ML20027B023

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 70-1113/82-14 on 820801-11. No Noncompliance Noted
ML20027B023
Person / Time
Site: 07001113
Issue date: 08/25/1982
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Long J
GENERAL ELECTRIC CO.
Shared Package
ML19289B134 List:
References
NUDOCS 8209160272
Download: ML20027B023 (2)


Text

^

8NYr$Qpp"

/e_lto y I

e AUG 25 Nd General Electric Company ATTN:

Mr. J. A. Long, General Manager Wilmington Manufacturing Department P. O. Box 780 Wilmington, NC 28402 Gentlemen:

Subject:

Report No. 70-1113/82-14 This refers to the routine safeguards inspection conducted by Mr. E. L. Clay of this office on August 1-11, 1982, of activities authorized by NRC License No. SNM-1097 at the General Electric Company facility and to the discussions of our findings held with Mr. J. S. Bergman at the conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material," and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosed report with the exception of the cover page, which is an inspection summary, will not be placed in the Public Document Room.

o Upon completion of our analyses of samples selected from your inventory, we will write you again with respect to our findings and conclusions.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

/

/ Y

/[.' F. Gibson, Chief Technical Inspection Branch Division of Engineering and Technical Programs

Enclosures:

See Page 2 825

At "ANWlMED aEHmlH khO 1

^ * * ' "

IbO3 C

i

I WERIAL TdAN5MITTED HEREwity CotGAlt43 2J90 INr00MAllCN General Electric Company 2

Enclosures:

1.

Inspection Report No. 70-1113/82-14 (Exempt from Disclosure) 2.

Inspection Summary (NotExempt) cc w/ encl:

C. M. Vaughan, Manager Licensing and Nuclear Materials Management Unit bcc w/ Inspection Summary:

State of North Carolina bec w/ encl:

Document Management Branch bec w/o encl:

License Fee Management Branch bec w/ encl:

Chief, Safeguards Branch, DSRSI Chief, MC&A Licensing Section, NMSS I

1 4

RII RII RII RII GVN ff JWSa6 ados:es

,GtTr p ne AF son i

8/>#82 8/2r 82 8/2 82 8/>Jf82 I

I t

MATERIAL TRANSMITTED HEREWITH cONTAINS 2J90 INFORMATION

. -