l
t
' -j -
- p*"%g
OFFICIAL COPY
-
c
UNITED STATES
+!"',
NUCLEAR REGULATORY COMMISSION
Y
"g
g
- -
.c
REGION 11
- [
o
101 MARIETTA ST., N.W.. SUITE 3100
,
g
ATLANTA, G EORGIA 30303
~
Jun 0 41981
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
I
Gentlemen:
Subject: Report Nos. 50-518/81-08, 50-519/81-08, 50-520/81-08 & 50-521/81-08
This refers to the routine inspection conducted by Mr. J. R. Harris of this
)
office on May 12-15, 1981, of activities authorized by NRC Construction Permit
Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville facility. Our
preliminary findings were discussed with Mr. R. T. Hathcote, Project Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these arcas, the inspection consisted of
selective examinatior.s of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necesst.ry that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter . written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with speci ficity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far
as possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
8108040630
0
PDR ADOCK 0
G
-.
-
. - . -_
. , ~
.
- -
. - .
9
e'
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
,ff.t:.
R
C.
sis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-518/81-08,
50-519/81-08, 50-520/81-08 and 50-521/81-08
cc w/ encl:
H. J. Green, Division Director
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief