r T.S.6.9.1.6 PHILADELPHIA ELECTRIC COMPANY 3901020600 LIMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A. PENNSYLV ANI A 19464 (218) 3371200. EXT. 3000 0.0. ;i.,
- March 9, 1990 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 c.
l I
U.+sa NuclearrRegulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 l'
Enclosed are the monthly operating reports for Limerick Units i
1 and 2 for the month of February, 1990 forwarded pursuant to Technical Spacification 6.9.1.6.
I l
Very truly
- ours, W
KWM/kk Enclosure cc:
William T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector
/
\\
g&. 3200115 90022eADUCN 05000352 b5
\\
13
\\
3901020600 i
Docket No. 50-352 Attachment to Monthly Operating Report for February 1990 Limerick Generating Station Unit 1 February 1 through February 28, 1990 I.
Narrative Summary of Operatina Erneriences Limerick Unit 1 began the month of February at a nominal 100%
of rated thermal power.
On February 6,
reactor power was reduced to 90% to accommodate Main Turbine Control Valve testing.
On February 16, reactor power was reduced briefly to 75% to support a control rod pattern adjustment.
On i
February 18, reactor power was reduced to 73% to support isolation of the
'6B' feedwater heater for corrective I
maintenance on the bleeder trip valve.
On February 22, reactor power was reduced briefly to 90% due to high turbine backpressure.
On February 23, reactor power was reduced briefly to 90% to return the '6B' feedwater heater to service and to support a control rod pattern adjustment.
Limerick Unit 1 ended the month of February at a nominal 100% of rated i
thermal power.
Operational events that occurred during the month of February included:
On February 28, HV-050-1F005, RCIC Vacuum Tank Condensate Drain to Radwaste, was found closed with the handswitch I
in the open position.
Investigation revealed that the normally energized solenoid was deenergized.
The solenoid was found to have burned out.
HV-050-1F005 was then blocked open under Supervisory Permit.
On' March 1, HV-049-1F025, Drain Pot Inboard valve failed closed. A burned out solenoid on the valve actuator was found and t
RCIC was declared inoperable.
An air jumper was installed per TCA to maintain HV-049-1F025 open.
On March 2,
HV-409-1F026, RCIC Drain Pot Outboard valve, failed closed.
A burned out solenoid was again the cause.
It was determined that the solenoids had failed due to
'AC' solenoids being installed on the valves l
instead of the 'DC' solenoids.
These solenoids had been L
replaced to meet EQ program maintenance during the Unit 1 RCIC outage on February 19 through 22.
The solenoids have subsequently been replaced.
l II.
Challences to Main Steam Safety Relief Valy_gg i
1 There were no challenges to the Main Steam Relief Valves I
during the month of February.
l l
e s e.
O O
Y O
N O
o-e O
.%n
.J 1 >
1.
Nt ma 1
2 I Ot wi 7
5 i W
. A O M
.A i
w I
h I
l E
U1 e
OI W
i e
w e.
3 O
M Mt O^
M Z l
&F e-m M
h e
E O
W1 W
D 4D N
E E
& 1
>3 e
N M
O &
M M
M M
M X
.J t C O O O Di O O O O O.-
H u
OEw em
. W AO>
W' w us e
e e
e e
e F
.J -
Mwd 4) 3-W
>ME Oi Oa O
EMW D1.
W w
4 W>Z N'
I @ '
m I 6nW e-O I @
e-T 3OO 4
4 6
EM b
a N
W
.J 3 MW N
W to ui ID W
SOMU M J
M M.
O' HUM I
e W
F I ' 4
- &WE
- t e
u8 U
.J l 707W mi
&O&
W 3
a w
i
- I
.J O
M i e
I
- WgM N4 b
O e+
N M
9 b
ILi w 6 e
e e
e N
N N
N N
N-N N
N th J ii &
7 E CL.J N
O W
W D
m e
Z 2
W e
3 O H
H W
W M
E U
.J
.J E
W W
'P W
W
.J
.J m
N 4
W D
ROm kl
&F 0
ma M
e-M m m N
b e
O O
N O
4 Oi
>Z M
M M
N M
N N
M N
M M
M M
M (D
E
@ I,
.h 8 O O O O O O O O O O O O O O O us on wW e
e e
e e
e-e e
e-e e
e e
e D)
(
e a
4 w
W a
O G t 34 4
tr I E
Bl G '
W>
ik 4
Ie e
N M
g c
b cp O
e N
M 9
e g
q e
e e
e e
e e-f
y 3901020600 1
OPE':r. TING DAT1 REPORT 6
DOCRET NO. 50 - 352 DATE WARCH 8.
1990 cow?LETED By PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISIOg LIVERICK GENERATI % STATION TELEPHONE (215) 327-1200 EXTENSION 3752 OPERATING STATUS 1
UNIT MAME: LIWERICK UNIT 1 i NOTES: THERE WERE Two LOAD l
]
l
- 2. REPORTING PERIOD:
FEBRUARY. 1990 1
REDUCTIONS GREATER THAN i
g
- 3. LICENSED THERMAL POWER (wwT):
3293 l
20% THIS WONTH.
l j
4 NAWEPLATE RATING (GROSS #wE):
1139 l
g
- 5. DESIGN ELECTRICAL RATING (NET mwE):
1055 l
I l
l
- 6. WAXIMUW CEPENDABLE CAPACITY (GROSS MwE): 1092 l
l i
7 WAXIMUM DEPENDABLE CAPACITY (NET WWE):
1055 l
I 8.
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUWBER 3 THROUGH 7) SINCE LAST REPORT. GivE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET wwE):
- 10. REASONS FOR REST'1ICTIONS. IF ANY:
THIS MONTH va-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1.416 35.736
- 12. NUWBER O' HOURS REACTOR wAs CRITICAL 672.0 1.416.0 28.544.8 1?. DEACToo ogsgovE S$*rTDOww WUns 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 672.0 1.416.0 28.087.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (wwH) 2.193.694 4.604.336 82.467.776
-= ---
- 17. GROSS ELECTRICAL ENERGY GENERATED (wwH) 710.830 1.493.640 20.680.210
- 18. NET ELECTRICAL ENERGY GENERATED (wwH) 686.679 1.442.558 25.498.954 PAGE 1 OF 2
3901020600 OPET. TING DATO i;EPORT (CONTINUED)
DOCMET NO. SC - 352 a
b
... =
DATE MARCH 8.
1990 THIS WONTH VR-TO-DATE COMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 100.0 78.6
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 78.6
- 21. UNIT f,APACITY FACTOR-(USING MDC NET) 96.9 96.6 67.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.9 96.6 67.6
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 2.8 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTup:
- 26. UNITS IN TEST STATUS (PRIOR TO COmwERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY WID APRIL BS 4/13/85 COMwERCIAL OPERATION 1ST OTR 86 2/01/86 PAGE 2 OF 2
390f020600 UNIT SHUTDOWNS CND POWE4 # EDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE MARCH 8 1990 REPORT MONTH FEBRUARV. 1990 C0ePLETED BY PHILADELPHIA ELECTRIC COWPANY J.J. FURPHV REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3T52
-__----------~~. ---...------------------
l METHOD OF LICENSEE ISYSTEM COMPONENTl CAUSE AND CORRECTIVE I
. TYPE DURATION REASON SHUTTING DOWN EVENT l CODE CODE l ACTION TO NO.I DATE (1)H (HOURS)l (2)
REACTOR (3) l REPORT a !
(4)
(5) 1 PREVENT RECURRENCE 1
l l
[
l I
4
' 900206 5
000.0 B
4 l
N/A ZZ j ZZZZZZ l LOAD WAS REDUCED 10% TO ACCOMODATE l
l l MAIN TURBINE CONTROL VALVE TESTING.
I I
I 5
900216 i S 000.0 F
4 N/A I ZZ
' ZZZZZZ l LOAD WAS REDUCED 25% TO ACComODATE A l
l CONTROL ROD PATTERN ADJUSTNENT.
1 i
i O I C00218 5
000.0 B
4 N/A I ZZ ZZZZZZ l LOAD WAS REDUCED 27% TO ACComODATE l
l ISOLATION OF A FEEDWATER HEATER FOR l
l 1
WAINTENANCE.
I I
l 7 l 400227 5
000.0 F
4 N/A ZZ l ZZZZZZ LOAD WAS REDUCED 10% DUE TO HIGH TURBINE L
BACMPRESSURE.
I I
O 1 900223 5
000.0 F
4 N/A ZZ ZZZZZZ LOAD WAS REDUCED 10% TO RETURN A 1
l l
FEEDWATER HEATER TO SERVICE AND i
I O
CONTROL ROD PATTERN ADJUSTWENTS.
g l
l l
1 1
l (1)
(2)
(3)
(4) r rORCED REASON WETHOD ENHIBIT G - INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE L__
3901020600 i
Docket No. 50-353
)
Attachment to Monthly Operating Report for February 1990 Limerick Generating Station Unit 2 February 1 through February 28, 1990 I
I.
Narrative Summary of Operatina Erneriences Limerick Unit 2 began the month of February at a nominal 100%
of rated thermal power.
On February 22, reactor power was reduced briefly to 90% to accommodate Main Turbine Control j
Valve testing.
Limerick Unit 2 ended the month of February at a nominal 100% or rated thermal power.
1 II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of February, l
l
(
l L
L l
~..
3901020600 f.VEZAGE DAILY UNIT POWER LEVEL DOCKET NO..SO - 353
-UNIT LINERICK UNIT 2 DATE mAqCH 8.
1990 COMPANY PHILADELPHIA ELECTRIC CDppANY j
J. J. NURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATIMG STAT *ON TELEPHONE (215) 327-1200 EXTENSION 3752
- 0 NTH FEBRUARY 1990 DAY AVERAGE DAILV POWER LEVEL DAY AVERAGE DAILV POWER LEVEL (WWE-NET)
(wwE-NET) 1 1072 17 1072 2
1070 18 1071 3
1075 19 1071 4
1069 20 1073 5
1077 21 1074 6
1075 22 1061 7
1068 23 1064 8
1072 24 1072 9
1070 25 1073 10 1070 26 1073 11 1072 27 1072 12 1073 28 1070 13 1070 14 1072 15 1072 16 1070
~
3901020600 OPET. TING DATA REPORT DOCKET NO. 50 - 353 DATE MARCH 8. 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 2 i NOTES: THERE WERE NO LOAD 1
1 I
- 2. REPORTING PERIOD:
FEBRUARV. 1990 REDUCTIONS OF 20% OR I
l
- 3. LICENSED THERMAL POWER (Mwr):
O l
GREATER THIS MONTH.
l l
1 4 NAMEPLATE RATING (GROSS MwE):
1138 l
l g
- 5. DESIGN ELECTRICAL RATING (NET MwE):
1055 l
l 1
I
- 6. MAXIMUM DEPENDA9LE CAPACITY (GROSS MwE): -
l I
I I
7 MAXIMUM DEPENDABLE CAPACITV (NET MWE):
l l
B.
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUwSER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO MHICH RESTRICTED. IF ANY (NET WWE):
- 10. REASONS FOR RESTRI CTI ONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1.248 y
g
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1.248.0 1.248.0
- 13. REACTOR RESERVE SHUTDOWN HOUDS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 672.0 1.248.0 1 248 0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MwH) 2.211.1h2 4.103.22h 4.103.229
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 7k6$57b 1.386.220 1.386$220
- 18. NET ELECTRICAL ENERGY GENERATFD (MwH) 719,792 1.337.125 1.337.125 PAGE 1 OF 2
3901020600 OPERATING DATA REPORT (CONTINJC)
DOCKET MO. 50 - 353 DATE WARCH 8 1990 THIS MONTH VR-TO-DATE CUwULATIVE
- 19. JNIT SERVICE FACTOR 100.0 100.0 10 M
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0
- 21. UNIT CAPACITY FACTOR (USING #DC NET) 101.5 101.6 101.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.5 101.6 1g1,6
- 23. UNIT FORCED OUTAGE RAYE O.0 0.0 0.0 24 SHUTDOWNS SCHEDULED OVER NEXT 6 WONTHS (TYPE. DATE. AND DURATION OF EACH)e
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALIrv 8/12/89--
8/12/89 INITIAL ELECTRICITY JLO_1R L JM&9 C0m=ERCIAL OPERATION 2/01/90 1/08/90
- NOT APPLICABLE PRIOR TO C0mwERCIAL OPERATION PAGE 2 0F 2 N
3901020600
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCRET NO. 50 - 353 l
UNIT NAWE LIMERICK UNIT 2 f
DATE MARCH 8 1990 t
l REPORT MONTH FE8RUARY. 1990 COMPLETED BV PHILADELPHIA ELECTRIC COMPANY L
J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIWERICR GENERATING STATION TELEPHONE
- 5) 327-1200 ERTENSION 3752 l
I I #ETHOD OF l LICENSEE SYSTEWICOMPONENTI CAUSE AND CORRECTIVE ITYPElDURATION REASONISHUTTING DOWN1 EVENT CODE I CODE l ACTION TO NO.
DATE I (1)l (HOURS)1 (2) l REACTOR (3) l REPORT a ll (4) l (5) l PREVENT RECURRENCE I
I I
I I
I I
I I
I I
I I
I I
3 900222 S
000.0 8
4 l
N/A I
ZZ' ZZZZZZ l LOAD WAS REDUCED 10% TO ACC0400 ATE I
l l MAIN TURBINE CONTROL VALVE TESTING.
I i
1 1
I i -
1 I
I (t)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCT 70MS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - WAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAw.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAWE SOURCE m
i L.
3901020600 Docket No. 50-353 Attachment to Monthly f))
Operating Report for
(
February 1990 Limerick Generating Station Unit 2 February 1 through February 28, 1990 I.
Narrative Summary of Ooeratina Exoeriences Limerick Unit 2 began the month of February at a nominal 100%
of rated thermal power.
On February 22, reactor power was reduced briefly to 90% to accommodate Main Turbine Control Valve testing.
Limerick Unit 2 ended the month of February i
at a nominal 100% or rated thermal power.
1 II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of February.
l 'd i-l 1
L l
O l
---e 73p-y o
i
, ~.
(_'_
3$020600 b
AVEOfGE DAILV UNIT P0wEM LEVEL e
DOCKET NO. 50 - 353 UNIT LINERICK UNIT 2 l
l DATE MARCH 8, 1990 COMPANY PHILADELPHIA ELECTRIC COWPANY l
J.
J. wuRPHY REPORTS SUPERVISOR PROJECTS DIVISION LINERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 MONTH FEBRUARY 1990 DAY AVERAGE DAILY power LEVEL DAY AVERAGE DAILV POWER LEVEL (MwE-NET)
(WWE-NET) 1 1072 17 1072 2
1070 18 1071 3
1075 19 1071 4
1069 20 1073 5
1077 21 1074 6
1075 22 1061 7
1068 23 1064 4
8 1072 24 1072 9
1070 25 1073 10 1070 26 1073 11 1072 27 1072 12 1073 29 1070 13 1070 14 1072 15 1072 16 1070
m a
(D U
3901020600 L
%/
OPERTING DATA REPORT 9
DOCKET NO. 50 - 353 DATE MARCH 8, 1990 COMPLETED BV PHILADELPHIA ELECTRIC COMPANY 9
J. J. MURPHY REPORTS SUPERVISOR l
PROJEC15 O! VISION l
LIMERICK GENERATING STATION TELEPHONE (213) 327-1200 EXTENSION 3752 OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 2 l NOTES: THERE wERE NO LOAD l
j
- 2. REPORTING PERIOD:
FEBRUARY. 1990 REDUCTIONS OF 20% OR
- 3. LICENSED THERMAL POWER (MwT):
O I
GREATER THIS MONTH.
l l
4 NAMEPLATE RATING (GROSS MwE):
1138 I
- 5. DESIGN ELECTRICAL RATING (HET WWE):
1055 I
I
- 6. MAXIMUM DEPCNDABLE CAPACITY (GROSS WWE): -
l t
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MwE):
I 8.
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1.245 y
g
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1.248.0 1.248.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 00 14 HOURS GENERATOR ON-LINE 672.0 1.248.0 1.248.0 t
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MwH)
---=--
2.211.182 4.103.229 4.103.229
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 746.470 1.386.220 1.386.220
- 18. NET ELECTRICAL ENERGY GENERATED (MwH)
T19.792 1.337.125 1.337.125 PAGE 1 OF 2
n)
-(~T 3901020600 I_,
~
Q, OPE 3 TING DATA LEPORT-(CONTINUED).,)
N.
v' DOCKET NO. 50 - 353 e
DATE WARCH 8 1990 THIS MONTH VR-TO-DATE CUwULATIVE
- 19. UNIT SERVICE FACTOR 100.0 100.0 1_0_ _0_._0
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 g
- 21. UNIT CAPACITY FACTOR (USING WDC NET) 101.5 101.6 101.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.5 101.6 101.6
- 23. UNIT FORCED OUTAGE AATE O.0 0.0 0.0
_=
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH);
i
- 25. IF SHUTDOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (P;IOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/gg gg INITIAL ELECTRICITY
_N0lML
_MM_9 COMMERCIAL OPERATION
__2_/_01/90
__1_/08 / 9_0
=-
- NOT APPLICABLE PRIOR TO COuwERCIAL OPERATION PAGE 2 OF 2
,y e
r-
~
-,w,
,7-.-
i -- *,*
.,,e,,
,o,.,,
a
.zm 3901020600
- ~
k
/
l UNIT SHUTDOWNS CND PowE3 E. EDUCTION 3 DOCMET NO. 50 - 353 UNIT NAME LI#ERICE UNIT 2 DATE WARCH 8.
1990 REPORT #0 NTH FEBRUARY. 1990 CO#PLETED BV PHILADELPHIA ELECTRIC COWPANY l
J. J. WURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIWERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752
=
l l
l l WETHOD OF l LICENSEE iSYSTEWICOw?ONENTl CAUSE AND CORRECTIVE l
lTYPElDURATIONlREASONISHUTTING DOWNI EVENT l CODE I CODE l ACTION TO NO.1 DATE l (1)I (HOURS)l (2) l REACTOR (3) i REPORT a I (4) l (5) i PREVENT RECURRENCE 1
I i
3 I
I I'
I I
I '
I I
I i
l l
3 l 900222 1 S i 000.0 B
4 N/A ZZ l ZZZZZZ LOAD wAS REDUCED 10% TO ACCOMODATE l
I l
l l
MAIN TURBINE CONTROL VALVE TESTING.
1 I
i ----- l I
I i
1 -
1 I
l I
(1)
(2)
'(3)
(4)
F - FORCED REASON WETHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - WAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOwATIC SCRAW.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - A DMINI ST R ATI VE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EMHIBIT I - SAWE SOURCE