Text
_
_
- %
NAy 2 31983
t
.
Docket Ho, 50-423
Northeast Nuclear Energy Company
ATTH: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
.
Gentlemen:
Subject:
Inspection No. 50-423/83-06
This refers to the routine safety inspection conductad by J. Grant and
T. Rebelowski of this office on March 28 - May 1,1983, at the Millstone Nuclear
Power Station, Unit 3. Waterford, Connecticut, of activities authorized by
HRC License No. CPPR-113 and to the discussions of our findings held by
T. Rebelowski with Mr. Sullivan and other members of your staff at the conclu-
sion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and repre-
sentative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold infomation contained therein within 30 days of the
date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10-day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Orisinal signea sy:
[. A N # * v ~
Richard W. Starostecki, Director
8306060205 930523
Division of Project and Resident
PDR ADOCK 05000423
Programs
G
gg
i
Enclosure: NRC Region I-Inspection-Report-# umber-50-423/83-06~--
-
.}j $.
,
I
.j.
.j. ,
.l.
>l.
"'
. ....
..
...
,,
SURNaut>,
l
l
cm y
i Nac Fon sis (10-80) NRCM 0240'
~
~
'
-
,
..
..
Northeast Nuclear Energy Company
2
MAY 2 31983
cc w/ enc 1:
K. W. Gray, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager of Quality Assurance
PublicDocumentRoom(PDR)
Local Public Document Room (LPDR)
-
Huclear Safety Infonnation Center (NSIC)
NRC Resident Inspector
State of Connecticut
i
bec w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
Section Chief DPRP
,