ML20009G032

From kanterella
Jump to navigation Jump to search
Forwards LER 81-097/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G032


LER 81-097/03L-0:on 810612,in Mode 5,routine Surveillance Discovered That Quantity of Fire Detection Equipment Installed in Five Fire Zones Did Not Comply W/Tech Specs. Caused by Typographical Error & Incorrect Blueprints
ML20009G036
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/08/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G036 (1)
Forwards LER 81-097/03L-0.Detailed Event Analysis Encl
ML20009G031
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/08/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G031 (3)