Text
w KANSAS GAS AND ELECTRIC COMPANY t** E LE CT 5+C CCACANY GLENN L M O E 5 T of 8t V.C E Pe t OC E N T m
.6 s aar June 12, 1981 Mr. G.L. Madsen, Chief Reactor Projects Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 KMLNRC 81-084 Re: NRC Docket No. STN 50-482/Rpt. 81-06
Dear Mr. Madsen:
This letter is written in response to your letter of May 27, 1981, which transmitted Inspection Report STN 50-482/81-06. As requested, the violat.on is being addressed in three parts:
a) Corrective steps which have been taken and the results achievad; b) Corrective steps wnich will be taken to avoid further items of noncompliance; and c) The date when full compliance will be achieved.
Finding An unauthorized piping hanger was fabricated from nonconforming materials to replace an approved safety-related piping hanger (BN 01 Coll 123) in the Borated Refueling Water Storage System which was inadvertently destroyed.
Response
a)
The steps that have been or will be taken are:
1.
Prior to the NRC's receipt of an allegation and their subsequent investigation, an involved Craftsman had reported the problem to Daniel International Corporation (DIC) management. The subject hanger was tagged on 810804021S 810706 PDR ADOCK 05000482 O
PDR 201 N. Market - Wichit.2, Kansas - Mail Adoress: PO. Box 208 i Wichita, Kansas 67201 - Telephone: Area Code (316) 6451
Mr. G.L. Madsen KMLNRC 81-084 June 12, 1981 j
l 1
April 6,1981, and removed to the Piping Superintendent's office. The nonconforming 1-..ger was documented on DR ISD 6526 M on April 6,1981.
The NRC duty officer received notice of allegations concerning safety-related piping hangers at Wolf Creek on April 7,1981.
2.
During DIC's investigation of the allegation, the Craftsman directed DIC Quality Control to other hangers he cons dered i
fabricated contrary to project procedures..The t~
pers involved were non safety-related, but we e? app [ sir ly, fabricated from safety-related material. -
3.
The welder who fabricated the hanger, and used another welder's identification symbol on the hanger, was placed on three (3) days suspension as a disciplinary action.
He was reinstructed on the necessity of refusing to obey directions contrary to procedures, and on the reporting of di rections of this type to DIC Management.
4.
The Foreman who directed the Craftsman to fabricate the hanger was terminated.
5.
Meetings were held with DIC piping supervision to reiterate the importance of quality, compliance with procedures, and that failure to comply with quality and procedure requirements would result in termination of emplo,Inent.
6.
A reinspection of safety-related hangers installed or possibly installed by the responsible Foreman was conducted by Quality Control. Any further deficiences found will be documented and resolved.
[
b)
Corrective steps which will be taken to avoid further items I
of noncompliance are as follows:
1.
Future purchases of stock steel will be purchased as safety-related material only.
2.
Remaining nor. safety-related hanger material will be removed from the Wolf Creek site.
3.
Non safety-related stock cteel under DIC Civil control, which could be used to fabricate hangers, will either be declared surplus and removed from the site or segregated.
4.
As a result of the recent reorganization, the scope of the piping Superintendent has been reduced. Superintendents
Mr. G.L. Madsen KMLNFO 81-084 June 12, 1981 were responsible for Pipe, Hanger and Radiographic Tested Pipe installation. Under the new organization the Radiographic Tested Pipe instalJ stion has been placed under one Superintendent.
Nor. Padiographic Tested Pipe and Hangers vera placed ander another Superintendent. This will provide for more effective control of hanger installation.
c)
Full compliance of the above corrective steps will be achieved by August 3, 1981.
Please feel free to contact us if you have any questio.s concerning this response.
Yours very truly, I fif GLK:bb cc: TVandel, Resident NRC Inspector
a i
i I:2 TIIE WsTTER OF
)
KANSAS GAS A!1D ELECTRIC COMPANY
)
Docket No. 50-482 WOLF CPEFK GENERATI!1G STATION UNIT tio. 1) t I
j AFFIDAVIT l
i I, Glenn L. Koester, of lawful age, being duly sworn, hereby depose and state that I am vice President - Nuclear of Kansas Gas and Electric Company, that I am duly authorized to sign and file with the fluelear Regulatory Commission the attached response to the Notice of Violation identified in NRC Inspection Report No. 81-06 ; that I am familiar with i
the contents thereof; and that the matters set forth therein are true and correct to the best of my knowledge, information and belief.
KANSAS GAS AND ELECTRIC COMPANY 3y
/4!!
As/
~Glenn L. Koester Vice President - Nuclear i
<i l
STATE OF KANSAS
)
)
SS:
COUNTY OF SEDGWICK )
i i
BE IT REMEMBERED that on this 12th day of June, 1981 before me, Evelyn L. Fry a Notary, personally appeared Glenn L. Koester, Vice President - Nuclear of Kansas Gas and Electric Company, W1chita, Kansas, who is personally known to me and who executed the fore-
- ,,,,,,,,g instrument, and he duly acknowledged the execution of the same for behalf of and as the act and deed of said corporation.
+,
.!'/
iTN$SS WHEREOF, I have hereunto set my hand and affixed my seal this I
c.
- a and
\\ '."OB 0 !$! year above written.
/
- W*.
9i
, ara n
.,,,*j!!*j y (,% /
y-;
+
**" MY' Commission expires on August 15, 19 1.
F
._