ML20009F675

From kanterella
Jump to navigation Jump to search
RO 250-81-13:on 810710,during Equipment Hatch Alterations, Small Void Found in Concrete Immediately Below Hatch Barrel. Engineering Evaluation & Any Necessary Repairs Will Be Completed Prior to Restart
ML20009F675
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/13/1981
From: Hays J
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PTP-QC-81-119, RO-250-81-13, NUDOCS 8107310399
Download: ML20009F675 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

?.O.50x S29100 WsAMl.F& 33153 REGIONAL DIRECTOR l

D~PUTY DIRECTOR njqqc,yg;(

l ASS'STANT TO DIRECIOR DRECTOR, RRPI DIRECTO't EPOS DIECTOR, ENF/INV nomorronm a ucm ces:,mv D: RECTOR, ETl PTP-QC-81-119 PUBUC AFFA'RS OFFee Turkey Point Plant July 13,1981 10:

Mr. J. P. O'Reilly, Dimctor, Region 11 Office of Inspection and Enforcement G'i Rr / 7h U. S. Nuclear Regulatory Casuission Atlanta, Georgia 30303 4

FROM:

Mr. J. X. Hays, Plant Manager - helear

/S

~

~

Turkey Point Plant - DPR 31 and 41 f

JULjt419815 $

Florida Power and Light Company

\\ n,,,, m a ua w u n gsa C

Miami, Florida 7

4/

SUBJECT:

EMD FOR FACSIMILE TRANSMISSIOR TO CONFIRM w

REPORTABLE OCCURRENCE 250-81-13 This memo confirms our telephone notification of the subject prcept notification reportable occurrence made Friday, July 10, 1981, to your Duty Officer, Mr. I. Y111alva as follows:.

OCCURENCE Eh Friday, July 10, 1981, a relatively small void discovered in the concrete issediately below the equipment hatch barrel was determined to be reportable in accordance with technical speciffcation 6.9.2.a.(9).

This void was found in the' course of makirg scoe alterations at the equipment hatch to facilitate c handling equipment and large components during the steam generator repair effort.

CORRECTIVE ACTION - Unit 3 Is presently defueled and undergoing

_ inservice inspection of the reactc vessel. Prior to restarting the unit an engineering evaluation D.urrently in progress) and any

necessary repairs will be comple'.e;.

A plan for inspection of the same area on Unit 4 is pendiag compiation of the engineering

- evaluatior,.

</;tGu[$

e, n.

J. F. Hey Plant Ma r - Muclear JKH:ca l

[h 8107310399 810713 I

PDR ADOCK 05000250 S

PDR ma m mn