Text
o
.
.
'
-
.
.
JUL 2 81981
Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senier Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject: Report Nos. k324/81hnd 50-325/81-14
This refers to the routir.e safety inspcction conducted by Mr. D. F. Johnson of
this office on June 15 - July 15, 1981, of activities authorized by NRC Operating
License Nos. DPR-62 and DPR-71 for the Brunswick facility. Our preliminary
findings were discussed with Mr. C. R. Dietz, Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requiraments are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) sumit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
Consistent with
office promptly)so that a new due date may be established.section 2.790(b (1), such
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheid from public
disclosure. This section further requires the statement to address wit"
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
,
8109240276 810903=
gDRADOCK05000g
1
l
JUL 2 81981
.-
2
..
.
specified oeriods noted above, the report will be placea in tLe Public. Document
Room.
Should y>u have any questions concerning thic letter , we will be glad to discuss
them with you.
Sincerely,
M
R. C. l.ewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/81-14
and 50-325/81-14
cc w/ encl:
C. R. Dietz, Plant iknager
i
bcc w/ encl:
bec w/ encl:
Document Management Branch
State of North Carolina
1
,
RII
RII
RII
R
D
sonYdt
CJ
an
her
is
j
7/2 81
7/gg/81
7/29/81
7{
81
!
,