ML20023D963

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/83-06 on 830328-0501.No Noncompliance Noted
ML20023D963
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/23/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20023D964 List:
References
NUDOCS 8306060205
Download: ML20023D963 (2)


See also: IR 05000423/1983006

Text

_

_

  1. %

NAy 2 31983

t

.

Docket Ho, 50-423

Northeast Nuclear Energy Company

ATTH: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

.

Gentlemen:

Subject:

Inspection No. 50-423/83-06

This refers to the routine safety inspection conductad by J. Grant and

T. Rebelowski of this office on March 28 - May 1,1983, at the Millstone Nuclear

Power Station, Unit 3. Waterford, Connecticut, of activities authorized by

HRC License No. CPPR-113 and to the discussions of our findings held by

T. Rebelowski with Mr. Sullivan and other members of your staff at the conclu-

sion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and repre-

sentative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold infomation contained therein within 30 days of the

date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10-day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Orisinal signea sy:

[. A N # * v ~

Richard W. Starostecki, Director

8306060205 930523

Division of Project and Resident

PDR ADOCK 05000423

Programs

G

PDR

gg

i

Enclosure: NRC Region I-Inspection-Report-# umber-50-423/83-06~--

-

.}j $.

,

I

.j.

.j. ,

.l.

>l.

"'

. ....

..

...

,,

SURNaut>,

l

l

cm y

i Nac Fon sis (10-80) NRCM 0240'

~

~

'

-

,

..

..

Northeast Nuclear Energy Company

2

MAY 2 31983

cc w/ enc 1:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. O. Nordquist, Manager of Quality Assurance

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

-

Huclear Safety Infonnation Center (NSIC)

NRC Resident Inspector

State of Connecticut

i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

Section Chief DPRP

,

31.;..DPRPgf,RI;. DP.RP.

.RI;.

.

h

.l.

omcr

..

suaumk Rebelowski

Elsasser

Gree man

l

i

.l

h)...

l.

.

.e

""

!

.

. ...

NRC FORM 318 (10-80) NRCM 0240

OFFICIAL RECORD COPY