Forwards Sanitized IE Insp Rept 50-247/82-28 on 821201-830103 & Notice of Violation
ML20028F159
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/18/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Otoole J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20028F160 List:
References
NUDOCS 8301310195
Download: ML20028F159 (3)


See also: IR 05000247/1982028

Text

,

_

-

_

~

.. .

_ _ _ _

"'

.

..

.

JAN 1 E 1983

"*" n"C'D ORIGI!iAll

Certttled By

RA

f

- v

Docket tio. 50-247

Consolidated Edison Company of New York, Inc.

ATTil: Mr. John D. O'Toole

Vice President

Nuclear Engineering and Quality

Assurance

4 Irving Place

flew York, New York 10003

Gentlemen:

Subject:

Inspection 50-247/82-28

Thu refers to the routine inspection conducted by Messrs. T. Foley and

P. Koltay of this office on December 1,1982 - January 3,1983 at Indian

Point fluclear Generating Station, Unit 2. Buchanan, New York of activities

authorized by llRC License No. DPR-26, and to the discussions of our find-

ings held by Mr. T. Foley with Mr. C. Jackson and members of his staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the report enclosed

with this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with per-

sonnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct one viola-

l

tion brought to your attention in the enclosure to our letter dated

October 4, 1979. We have no further questions regarding your action at

this time.

Based on the results of this inspection, it appears that one of your activi-

ties was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

This violation

has been categorized by severity level in accordance with the IRC Enforcement

policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987)datedMarch9,1982. You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

_ __

~ ~ l

y

!

/f

cu

-

-

8301310195 830118

"

-~~.~,i

y

PDR ADOCK 05000247

O

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,

,

-.

s

-

.

JAN 1 e 1983

consolidated Edison Company of

2

New York, Inc.

Sections of the enclosed inspection report contain details of your security

program that have been detemined to be exempt from public disclosure in

accordance with either 10 CFR 73.21 (Safeguards Information) or 10 CFR 9.5(a)(4)(commercialorfinancialinformation.) Therefore, the sections so

identified in the inspection report and Appendix A will not be placed in the

tiRC Public Document Room and will aceive limited distribution. The in-

spection report cover sheet and any remaining portions of the inspection

report will be placed in the Public Document Room, in accordance with 10 CFR 2.790(a), unless you notify,(by telephone, the Supervisor, Files, Mail and

Records, USiiRC Region I, at 215)337-5223, within 10 days of the date of this

letter and submit written application to withhold information contained in the

report within thirty days of the date of this letter. Such application must

be consistont with the requirements of 10 CFR 2.790(b)(1).

The responses directed by this letter and the accompanying Notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 19S0, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Qn<A

~

Richard W. Starostecki, Director

Division of Project and Resident

Programs

Enclosums:

1.

Appendix A, Notice of Violation *

l

2.

NRC Region I Inspection Report

50-247/82-28*

  • Contains Safeguards Information

l

l --

l

'

cyrtcin

rY

'

l

, . _

--

- .

-

-

-.- -

- - . . . - . .-

_

-_ ____ _ _-

.-.

_ _

_ .

_ _ _ _

-

-

.

.

.

,

l

Consolidated Edison Company of

3

JAN 181983

New York Inc.

-

l

cc w/o Appendix A and Pages 17 & 18 of Enclosure 2:*

C. W. Jackson, Vice President. Nuclear Power (w/cy of encis)*

M. Blatt, Acting Director, Regulatory Affairs

W. D. Hamlin, Assistant to Resident Manager (PASNY)

F. Matra, Resident Cor.struction Manager

Robert L. Spring, Nuclear Licensing Engineer

Director, Power Division

Thomas J. Farrelly, Esquire

Brent L. Drandenburg Assistant General Counsel

P. Polk, Project Manager

PublicDocumentRoom(PDR)

LocalPublicDocumentRoom(LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/cy of encis)*

State of New York

  • Contains Safeguards Infomation

.

.9fR,P,,,,,,,, ,,,,,, ,py,,, (f,f,, ,,DPRP[d.f.

h DERP.....{h}

IlB

o,,,c . ,

. . . . . .

. . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . .

amnend. .

. ..

.%.u1.t .x........ ..b,3., ......

....v4o......... . .9.gr.a.. .

..r.9.1.v............ .. 5.i.s.ts.r........ .....................#...x..........................

.e _ a,

..

. . . . . . . . . . . . . . . . . . . . . .

.. . . . z . .a q . .. . . . ... . .. ... . . ... .. .

j

ocm ,

. . . . . . . . . . . . . . . . . . . . . . . .

ac ronu sia oo-aoi nacu cao

OFFICIAL RECORD COPY

/