-___
s 6
OC7 Commonwealth Edison 1400 Opus Place o
Downers Grove, Illinois 60515 May 31,1991 Dr. Thomas E. Murley, Director Office Of Nucioar Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk
Subject:
Braldwood Station Unit 1 Reactor Containment Guilding Integrated Leak Rate Test NRO Docket No 50 450
Reference:
(a) August 19,1980 letter from 1.M. Johnson to H.R. Denton
Dear Dr. Murley:
Reference (a) provided the technical report of the Braldwood Unit 1 3reoperational reactor containment building integrated leak rate test conducted aetween May 21 and May 29,1986. Enclosed is the technical report of the Braidwood Unit 1 reactor containment building integrated leak rate test conducted between February 2 and March 5,1991. This is being submitted pursuant to the requirements of 10 CFR 50, Appendix J.Section V.
The enclosed report describes the type A containment leakage rate test h
conducted in accordance with the requirements of Appendix J and throu0 the oorformance of 18wVG 6.1.2.a 1," Unit 1 Primary Containment Type A Integrated eakage Rate Test (ILRT)".
Please direct any questions you may have regarding this matter to this office, Very truly yours, M
L Allen R. Checca Nuclear Licensing Administrator :
Reactor Containment Building Integrated Leak Rate Test for Braldwood Unit 1 cc: R.M. Pulsifer Project Manager, NRR S. Dupont-Senior Resident inspector BW W. Shafer-Branch Chief, Rlll
[jff 9106070104 gion PR Anoa: osoooa; s I