 (32)


Text

,

c' GPU Nuclear Corporation

.. - Nuclear "n::ur*

Middletown, Pennsylvania 17057-0480 f

(717) 944-7621 Writer's Direct Dial Number:

May 6, 1993 C000-93-2087 C311-93-2053 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Docket No. 50-289 Operating License No. DPR-50 Long Range Planning Program (LRPP)

Semi-Annual Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN) Corporation hereby submits the required semi-annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule. The attachments to this letter include:

1) the ABC project listing, and 2) a summary of changes since the last submittal forwarded by GPUN Letter No.

C311-92-2135, dated November 9, 1992. An abstract of the attachment follows:

1.

Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects and a double asterisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing.

Remaining projects are ongoing or are scheduled consistent with cycle / year commitments. Any changes in schedule are reflected on Attachments A and B.

l 140050 9305170125 930506 M

fhV {

PDR ADOCK 05000289 R

PDR 4

GPU Nuclear Corporation is a subsidiary of General Pubhc Utihties Corporation g

r C000-93-2087 C311-93-2053 i

Page 2 2.

Attachment B - A summary listing of Category A and B projects which l

have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The listing also contains Category C project completions. Changes to the Category C scope or schedule do not impact the Category A and B schedules.

Five (5) additions to the list of Category B projects have been made by this submittal. Pursuant to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in agreement with the above Category A and B changes, unless we are notified otherwise within 15 days of receipt.

Sincerely, A

c/

R. L. Long VicePresidentan6 Director Services & THI-2 Divisions RLL/GMG/ pip l

cc:

Administrator, Region I f

THI-I Senior Project Manager r

TMI Senior Resident Inspector l

I t

i 31193?D53 LET i

j

L ABC Classifications l

a)

Meet NRC Recuirements (NRR) - Activities that a) must be carried out l

to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.

b)

Meet Environmental Recuirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and l

l Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c)

Meet Other Reouirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

d)

Increase Safety Marains (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required l

for regulatory compliance nor required by safety regulations, codes or guidance.

e)

Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f)

Improve Radioloaical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower t

man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

~

(

g)

Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by l

preventing deterioration of plant systems or equipment.

Includes activities in response to national codes and standards, insurance l

policies, equipment vendor specifications or nuclear industry high f

unavailability equipment data without which the plant could not operate prudently.

l l

h)

Improve Reliability / Capability (REL) - Activities that, if l

implemented, will increase power generation by improving availability l

or capacity factor to maximize energy output.

l I

311932053.LET i

j n

4 1

\\

ABC Classifications (continued) i)

Imorove Operational Effectiveness (10E) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.

j)

Imorove Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.

~

k)

Provide Continaeiicy/ Blanket (CUI) - Activities that, if implemented, i

will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1)

Improves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.

t l

1 I

311932053.LET

e 9

e ATTACHMENT A TMI-1 PROJECT LISTING INTEGRATED SCHEDULE SEMI-ANNUAL UPDATE (MAY,1993) l l

l ~

311932D53.LET l

_____.___._____________s

- =..

~

4 TMi.1 PROJECT LISTING LEGEND NRC 1 NTEGRATED SCHEDULF NEW PROJECTS

....a...-...................................

    • BA NUMBER CHAhGC CATEGORY 'A' PROJECTE

' SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA

- DESCRIPTION CYCLE /

CLASSlFICATION NUMBER YEARS

-1 126236 REVISED 10CFR2O IMPLEMENTATION 92/93 NRR 4

IMPLEMENT REVISION TO 10CFR20 STANDARDS FOR PROTECTION AGAINST RADIATION BY MODI FYING SOFTWARE, PROCEDURES 8e TRAINING d

ji

. _ _., - _. _ _. _ _ _ _ _ _. _. _ _. _ _ _ _ _ _ _ _ _... _ -... _. _. _ _. -. _. -.,... -, _ _ _ _ _, _ _ -.. -.. _ _ -... -. _ _. _.. _ _ _.,. - - _ _.. _.. _ _ _. _ _ _. -... - _ _ _ ~.

TM i.1 PROJECT LIST l NG LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 2 123321 REACTOR BLDG TENCON SURVElLLANCE PROG 10 NRR PROVIDES FOR VENDOR SERVICES AND PLANT SUPPORT FOR NEXT TENDON SURVEILLANCE REF. NUREG 1351; TS 4.4.2.1 3 128108 TF SEISMIC QUAL OF EQUIPMENT (SOUG) 10 NRR WALKDOWNS FOR SQUG WHICH DO NOT REQUIRE AN OUTAGE TO PERFORM REF. USI.A46 ; GL 87 02 4 123289 ILRT - 10R 10R NRR RB INTEGRATED LEAK RATE TEST OF CONTAINMENT 1993.

REF. TS 4.4.1.1 5 123290 OTSG TUBE PLUGGING - 10R 10R NRR RB PLUG OTSG TUBES AS NECESSARY. PLAN FOR 10 NEW PLUGS (5 TUDES) PER OTSG & REPLACE 15 IN A & 10 IN B (ROLLED). REF TS 4.19 6 126231 OTSG EDDY CURRENT TESTING 10R NPR RB.

ECT OF SAMPLE INSPECTION GROUP, 3%

INSPECTION PER OTSG PER TS 4.19 AND POST SLEEVING INSPECT.

7 126234 TMl INSERVICE INSPECTION-10R NRR ALL ASME SECT XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10 CFR 50.55A 8 -128108 TF SEISMIC QUAL OF EQUIPMENT (SQUG) 10R NRR WALKDOWNS FOR SQUG WHICH MUST BE DONE DURING AN OUTAGE REF USI.A46 ; GL 87-02

.. _ __ _ _.. _ - _ _ - - _. - _ - -... _..,, _ ~.. _ - _.., -. _,. _

_... - ~. _. ~ _.,.

THI-1 PROJECT LlST lNG LEGEND NRC i NTEGRATED SCHEDULE a

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY

'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 9 128148

  • EROSION / CORROSION PROGRAM AND INSPECTION 10R MRC ESTABLISH THE LONG TERM CORP PROGRAM AND COORDINATE AUGMENTED INSPECTIONS TO DE-TECT E/C AT TMI-1. (GL 89-08) 10 128155 SOLEN 0l0 VALVE / LIMIT SWITCH UPCRADE 10R NRR REPLACE 45 COMERCIAL GRADE LIMIT SWITCHS AND 18 SOLEN 0lD VALVES ASSOC WITH NSR VALVES PER REG GUIDE 1,89 & 10CFR 50.49 IST CHECK VALVE NON-INTRUSIVE TESTING 10R NRR 11 128176 EVAL OPTIONS FOR NON-INTRUSIVE TEST OF CHK VLVS CF-V4A/B,5A/B, MU-94,95,86A/B

& 220 10 MEET ASME SEC.XI & GL 89-04 12 412611 REPLACE EIM MOTOR ACTUATORS-10R NRR REPLACE EIM MOTOR ACTUATORS WITH LIMi-TORQUE NOTOR ACTUATORS FOR 4 VALVES TO PROVIDE TEST CAPABILITIES PER GL 89-10.

13 123328 OTSG TUBE PLUGGING 11R NRR RB PLUG OTSG TUBES AS NECESSARY.

REF. TS 4.19 14 12694G OTSG EDDY CURRENT TESTING 11R NRR RB ECT OF SAMPLE-INSPECTION GROUP, 3% PER OTSG TECH SPEC INSPECTION REF. TS 4.19-15 12694H TMI INSERVICE INSPECTION 11R NRR ALL ASME SECTION XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A

. ~... _.,, _,. -.,..... _. _.,_

q

}

THl.1 PR0 JECT L 1ST INO LEGEND NRC-INTEGRATED SCHEDULE

  • - NEW PROJECTS
    • BA NUMBER CHANGE CATEGORY

'D' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSlFlCATION NUMBER YEARS 16 128 ADS

  • EROSION \\CORROS PROGRAM FOR TMI 11R NRR ALL AUGMENTED INSPECTIONS TO DETECT EROSION /EEGREDATION OF TMi SYSTEMS REF GL 89-08 17 123ABC OTSG TUBE PLUGGING 12R NRR PLUG OTSG TUBES AS NECESSARY. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX.

ISTING PLUGS. REF. TS 4.19 18 123334

'ECT OF SAMPLE INSPECTION GROUP. 3%

PER OTSG PER T.S. 4.19 21 128 ADS

  • EROSION / CORROSION INSPECTION 12R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /

CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS. REF. CL 89 08 22 128097.

SQUG USERS GROUP PROGRAM 88 93 NRR SEISMIC QUALIFICATION UTILITY GROUP PARTICIPATION REF. USI.A46 : GL 87 10

TM i -1 PROJECT LISTING

^

LEGEND NRC i NTEGRATED SCHEDULE

---~~~

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY. CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 ODS DA OESCRIPTION CYCLE /

CLASS!FICATION NUMBER YEARS 23 412596 TMI-1 INDIVIDUAL PLANT EVALUATION 89-93 NRR INDUSTRY DEGRADED CORE ACTIVITIES

& PLANT SPECIFIC NRC SUBMITTAL.

(REF LAl 89-9250) 24 128152 MOV PROGRAM 90-94 NRR DEVELOP & IMPLEMENT MOV PROGRAM TO MEET GL 89-10.

REF. MEMO C311-90-3132,C311-89-2117

'25 412617 TMi'IPE EXTERNAL EVENTS 92-94 NRR PERFORM THE (PE ANALYSIS FOR EXTERNAL EVENTS - REF: LETTER NO. C311-91-2150 &

LAI 91-9238, 9239.

26 419255 SIMULATOR MODIFICATIONS - TMl (1993) 93 NRR UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIONS.

REF RG.1.149, ANS 3.5 2T 41994H SIMULATOR MODIFICATIONS - TMl-(1994) 94 NRR UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIONS.

1 REF. RG 1.149, ANS 3.5 28 41995G SIMULATOR MODIFICATIONS 95 NRR UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MODS REF.'RG 1.149, ANS 3.5 29 41996D

-SIMULATOR MODIFICATIONS 96' NRR UPGRADE SIMULATOR CONSISTENT WITH CONTRL ROOM MODIFICATIONS REF. RG 1.149, ANS 3.5

- - m-.

_.,4

-s-..aa e..u-,

-....wme...wa....

..me.w---.r,w-n

-y

.., - -.,+...

/.

,,n,e-ry

, -,. +... _

,,.-m, er w ~ r e-e, w.

e-

-r-t w.et---*

t

TM l

-1 PROJECT LIST ING LEGEND NRC 1 NTEGRATED S C H'E D U L E NEW PROJECTS


~~--~~-------------------------

    • DA NUMBER CHANGE CATEGORY

'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93

- OBS BA DESCRIPil0N CYCLE /

CLASSIFICATlON NUMBER YEARS 30.41997C SIMULATOR MODIFICATIONS 97 NRR UPGRADES TO THE SIMULATOR TO BE CONSIST-ENT WITH CONTROL ROOM MODS REF. RG 1.149, ANS 3.5 4

I..

i a

l' f


e u.~~w

,...,e,wam.

<e--m.-*w-en www..--.e.v-

-,e--,-,-

--m---,---,w.~~-,~.<~~e.w'.

.w-

--w

--,---,-.-~~n--

- - - - ~ ~,, - - -, - - - - - - - - - - - -.

TH I-1 PR0 JECT L1 STING LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 31 225012

  • PDMS ELECTRICAL MODS 09 IDE SIMPLIFY AND DOWNSIZE TMI.2 ELECTRICAL SYSTEM FOR PDMS 32 4125TT ADD *L TURB. BLDG. k INT. BLDG, PLATFORMS 09 ISM DESIGN, PROCURE, AND INSTALL PERMANENT t

MAINTENANCE PLATFORMS IN TURBlNE BLDG AND THE BWST TUNNEL 33 412625 FOXBORO RECORDER REPLACEMENT 09 MRC REPLACE 11 FOXBORO RECORDERS WITH UNITS THAT ARE MORE REllABLE AND EASIER TO MAINTAIN 34 412628 REACTOR BUILDING COOLING SYS TIE.lN 09 GWC INSTALL EXTERNAL Tit.IN PolNTS TO ENABLE AN EXT CHILLED WATER SYSTEM TO PROVIDE RB VENTILATION DURING SUMMER OUTAGES.

35 418T66 TMI.1 LIGHTING ENHANCEMENT 09 NRR IMPROVE THE SECURITY LIGHTING AROUND THE 1

'1MI 1 MAIN PLANT AREA AND INSTALL LIGHT.

ING @ THE CHEMICAL CLEANING PlTS.

36 418794 PLANT PRESERVATION. BOP (CAPITAL) 09 MRC TB IB SCAFFOLD, SURFACE PREP, PAINTING, CLEANUP OF WALLS, PRETREATMENT DLDG.

37 418801 IMPROVE PLANT PAGE SYSTEM 09 REL REPLACE APPROX. 24 HANDSETS,1NSTALL 24 NOISE MONITORS, INSTALL PHONE INTERFACE UNIT IN NOB, OTHER RELATED ITEMS

--..a

THI-1 PR0 JECT LI STI NG LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 38 418803

'TMt.2 LIGHTING ENHANCEMENT 09 NRR IMPROVE THE SECURITY LIGHFING AROUND THE TMt.2 MAIN PLANT AREA.

39 418807 PLANT PRESERVATION (BOP) PROGRAM 09 MRC 1993 PORTION: APPROX 13,850 SQ FT lNCLUD TB WALLS (9000 SQ FT),PRETREAT BLDG FLOORS (4850 SQ FT) 40 419710 UNIT 2 ADMIN BLDG 09 FAC ENGINEERING STUDY, VENTILATION AND HVAC MODIFICATIONS 41 419724 REMODEL & CONSTRUCT ADDITION.BLDC 43 09 FAC PROVIDE FOR MAINT TRAINING LABS IN EXISTING STRUCTURES.

42 419735

  • SECURITY EQUIPMENT - TMl 09 MRC PROC.& INSTALL PlDS Plc SYSTEM;REPL SLID GATE OPERATORS,CCTV CAMERA & MONITORS, RADIOS, PROCURE PORTABLE GUARD HOUSE 43 419737
  • TMl SECURITY ENHANCEMENTS 09 ISM AS A RESULT OF THE INTRUDER EVENT AT TMI VARIOUS DETECTORS, BARRIERS,ETC. WILL BE INSTALLED.

44 419737

  • -TM1 SECURITY VIDEO ENHANCEMENTS 09 ISM AS A RESULT OF THE INTRUDER EVENT AT TMI VARIOUS DETECTORS, BARRIERS,ETC. WILL BE INSTALLED.

i 3

9 Y.

A.

M.

3 0

F e

O S..

A.

v S.N U.O T

A.I ST T

A C

I M

L E

M C

C C

. F S

E 0

S A

A R

I I

R 1

I F

F M

. S

. S

. A

. L

. C E.

G L

i N.

U I

D.

a T.

E S

. /

H.

. ES i

. LR.

C.

CA.

0 0

0 0

0 0

0 e

. YE 1

1 1

1 1

1 1

L.

S.

CY.

+

T S

C D..

T C

E.

E J

E.

T.

O J

R A

P 0

e H.-

'C R..

m G.

P..

E.

Y S

A E

N N

R M

G DS V Z S

O E

I DE R

n r

O R

TD NS E

lE R

I D

NH E'

T.

1.

G O

NL AE lT E

T TII E

AT W

N-E F

EB C

E AS D

A UDS I

,O O

w

&L T

T N

SO T

RA S

D C OD T

LR S

EW M A O

AH ETG t

i 1

A A A C

L MB EP A

ND R

LE L

E T

, R N

FE M.

=

P RR N

W I A O

B E

CNR T

UNI OH C.

EU AT MR F

T R

NAO C TOD OT T.

PT PN C

E T

NO E

N U

CIL R

D LE TL I

DE A

ET E

FF R

UTI N

G A

S R.

H L

N C

OS T

RI U GO' c

+

N-L LH N

UP M

MT P

AT N

A S

TDB N

E N 'S SD I M

.w B

AT O

O P

ME E

RAE TE)

T I

DE W

GH G RY F

ROG SN T

AH T

D E

AI N D

E C

4 N

I A

ET L

0I L

PE TI N

PEI 9

IST0 T

NI S-v I

S I

R L

6W B

P DCD U

UHV 9

XY1 C

r.

O R

R DO N

EUL O

STR 1

ES3 w

N DM F

RT P

0LO E

NC O

TRI F

E 3

O NRL I

C 3ET T

AS I

CTU

,R S T YG T

ESB N

NO N

RNL AOE T

GR N

LA I

S A

I TN O

I H

M SF(

I P

B

,T N A

OI I

NAO D

MS D

OOV I

OFE E

AIE

.T FN N

MNC TLR I

D EAU U

RDE T

ERP E

RA D

RCR T

TST E

SO R

L RLT Q

FLH S

NAA M

OE A

P E

. C B

UP IT Y

APV R

FR WS I

AN C

EOG

-e D

DlF A CRD

. S C

T T

SU S

M E

E TA G EO D

N - 0 L E L

m OES N

EBN RN T

A D

HLE A

UE' P

NWB

+

.E B

RCW E

L

.D R

PNB U

BYI N

EI E N

LS L

TLH OI E E

E I

P T

I PUD B

AT G

FTD R

FNY U

A L

ARR M MS /

OE E

D I

G lLA w

R A

T

,N E F

CAE E

LEA E

EIZ E

TOO L

LMS NEH F

IT D

LTW N

DRI I

C AOH l

ELI C

ATT B

LR N

B.'

I AL VAL

-r E

E.

'D IGTT E

ELU AS I

VVA V ODN V TFT F

OTI L

G

/.

N TI P M TYC B

e SI D S

UXM R

SSS R

O N

R LRO R

SRR O

MSX N

L.

.A D

EAN M

OUO E

N I

U RNI E

EAI E

NEO D ENU C.

A DMA R

RAC P

I RM T

PIF S

RWT S

IPN R

RI A SH Y.

C.

4 TC e

C

/

e V.

ER w

JE R.

OB O.

RM C.

PU E

N T.

c W

A

.R 7

5 2

5 0

0 8

D EA C.AB.

7 0

1 1

5 5

9 E

N NB 5

6 6

6 T

T T

2 2

2 2

8 8

8

+

Y.BM.

E -

G-B.

U.

1 1

1 1

1 1

1 E-4 4

4 4

4 4

4 N.

L***

T.

R O

S 5

6 T

8 9

0 1

S.B 4

4 4

4 4

5 5

~

. O a

w

^

TM i 1 PR0 JECT Ll ST I NG LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS

-SORT BY CATEGORY / CYCLE /BA STATUS A3 0F 03MAY93 OBS -

BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 52 ~h16807 PLANT PRESERVATION (BOP) PROGRAM 10 MRC 1994/1995 CAPITAL (NEVER BEFORE COATED)

PORTION OF THE BOP PRESERVATION PROGRAM

-(APPROX 17% OF THE TOTAL PROGRAM).

53 419669 TMI ROADS UPGRADE 10 FAC NORTH BRIDGE' PAVING, LIBERTY LANE UPGRADE,RESTRIPING, UNIT 2 RX HATCH IMPROVEMENT 54 419689 ROOF REPLACEMENTS 10 FAC REPLACE ROOF ON BLDG 36, WAREHOUSE 1, WAREHOUSE 3, AND DEWEY HOUSE.

55 419707 OUTAGE FABRICATION FACILITY 10 GWC DESIGN AND CONSTRUCT FACILITY TO SUPPORT F AB ACTIVITIES FOR PLANT MODS AND MAINT.

TO REPLACE EXIST DELAPIDATED SHOPS.

56 419727-

  • CONSTRUCT STORAGE FACILITY 10 GWC PROVIDE FAClllTIES FOR IS TELEPHONE PERSONNEL, WASTE MANAGEMENT & OTHER DIVISIONS 57 419735
    • SECURITY EQUIPMENT - TMl 10 MRC REPLACE VARIOUS SECURITY EQOlPMENT 58 995100'
  • MOBILE XFMR ON SITE STORAGE 10 GWC GPU SYSTEM MOBILE GENERATOR STEP UP(GSU)

TO BE STORED AT TMI SITE. OIL SPILL CON-TAINMENT AND ELEC WORK REQUIRED.

,.-___-.,_..u._._.-_._-.-

_~,.

..,_.,.-.a...,

1 PR0 JECT L i S T l'N G TM i LEGEND NRC - I NTEGRATED SCHEDULE i

NEW PROJECTS

    • BA NUMBER CHANCE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS As OF 03MAY93 OBS-BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 59 123D00 OTHER OUTAGE RELATED ACTIVITIES 10R ALL ALL OUTACE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES, MINOR MODiflCATIONS, MOD SUPPORT, ETC.

60 123294 RX REFUELING - 10R 10R MRC RB 76 80 FUEL ASSEMBLIES, LOAD FOR 650 EFPD.

REVIEWED 61 123315 REPL CRDM FLANGE GASKETS / BORON REM 10R 10R MRC INSPECT FOR BORON AND REPLACE UP TO 18 CRDM FLANGE GASKETS (35 REMAIN).

RE.

MOVE BORON DEPOSITS FROM HEAD AS REQ'D.

62 123316 MAIN CONDENSER PRESERVATION PROCRAM.10R 10R MRC TB DETAILED INSPECTION AND REPAIR OF MAIN CONDENSER COATING, REPLACEMENT OF 120 (MAX) ANODES AND EDDY CURRENT TEST 63 123319 RX BLDG PRESERVATION PROGRAM 10R MRC PRESERVATION IN THE REACTOR BUILDING.

1300 SQ FT OF IC & NS PIPE AND 10675 SQ FT OF STRUCTURE.

64 412536 DIGITAL INST AND CONTROL MOD 10R ISM 10R IS TO INTRODUCE FOXBORO 1/A INTO THE PLANT. REPLACE SELECTED NNI I&C FUNCTIONS. BALANCE IN 11R.13R 65 412552

  • MODIFICATIONS FOR SElSMIC QUALIFICATION 10R NRR ALL MODIFICATIONS TO COMPLY WITH SEISMIC QUAllFICATIONS.-SCOPE TO BE FINALIZED AFTER USl-A-46 WLKDOWNS (REF BA 128108)

,a

  • -#,,m.-.u--

em- - - -

.--r..ww.-=-

..e.

+,c-w.

-v<,---,

,-.-,w-,

.-~,~,w---

,-c....

,s+-

--,---,n.-

e

.-e

.--e--.e..

e---

TMi 1 PR0 JECT LISTING LEGEND NRC I NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CL ASS I F I CAT ' ON NUMBER YEARS 66 412570 REPLACE GASEOUS CHLORINATION SYSTEM 10R ISM RIP OUT OF CHLORINE LEAK DETECTION SYSTEM FROM THE CONTROL TOWER 67 412604 CONTROL ROD REPLACEMENT - 10R 10R MRC RB REPLACE 48 CONTROL RODS DURING REFUELING 68 412612 PERM DEMIN SYST IN PRLL W MISC WASTE EVA 10R 10E TIE IN CONNECTION CAPABILITY REQUIRED TO DE DONE IN AN OUTAGE. BALANCE OF WORK TO BE DONE IN CYCLE 10.

69 4126gg OTSG TUBE SLEEVING 10R REL SLEEVE APPROX. 125 TUBES PER OTSG IN THE LANE WEDGE REGION 70 412623 FOXBORO TRANSMITTER REPLACEMENT 10R NRR RB REPLACE 15 PRESSURE & DIFFERENTIAL PRESS TRANSMITTERS; 3 ARE ASSOC WITH ES, 8 W/

OTSG LEVEL INDIC AND CCNTROL & 4 W/ RPS.

71 412626 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI) 10R MRC CB. AB INSTALL NEW AMPLIF IERS & SIGNAL PROCESSING UNITS, ROUTE CABLE -

PHASE 1. PROJECT TO COMPLETE IN 11R.

72 412627 HSPS UPGRADES 10R REL ADD SOLEN 0lDS, FUSES,POSITIONERS FOR FW &

MS VLVS, STATUS'LGTS FOR MSV 13A&B, MODIFY FIRE BARRIER AND ADD COMPUTER ALARMS

~ ~

. ~.

T H 1. - 1 PR0 JECT LIST I NG LEGEND NRC 1 NTEGRATED SCHEDULE

+

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 085 BA DESCRIPTION CYCLE /

CLASSiflCATION NUMBER YEARS 73' 412629 MAIN F.B. VARBLE FREQ DRIVE SYS 10R REL REPLACE THE EXISTING'THYRISTOR DRIVE MOTOR CONTROL ON MAIN FUEL HANDLNG BBIGDE W/ VARIABLE FREQUENCY SPEED SYS 74 412633 HPI PIPING UPGRADE 10R ISM MODIFY HPI PlPE SUPPORTS TO ADDRESS HIGH TEMP. EXPERIENCED DUE TO CHECK VLV BACK LEAKAGE. 31 SUPPORTS MAY REQUIRE MODS.

75 412638-HEATER DRAIN PlPING REPLACEMENT 10R MRC TB REPLACE ERODED HD PIPING (PARTIAL)

WITH COMPONENTS MORE RESISTANT TO EROSION / CORROSION 76 412642 ICCW FLOW IMPROVEMENT 10R REL REPLACE CHECK VALVES AT (CCW PUMPS WITH SMALLER VALVES.

77 418800 RC.P CARTRIDGE SEAL CONVERSION KIT-10R 10R MRC RB INSPECT / REPLACE SEALS ON 2 RCPS WITH WESTINGHOUSE CARTRIDGE SEAL CONVERSION-KITS AND MODIFY 2 ARTICULATED ARM ASSEMB 78 412648

    • RADWASTE STORAGE CAPABIL PHASE 2 11 NRR PROCURE EQUlP & CONSTRUCT STORAGE FACILITY FOR LLRW STORAGE lEN 90 09 GL 81-38 79 418ABJ
  • CONTROL TOWER 4TH FLOOR REMOD 11 OWC REMODEL. CONTROL TOWER FOURTH FLOOR SCOPE TO BE DETERMINED

m THI-1 PR0 JECT LIST I NG LEGEND NRC 1 NTEGRATED SCHEDULE

~*

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSlFICATION NUMBER YEARS 4

80 418812 ROOF REPAlR$ - 1996 11 MRC REMOVE, REPAIR AND INSTALL ROOFING 81 '419T28 RENOVATE BLDG 222 11 GWC RENOVATE BLDG EXTERIOR,REMODEL INTERIOR, REFURBISH ELECTRICAL, INSTALL CENTRAL HVAC & HOOK UP DOMESTIC WATER 6

82 419735

    • SECURITY EQUIPMENT - TMI 11 MRC REPLACE VARIOUS SECURITY EQUIPMENT 83 41994C REPLACE BUILDING 400 11 FAC L

DEMOLISH EXISTING CONNECTED TRAILERS AND COMMON ROOF.

CONSTRUCT A NEW BLDG FOR SECURITY, GET, ARWT AND OUTAGE PROCESSNG l

84 123GGG OTHER OUTAGE RELATED ACTIVITIES 11R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS. MOD SUPPORT, ETC.

85 123329 REACTOR REFUELING - 11R 11R MRC RB APPROX 68 NEW FUEL ASSEMBLIES FOR 650 EFPD 86 123330 RX BUILDING PRESERVATION 11R MRC RB PRESERVATION OF THE REACTOR BUILDING

... _ ~ -. _. _ _ _ - _ _. _ _ _ _ - _ _ _.,. _ _... _.. _. - _ _ _. _ _. -

~._-.,, - -

TMi -1 P R O -l E C T L iSTING LEGEND NRC I NTEGRATEL CHEDULE s

NEW PROJECTS

    • DA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASS I F I CAT I ON NUMBER YEARS 87 123331 CRDM FLANGE GASKET REPLACEMENT 11R MRC REPLACE 17 CRDM FLANGE GASKETS 88 123335 REPLACE MAIN STEAM LINE INSULATION 11R MRC REPLACE DEGRADING INSULATION ON MAIN STEAM LINE 89 412ACW EROSION / CORROSION PIPE REPLACEMENT 11R MRC 11R SCOPE, IF ANY, IS DEPENDENT UPON 10R INSPECTION RESULTS.

l l

90 412536 DIGITAL INST & CONT MOD 11R ISM PHASE 11 IS THE FoxBORO I/A INTERFACE l

WITH DTCS (BA 412609), CRT CONTROL OF SELECTED MU & RCP FUNCTIONS.

i 91 412552 MODIFICATIONS FOR SEISMIC QUALIFICATION 11R NRR i

ALL l

MODIFICATIONS TO COMPLY WITH SEISMIC QUALIFICATIONS SCOPE TO BC FINALIZED AFTER USI-A-46 WLKDOWNS (REF BA 128108) 92 412608

. OPTIONS TO REDUCE IRON TRANSPORT TO OTSG 11R MRC REVIEW SECONDARY SYSTEM CHEM HISTORY l

& INDUSTRY PRACTICES, RECOMMEND

(

CORRECTIVE ACTIONS TO MINIMlZE OTSG CRUD 93 412609 DIGITAL TURBINE CONTROL SYSTEM (DTCS) 11R REL l

UPGRADE MAIN TURBINE EHC ELECTRONICS WITH DIGITAL CONTROL SYSTEM TO IMPROVE RELIABILITY OF TURBINE CONTROLS

.. -.-_...a... = - -.. - -. -. - -,. - -

..,.. -. -. -..-, ~. - -. - -.-.. -- -.. -.

TMi-1 PROJECT L 1ST I NG LECEND NRC 1 NTEGRATED SCHEDULE

  • . NEW PROJECTS
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS DA DESCRIPTION CYCLE /

CLASS I F I CAT I ON NUMBER YEARS 94 412626 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI) 11R MRC CB RB REMOVE BF.3 DETECTORS FROM Ni-1,2; ADD ADDITIONAL FISSION CHAMBERS FOR NI-11A, 12A CHANNELSI ROUTE CABLE. (PHASE 2)-

95 412644 REPLACE INVERTERS 11R MRC REPLACE 385 15KVA INVERTERS. MODIFY CABLES AS NECESSARY. PHASE 1 IS TO DETERMINE MOST ECONOMIC SOLUTION.

96 412646

    • MOV MODS 11R NRR REPLACE OR MODIFY ACTUATORS AS REQUIRED DUE TO GL 89 10 PROGRAM i

97 418808

  • RCP SEAL INSPECTION (4 CARTRIDGE KITS) 11R MRC INSPECT / REPLACE SEALS ON RCP INCLUDING CARTRIDGE SEALS AND #1 SEALS 98 123ABD REACTOR REFUELING 12R MRC LOAD FUEL ASSEMBLIES FOR 600 EFPD 99 123ABC RB PRESERVATION 12R MRC PRESERVATION OF THE RB IN VARIOUS AREAS.

100 123LLL

  • 0THER OUTAGE RELATED ACTIVITIES 12R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.

~.

_-...., _. -. ~.. _... - -..... _ - - -. - - - - ~ -..

.. ~. -

. ~.

1 PR0 JECT L 1ST I NG TM 1 LEGEND NRC 1 NTEGRATED SCHEDULE

+

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 101 412536 DIGITAL INST & CONT MOD 12R ISM 12R (PHASE lil) COMPLETES REPLACEMENT OF NNI HARDWARE WITH THE FOXBORO DIGITAL HARDWARE 102 418813 INCORE DETECTOR REPLACEMENT (40) 12R MRC REPLACE 40 INCORE DETECTORS THAT ARE PROJECTED TO HAVE REACHED THE END OF USEFUL LIFE.

103 412536 DIGITAL INST & CONT HOD 13R ISM 13R (PHASE IV) WILL REPLACE THE EXISTING ICS WITH THE NEW ACS HARDWARE. 13R IS EARLIEST THIS PHASE WOULD BE INSTALLED.

104 128114 EPRI STEAM GENERATOR RELIABILITY PROGRAM 88-94 MRC CO-FUNDING FOR EPRI SGRP TASK 404 105 123262 RELIABILITY CENTERED MAINTENANCE PROG 89-94 MRC RCN EVALUATION OF PLANT SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT IMPROVE RELIABILITY.

106 128151 CAVITY DOSIMETRY ANALYSIS 91-93 NRR SHIP IRRADI ATED CAVITY DOSlMETRY REMOVED IN 9R AND ANALYZE 107 126223 TMl APPENDIX Vill QUALIFICATION 91 97 NRR SUBSCRIPTION FEE FOR PROGRAMS DEVEL BY EPRI & OTHERS FOR CONTRACTOR QUAL &

CERT OF UT NDE INSPECTORS PER APP Vill

.. _., _ -.. _.. - -. -. - ~ - -

TM i

.1 PR0 JECT LISTING s

LEGEND N R. C 1 NTCGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 CDS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 108 128170 GUIDELINES FOR ABNORMAL TRANSIENT PROC 92-93 10E DEVELOP PLANT SPEC GUIDE (PSG) FOR THI-1 ATP PROVIDING TECH BASES FOR ATP'S TO BE USED IN TRAINING, EVAL PROC CHANGES,ETC.

109 128166 COMPONENT DATA BASE EXPANSION 92-94 10E ENHANCE THE EXISTING ENG DATA BASE WITH SUBCOMPONENTS TO MEET THE NEEDS OF PLANT MAINT & OPERATIONS ORGANIZATIONS.

110 128174 REPLACEMENT OF OZONE DEPLETING CHEMICALS 92-94 MRC RECHARGE EQUIPMENT THAT !S COMPATIBLE WITH REPLACEMENT CHEMICALS DUE TO PHASE OUT OF OZONE DEPLETING CHEMICALS 111 412645 CFC ELIMINATION 92-94 MRC MODIFY / REPLACE EQUIPMENT TO BE COMPATIBLE WITH REPLACEMENT CHEMICALS AS REQUIRE 0.

112 412643 FLOOD PANELS 92-95 ISH DEVELOP PLAN TO RESOLVE THE OUTSTANDING PRA ISSUE REGARDING FLOODING. ALSO IM-PLEMENT MODS DEEMED APPROPRIATE.

113 128163 DRAWlNG ENHANCEMENTS TMI 92-98 MRC

1. ENHANCE THE LEGIBILITY OF APPR 500 DWGS. 2. REDRAW FLOW DI AG. IN CAD FORMAT
3. REDRAW GEN ARRANG IN CAD FORMAT 114 412592 1992 CONFIGURATION MANAGEMENT - DBR 92-98 10E DESIGN BASIS RECONSTITUTION 1992 w

--.e, e s er-,,

-e.--eer~,-*-,we ee-

=ta v--'~'7--

W vt +-

t+F'-

-P e

a vh r----**=

w w---e-%,

m.

e

--n-

+ae-rv+-.e6

--g

,,+-

~

ee,e--.

TM i. 1 PROJECT LIST ING LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATECORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 115 128160 B&W OWNER'S GROUP PROGRAM - 1992/93 92/93 NRR PARTICIPATION IN B&W OWNERS GROUP PROGRAM 116 419232 SIMULATOR ENHANCEMENTS. TMI (1992) 92/93 REL UPGRADE THE PLANT. REFERENCED SIMULATOR IN ORDER TO IMPROVE ITS RELIABILITY AND SCOPE OF SIMULATION CAPABILITIES.

117 412634 TMI.1 RCP MOTOR STANDBY STATOR AND ROTOR 92/94 MRC SPECIFY AND PROCURE A SPARE STATOR AND ROTOR SUITABLE FOR ANY RCP MOTOR.

NO PROCUREMENT FUNDING. ENGINEERING ONLY.

118 412631 PRESSURIZER HEATER BUNDLE REPLACEMENT 92/95 MRC DEVELOP A PROCUREMENT SPEC TO DESCRIBE THE ELEC AND MECH REQUIREMENTS FOR A NEW BUNDLE. PURCHASE IN '94/'95.

119 126109 BWOG GLRA PROGRAM 93 MRC PARTICIPATE IN AND PROVIDE SUPPORT FOR THE BWOG GENERIC LICENSE RENEWAL APPLICATION (CLRA) PROGRAM 120 126238

    • EVAL OF TMt ALERT & NOTIFICATION SYSTEM 93 NRR EVALUATE SYSTEM SIRENS USING LATEST DEMOGRAPHIC & TOPOGRAPHIC INFO TO INSURE STILL MEETING FEMA REQMNTS 121 412AHE CAVITY SEAL PLATE INSTALLATION 93 95 GWC TO SPECIFY, PROCURE AND INSTALL'A PERM' SEAL PLATE TO. REPLACE THE CURRENT REMOV.

ABLE DEVICE. COST / BENEFIT ANAL INCLUDED

., _, ~, _ _ _, _ _ _..,...,.. -... _.. _ _.

.,.. _,, _. _, -......... _ _.., _ _.. _. _ _.. _. ~, _ _ _ _

THI-1 PROJ LISTING

.....__............'E C T LEGEND NRC I NTEGRATED SCHEDULE

  • - NEW PROJECTS
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT DY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 122 412618 ACCIDENT MANAGEMENT GUIDELINES (AMG) 93-95 NRR USING IPE OUTPUT,.DEVEL AMG FOR USE BY EMERG RESPONSE PERSONNEL TO COPE WITH CORE DAMAGE EVENTS j

123' 412624 CORE MONITORING SYSTEM UPGRADE 93-97 ISM INSTALL NEW FIXED MARGIN TS SFTWARE THAT WHEN USED WITH EXISTING NAS WILL PROVIDE ADDED OPERATING SAFETY MARGIN 124 128173 CAVITY DOSIMETRY ANALYSIS 93/94 NRR REPLACE A & D CAPSULE HOLDERS WITH NEW DOSIMETRY DURING 10R, TRANSPORT, ANALYSIS AND REPORT OF RESULTS OF TESTING

' 125 122031 DEMOBILIZATION SOUTH OF THE DIKE 94 GWC DISPOSITION OF EQUIPMENT, MATERIAL, BUILDINGS AND FACILITIES IN TMl-2 126 12694C MAINTENANCE TRAlNING ANALYSIS 94 NRR DEVELOP TASK ANALYSIS FOR l&C, ELECTRICAL AND MECHANICAL INPO ACCREDITED PROG 127. 412619 CPU /lPU UPGRADE FOR PLANT PROCESS COMPUT 94 IDE UPGRADE PLANT PROCESS COMPUTERS CPU AND IPU BOARDS (18) WITH A SINGLE BOARD.

128 41994G

  • SIMULATOR ENHANCEMENTS - TMl-(1994) 94 REL UPGRADE THE PLANT-REFERENCED SIMULATOR IN ORDER TO IMPROVE ITS RELIABILITY AND' SCOPE OF SIMULATION CAPABILITIES.

-.m m-.--__---e~%4u-=~...wv,-.-+.

.*wa,cmr.w-,-ww-

.-~w--.wv-

-w- + < -

rv..4

.v4 e,.e--,,.,,,,vv-ww -,

.e~e.,

v,y,y

,.ww.,..,v.,.

,-,.%,.~%w, 7,w.,,y

TMi.1 PR0 JECT LIST ING L

LEGEND NRC l NTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03MAY93 DOS BA' DESCRIPTION CYCLE /

CL ASS I F I CAT I ON NUMBER YEARS 129 128175

    • ASSMNT & UPGRD OF UNDRGRND TANKS / PIPING 94 96 ERR I. ASSESS APPLIC TANK / PIPE SYS.

it.INIT TEST & MONITORING.

til-UPGRADE AS REQD.

(RFr 40 CFR 112) 130- 120ADX B&W OWNER'S GROUP 1994/1997-94-98 NRR PARTICIPATION IN B&W OWNERS GROUP PROGRAM 131 126101 PLANT LIFE ASSURANCE / EXTENSION 94/95 REL SUPPORT OF STUDIES BY GPUN & BWOG FOR FEASIBILITY OF EXTENDING OPERATING LIFE.

132 412AEG FUEL UT EOUIPMENT FOR REACTOR BLDG 94/95 REL DEVELOP, DESIGN AND PROCURE UT TESTING EQUIPMENT TO INSPECT-FUEL ASSYS FOR DEF.

ECTIVE FUEL RODS IN THE REACTOR BUILDING 133 412AHJ RCS RESISTANCE TEMPERATURE DETECTORS 94/95 MRC REPLACE EXISTING ROSEMONT RTDS WITH QUAL WEED RTDS ' AND MODIFY WELLS TO ELIM LEAK.

AGE.

134 128ADW REACTOR CAVITY DOSlMRTRY.'11R 95/96 NRR SHIP IRRADIATED CAVITY DOSIMETRY REMOVED IN 11R AND ANALYZE.

135 419960 SIMULATOR ENHANCEMENTS 96 REL UPGRADE THE PLANT REFERENCED SIMULATOR TO IMPROVE RELIABILITY AND SCOPE OF SIM.

ULATOR CAPABILITIES

... _.___ ____,_.. _- _ __ _ _ _... _..._ _ _.- - -. ~

_-..-.-~.~.-._J.--.--,_--_-.,--..-,__---_.-__._,.____-__.__--

. =...

m

= _ _.

__ _.. m t

6 TM i-1 P R O J E C T' LISTING LECEND.

NRC INTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS i

SORT BY CATECORY/ CYCLE /BA STATUS AS OF 03MAY93 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS t

136.128ADV 1996 CONFIG MGMT SSFl 96/98 ISM r

PERFORM ONE SAFETY SYSTEM FUNCTIONAL INSPECTION. PREPARE DRAFT DESIGN BASIS DOCUMENT IF REQUIRED.

1 4

l t

I t

i 1

I

'MS-D'Wk%WWW

'"%*MT PWMN N WN P'M'f 9P't 9e'WWW W 49'9 4W W-P W P e TT'M ERN WDP'*"='""'W'"rSTfP"9'*W@1W1WW-W-m1TSLTN'SM t P4 81EIDW4 % %*e>T W W 4*"W'T+hSvkrTTP'rM5-t+-T DP YRT tMt T mW

'W Dr'4W V Spr W W N"WT'W***WM1P' 977 Pd4'T"R--"S'

1 t

ABC Classifications i

a)

Meet NRC Recuirements (NRR) - Activities that a) must be carried out

[

to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would f

result in an NRC non-compliance even though the specific activity is not required by the NRC.

i b)

Meet Environmental Recuirements (ERR) - Activities that a) are i

specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c)

Meet Other Recuirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or t

other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

l d)

Increase Safety Marains (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required i

for regulatory compliance nor required by safety regulations, codes or guidance.

e)

Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental l

regulations, codes or guidance.

f)

Imorove Radiolooical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological i

regulations, codes or guidance.

g)

Maintain Reliability / Capability (MRC) - Activities that, if I

implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment.

Includes activities in response to national codes and standards, insurance i

policies, equipment vendor specifications or nuclear industry high l

unavailability equipment data without which the plant could not i

operate prudently.

l h)

Improve Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.

i f

i 311932053.LET f

i I

l e

l ABC Classifications l

(continued) i)

Imorove Operational Effectiveness (10E) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.

j)

Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.

k)

Provide Continaency/ Blanket (CUI) - Activities that, if implemented, j

will provide management flexibility to respond in a timely manner to l

emergent work requirements or the ongoing requirements to procure, l

replace or repair minor items essential to support routine I

operations.

1)

Imoroves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.

1 I

I l

311932053.LET l-l'

ATTACHMENT B CHANGES TO THI-l NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUAL UPDATE (MAY 4, 1993)

CATEGORY A PROJECTS Additions:

None Completions:

None

[

t Deletions:

None Schedule Changes:

None j

?

k i

i i

f I

I I

=l f

~

ATTACHMENT B (continued)

CATEGORY B PROJECTS i

Additions:

As denoted by

  • next to the project title in Attachment A.

l Completions:

419233 Simulator Modifications - 1992 Deletions:

None Schedule Changes:

None Other Changes:

None t

i P

I i

I f

l i

I t

I i

i j

ATTACHMENT B (continued)

CATEGORY C PROJECTS i

Additions:

As denoted by

  • next to the project title in Attachment A.

Completions:

126220 Evaluation of Warehouse Stock 126237 Operator Training Analysis 128161 1992 Configuration Management-SSFI 225011 THI-2 PDMS Alarm Monitoring by TMI-1 412076 Poison Fuel Racks - Pool A 412591 1991 Configuration Management-DBR i

412620 Radwaste Storage Capability 418755 RCP Cartridge Test Equipment 418771 Loose Parts / Neutron Noise System Upgrade r

418794 Plant Preservation - B0P 418797 Roofing Repairs 1992 419689 Roof Replacements 419700 Improve N0B Outside Area 419723 Security Equipment Deletions:

None BA Number Changes:

OBS Previous BA Number New BA i

57 419723 Security Equipment 419735 78 412AGU Radwaste Storage 412648 Capability Phase 2 82 419723 Security Equipment 419735 96 412AHB MOV Mods 412646 120 12693A Eval of TMI Alert &

126238 Notification System 129-412AHK Assessment Upgrade of 128175 Underground Tanks / Piping i

6 9

l l

l

.