Text
~
a, lJUL 2 0 M Docket No. 50-203 Mr. A. Victor fiorisi Boston Edison Company ft/C Muclear 800 Boylston Street Boston, Massachusetts 02199
Dear Mr. Morisi:
Subject:
Infomation Request Regarding Station Blackout, Unresolved Safety Issue A-44, Pilgrim Huclear Power Station Unit No.1 The NRC staff is currently addressing Unresolved Safety Issue (USI)
A-44 Station Blackout. The purpose of this work is to establish the safety significance of an event resulting in a loss of all alternating current power and, if significant, to consider the need for any specific changes. Over the nast several years infomation requests have been forwarded which requested information that is being used in the USI analysis. Your interest and cooperation in the past have been appreciated.
At this time the USI A-44 effort is being directed toward detemining the reliability of the onsite standby diesel generators. The enclosed questionnaire has been prepared to provide accurate operating experience to serve as a basis for such a detemination. More specifically, its purpose is to obtain more detailed data than were available in previous diesel generator studies such as AEC-00E-ES-002, NUREG/CR-0660, and NUREG/CR-1352 The questionnaire (enclosure 1) requests infomation in tabular form and solicits data for the years 1976 through 1980, inclusive. There are four tables enclosed:
(1) Diesel Generator Operations Data, (2) Diesel Generator S:heduled Down Time Record, (3) Diesel Generator Unscheduled Down Time Record, and (4) Onsite Ewergency Diesel Generator and Auxiliary Equipment Modification Record. Also enclosed are examples of completed tables as well as a clarification of what should be entered. Please note that, although it may appear that only Licensee Event Report (LER) infomation is sought, data on all diesel generator malfunctions, independent of whether an LER was prepared, is requested.
i Please find enclosed LER documentation (enclosure 2) presently docketed for your facility. You are requested to review these and to indicate if there are other reports which have not been enclosed. Finally, please find enclosed a copy of the appropriate portions of your response (enclosure
/
8107310134 810720 PDR ADOCK 05000293 F
PDR OFHCE)
SURNoMEh oarE y OFFICIAL RECORD COPY USGPO: 1981-335-900 NRC FORM 318 @80) NRCM cao
~
Mr. A. Victor !brisi 3) to our letter of March 6,1978 which requested related, but different, infomation. This is being forwar/ed for your infomation only and should afi in preparing Tables 1 through 4.
In consideration of the time and effort necessary to obtain this information, the completion of Table 4 should be considered voluntary. However, it should be noted that 'f operational and hardware modifications are not identified, the positive or negative influence of these features on emergency alternating current power reliability may be lost in the evaluation of the data. The expected effect is that our generic reliability estimates may be lower than that which actually exists.
The above information is requested in accordance with Sections 103.b.(3) and 161.c of the Atomic Energy Act of 1954, as amended. To meet our schedule requirenents for the resolution of USI A-44 and to incorporate as much real experience as possible into the reliability model for energency power systems, it is requested that your response be provided within 120 days of the receipt of this letter. However, if this schedule is inconsistent with priority requirements for other licensing work, please provide us with your pr7 posed date of response within 30 days.
We plan to complete our analysis of this data by February 1982. Your data should be provided by that time so that an accurate assessment of onsite alternating current power sources can be made.
Mr. P. Caranowsky has been designated Task Manager for USI A-44.
Should you have any questions, please feel free to contact him at (301) 443-5921. Your time and efforts are appreciated.
DISTRIBUTION Docket File 50-293 M. Williams Sincerely, NRC & Local PDRs S. Norris TERA J. Heltemes GIB Reading J. Roe
-ME mo g ORB #2 Reading GELD D. Eisenhut I&E (3)
Thomas A. Ippolito, Chief R. Purple ACRS (16)
Operating Reactors Branch f2 T. Novak T. Murley Division of Licensing T. Ippolito F. Schroeder
Enclosures:
K. Kniel As Stated P. Norian x
P. Baranowsky cc: w/ enclosures J. Butts See next page This request for information was aporoved by the Office of Management and Budget under clearance number 3150-0CG7 which expires May 31, 1983.
Comnents on burden and duplication may be directed to the Office of Management and Budget, Washington, D. C.
20503.
N \\
DS.GIB 1/ DST:0RB#2 0-3 DL-B#2
-_ a...&......
omen
. 9. s,...
_o
..e4. g...un.u.b..eenk......
..g$ pl...
... s...
...u2
.D.UNihl.....
.07/q/81..
. 07/<.'J/81.
ocro OFFIClAL RECORD COPY use m mi-m +o NRC FOR*A 316 (104]) NACM C240
l Mr. A. Victor Morisi l
Boston Edison Company r
cc:
1 Mr. Richard D. Machon Pilgrim Station Manager Boston Edison Company RFD #1, Rocky !!ill Road Plymouth, Massachusetts 02250 Henry Herrmann, Esquire Massachusetts Wildlife Federation 4
151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02350 Resident Inspector c/o V. S. NRC P. O. Box 867
~~~
Plymouth, Massachusetts 02360 O
l l
l i
1 l
1 up eg
)
. 1 e
t l
e a
e T
ga r
P*
wo s
s i
E.s t
e aI e.=
F ra.
d ul a f
m f
l s
f oi ot c
l nt na cai ot nl n it EPU t a aco i t f
O i r t e nf ee dI t
I(
nre uor RF u l
f pi ooa t F nS o
G ieD t r e
ool n
rf c aI t
ueo a
DI E l
D s
f n
o E g )i o
l i
t9 enK a1 ci(
r rd er eaG pa P o. D O e 1
Y r
r or r
e t a e
r
- n. d s f e
l a i
in iol ce u
l nl a
l f
z a F
CC l
e r
s u
e t
e s
i t f r n oa a
D ll u
t S
G o Di t de t
l s
u e
d T
a e
t li d
s d
i c n e
'g n
au T
ar E
G R
e
)
l D&
R mo l
s e ef l
,f D
up A
r o c oy T
on e
t eT l e f on p
n ioS an ay u
g nt i
l f t s n uat l i u r ale ct i ec
- a. er c
A rt ce icp u e
as sp OD T
Gt e i S l
DST l (
l 4
lll l'
?
2 e
ga P
i 1
e em r a.
s uNo t
s N
n t-ot e
l nc m
c ai m
nl n o
EPU C
fC 4
D dr oc n
e w C R
d 'u o
e t
m u
i h
f t
sC n
i l
w t
o o
D n
d e
r f
u9_
e m
o C
l i
t D
t c
d1 n
a e
w e
h r o
R f
ca D
U S e T
Y f
r o
r t a s
I ad r
U rn u
D ee lo nl I
aa CC nf wC l
d7 o
an t
e u-i
- h. J D
a g
g r
o tcar eU R
D rUD e
e l
c bid a ve l
r r 2
i ei a su E
va g
l b
nye e
u c s r
c n
o d n s ef f e ea i go m
l n r
ni ue G e e oL d t D ms s n e n e ue aw hi e
at eo c a mrcs RD SM i oee Tf b t I
~
l
\\l ll!
I:l!
I!
'o
9
,,~
1 er e 3
aelhb e
n a
g enT a
ei P
b an l i ep 4
vxd aee e
h t
em.
es r a t si uNo oal s
N ne I
ot l s l nt d pe cat l
r nl n u, u i
El U osl wnioa sif et rie udh l nt i o acr f
o y
d cs enR e E.
t rg1 or ped eme reh c
era h'e t td tna f u o
o d
et n
yr o
nur c
al e te i f f ae i
If R em i
t s
n t
u n
o e
D sua 4
d o
e C
l e 9_
u
/
d r
t e h1 ac c
pa ur el ia R p Us e e
Y t
r D, ye, l
or e
t a ad r n ay ee t r nl r e ea av GC s
l t
r l
u
- g e
o cn l
a i i l
c bt i
e uo D
m oo i
rh t
f a n '
wo l s D
ar t u ool Tl
)s 3
.l t
Hcc E.
E a bl t t r c at A
a s
T r ob t t A s
b rt l
A e E.
f I R e E. (R d I
e l
I l
ij!
il 1!)
l i
al:i:I<
i.
. i
6 e
e h
4 "J
C M
Q 1
=e ne W
4 4
U e
-e M.
4 e-
- O 7
L.
1 e c
22O E
a 2
ow M
=M Q
U 3 *e
-== =
C
- s :o m o
=
M
.Co b
U
't U
Q T C
= u 3 4
- f. 3 3 23
-e e
ar==-
'. a U 4 U
"3 3=
=
Qw 4
=e O T "3
O d
2
==
O e
e u nu s'e :
U =
0
- U hS w S u a
~n U
2=
"3 >
U 3 C C 54 ?
%w he h1 L
U
% S
==
- 2 p n
=
0 =*
2 U ww c ne me me Q ee nW Q. 3 0 :
3 "J
>4 EE Q w
0 *9 O C W Z e
Q 4
W 2
O
.b w U C
'. "3
=3 U 4
S :r==
LU=
ee U me 3 C9 7a g Chi aa
~
G
l.
i
- Page 5 i
TABLE ENTRIES
~
EXPLANATION / CLARIFICATION
{
Table 1 Reason for DG Operation and Scheduled Duration of Run: This column contains the different categories of diesel generator o,peration. The categories i
I are structured such that the start and run conditions are similar for all of the tests in a category. In this column, enter the scheduled run duration for each of the test ettegories. Also enter the number i
of diesel generator starts that are done for each type of test. For example, if on the monthly test there is one start frcm the local con-trols and one start from the remote controls, the number of starts per test is two.
If two or more diesels are started simultaneously i
for any reason, please record it as a multiple start.
I DG No.: Enter each diesel generator's identification number in this column I
as shown ir P.he example.
Number of Starts: Enter the sum of the successful and unsuccessful teart atte= pts for each category. If there are several starts for each test, include all of them, but be certain to record the number of starts per I
test in column one.
Number of Failures: Enter the sum of the failures _for each category. A 3
i failure is counted if the objectivec of the test are not achieved. A subsystem f ailure that does not cause failure of the diesel generator l
system is not counted as a failure. If the diesel generator did.not j
start, run, and load as required by the test, a failure should be i
recordad. However, if the diesel generator would have supplied power in some capacity for an emergency, please explain in Table 3.
For example, if the diesel started on the second attempt or the diesel was tripped to repair a minor oil leak that would not have been a problem in an emergency, this should be noted in Table 3.
Percent Loading of DG CKW): Enter the percentage that the diesel is loaded for each category. The continuous kilowatt rating is considered to be 100%.
Duration of Run 3efore Stop for each DG Failure: Record the run-time for each failure. If the diesel failed to start, the run-time would be 0. min.
Identification of Failures: Attached to this questionnaire are abstracts of the Leas related to the diesel generators. The abstracts are numbered starting v1th one. Refer to this number to identify the failures, but if there was a failure for which there is no abstract, assign the failure a number and include it in Table 3.
Table 2 Reason for Downtime: Enter in this column the categories of schedule main-tenance that make the. diesel generator unavailable for emergency service.
If the diesel generator is unavailable 'for emergency serv +.ce during surveillance testing, report that also.
G e g w
-r,_-_--
.--8
, _. _ ~ _ _
, - Page 6.
i 2
Table 2 (cont'd)
Hours of Downti:ne: Enter the number of hours that the diesel generator is unavailable for emergency service. Report the hours under the column reactor shutdown or reactor not shutdown as appropriate.
Co=nents: Comment on time to return to service after maintenance has begun, or other pertinent information.
Table 3 LER Abstract No. (Refer to attached LER Abstracts): The attached LERs are numbered starting from one. Refer to this LER number in column one. Each LER abstract should have an entry in this table.
If there was a failure not included in the attached abstracts, please assign it a number and enter it in this table.
Downtime Hours:
Inter che number of hours that the diesel generator is unavailable for estrgency service. Subdivide these total hours into troubleshooting, sarts delivery, and repair or replacement.
Cocments: Use this colun to comment on the devutime and the failure.
If the reported failur
- vas only a technical-s,,ecification violation, but would not be a ce plete failure of the diesel generater to' supply power or would only be a delay, please elaborate '. this colu=n.
Table 4 Equip =ent or procedurc =odified: List in this.colu=n the equipment or procedures related to the emargency onsite power system that have been codified since the reactor became critical.
Dai:e of Mod.:
Enter the date that the =cdification was completed.
Reason for Modification and Desired Improvemen::: Report the reason for the = edification and the desired or observed i=provement in the system.
Description of Modification: 3riefly describe what = edification was
=ade.
M 4
a Encloanre ! - I'cge 7 TAlli.E I Diezel Cenurator Operat ions Dxto Plcut Homo nxx (Sanple)
Calendxr Year 1976 Unic Ho.
1&2 e
~ Reason for DC tium.lse r Hun lie r Percent Duration of than Opesation, & sclieduled DG of of 1.nading of liefore Stop For Identification of Failures lluration of Itun lla.
Starta l'a l l u r e n.
l)G (KW)
Eacti DC Falliere (Re f e r t o a t r actied I.EN s o r Talil e 3)
Te cle. Spec Rey'd Test ilontlily Surveillanco 1
12 2
100 30 tain; O sain I.ER # 1 & 4 (l Inous) 2 12 0
100 (l start / test) 3 12 1
100 a min I.En #2 Itefueling Outago 1
1 0
100 1
0 100 (12 liours) 3 1
1 100 1 liour I.ER f 3 (1 start / test)
Mine. Tecle Spec 1
2 a
100 Talile 1 No. 9 Heq'd Teuta 2
4 0
100 (Staat Only) 3 2
0 100 (1 start / test)
DG Actual Dennand Starts not for Testing SIAS Signal 1
1 0
0 I.En,f 8 Multiple start of 3 DGs i
-h (l liour) 2 1
0 0
3 1
0 0
a H!ncell.incous Tests (Specify Type)
Verify Repairs 1
6 0
{
0 min Talite 3'i 10 (no t.
full test)
~2-4 0
0 (S tart Only) 3 4
0 0
t b
Enclosure ! - l' age 8 i
Tall' E 2 Plant Haec j'-
(Sample)
Diesel Cenerator Scheduled Downtime Record Unit No.
t Calendur Year 19_
l l
llours of Downtime
}
I Reason 'or Heactor shutdown Reactor not shutdown Gaments ljf D-}T]f 7f
~}l' ]I~
IMjf DGl DC#
Downtlam DC#
I ' Scheduled Haintenance 1
Preventive 24 16 16 Haintenance I
Semi-annual &
Annut.1 Equipment I Hodification 8
8 8
Hodified lube oil on eacle diesel. Diesels down at different times.
l l
l i
i l
I v
4 l
l 1
a I.
Tire DC is unavailable i
for emergency service i
because of required
{
testa l
I)own 4 hrs per test 8
48
- 0 48 Dieselcannotbeautoenatic:lkystarted during test or for three hours af teavards
Enclosure ! - Pagn 9 TAnl.E 3 Dicael Cenrrator Unncheduled Downtimo Record Plcnt flame XXX l
(Sample)
Calendar Year 19_
Unt't No.
1&2.,
N i
Commento - If any of the reported failures wouTd not have been a l
- 1. Ell Abst ract Ib Downtime Houra l
(ite(cr to at t e!
failure under emergency conditions, please explain here.
ed 1. Ell Abst ract a)TM houble-Parts, Del Repatr/
liefer to attached 1.ERs or tlie failures listed in Table 1.
!!aurs shooting tvery.etc tepince 1
4 1
1 2
2 3
0.5 1
1.5 3
12 1
10 1
j 4
.0 0
0 0
I)1enel started in 15 acc instead of required 10 sec i
5 0
0 0
0 Secondary air pressure icv. - Primary air satisfactory.
6 0
0 0
0 Secondary air pressure lo.a.
Primary air satisfactory.
7 0
0 0
0 1,lesel atarted in 20 see instead of required 10 sec.
8 0
'O 0
0 False DG start signal. DC satisfactqry No LEll 9
0 0
0 0
Required DG stai[ts af ter the fatture of one diesel.
10 0
0 0
0 Starts to verify repairs.
1 1
)
l 1
l I
1 l
t I
a
Enclosura 1 - Pago 10 TAllt.E 4 Onsite Eaaergency Disael Generatur end Plent Haar.e (Sample)
Auxiliary Equipacnt Hodification Record Unit No.
Equipsent or IDate of Reason for Modification and psocedure Hod.
Desired Improvenient Description of Hodification modifled I.ube oil system 2/76 Improve turlio charger lubrication Soak-lanck pomp was removed and replaced with a for emergency starts.
continuous lube oil pump.
New pump also continuously lubricates the crankshaft.
Ralay cabinets 1/78 Prevent dirt from fouling relay Cabinet doors with gasketa were installed.
contacts.
Instrument 6/79 Eliminate vibration damage to Cbntrol and monitoring instrument panel was Ralocation instrumenta relocated from the engine skids to a free standing panel mounted on the engine roon.
floor.
O g
- r 9
49/5/0000001-0000011//
1
. PAGE All
- CESSION N O'.
00Z01oG326~
1TLE COMPONENT COOLINb WATER FUMP AcOUNCANCY VIOLATED AT PILGRIM 1
- J4PAUTH dCSTON EDISON CD.
SATE 1980 TYPE O
DMO L1R w/LER 80-4S0 TO U.S.
NRC, REGION 1.
SEP 19, 1960. OCCAET
$6 -293.
T YP E--O w R,
MFG--GE. Ad CECh
-VAIL AVAILAblLITY - NRC PubLIC DOCUMENT ROOM, 1717 H S TRE E T.
G.
C.
2055b (Do CENTS /PAGE -- >INIAUM CHARGE S2 00) s cS TR ACT DATE GF EVENT - 091 18 C.
PU4CR LEVEL - 10G%.
CAUSE - AMC1GLOUS T ECHN IC AL SPEC IF I C A TICNS.
ON bEPTEMEER
- 10. A M AN AGEVEN T PCVIEW CCNCLUDED THAT A TECH SPEC VICLATION HAD OCCURRED O ts S E P T d P F:Ed 7.
SINCt All RNATE SHUlDOhN PANELS INSTALLED DUh1NG THE LAST REFUELING OU TA CE RE STR I C TED RENOTE CGNTROL OF TnE RECCa PuuP
~
l P202D THAT
'A' DIESLL GENcRATOR SHOULD NOT HAVd BEEN REMOVED FROM SERVICE.
ALSO CURING SALT SERVICE. VATER FUMP MAINTENANCE IN A U G U S.1 LE d6 THAN inE hCoulAED PUMPS uCRE AVAILAELE CURING l
THESd M A I N T E NA NC E A C T I V I T I E S.
THE SPARSL AND AFLIGUUuS l
LANGUAGE OF T d CH SPEC IS THE CAUSd IN THAT THE LCO OF TME SAFE SHUTOUWN P A N EL S IS NOT LLEARLY DEFINED.
CCRhECTIVE ACTION WILL BE PROPOdED:
1.
A DESIGN CHANGE TO PLANT EQUIPMENT. AND 2.
TECH SPEC REVI SION.
- UMPONENT CODE PUMPXX-PUMPS
..YSTEM CODE
'n6-COCL SYS FOR REAC AUX & CONT 49/5/0000001-000G011//
2
-CCESSION NO.
O CZ 01 cO C 76 "ITLE DIESCL GhN d R A T OR I N LPdR A lit t AT PILGRIM 1
- 3RPAUTH BOSTON EDISON CO.
i s4TE' 196C YPE Q
! EMO LTR W/LER 80 -O c2 TO U.S.
NRC. REGION 1.
OCT 3.
1980.
DOCKET 50-293. T Y D E --SW R. MF G --L C. Ad J E CH
-VAIL AVAILAh!LITY - NRC PubL1 L UCCut<hNT ROOM. 171) H STREET.
WAbhlNGTUN.
D.
C.
20SL5 (06 CEN}c79 AGE -- MINIMUM CHARGE 52.00) va STR ACT DATE LF _V:NT - 090 leg.
POWER LEVEL - 10C%.
CAUSE - SNAPPED FUEL Lin:.
FOLLOwING LTATION tukVEILLANCE 1ESTING. TnE A -O l E L L L vehtRATCR
- w. A d LtCLARFD INCPERA6Li.
THE FUEL LINE HAD SN AP F: b it i t tI VICINilY UF THE blESEL GhERATOR CYLINDE4 NUMSER 9R.
A Fia L C90SSOVfA
'l' TYo: CGr,NEC T OR, REALUhlNC 1"
O D..
1/2" 1. !,. t iV ER ED. ALLOLING D1: DEL FLEL TU EsECT F%CM THE FUEL LINE.
- e. aNTENANCE PERSGoNEL. REPL*CtD IN-KINL THd.DdFECTIVE CONNitTD.
.UMPONENT CODE P IP E X X ~e 1-EE,F I T T INGS
_r5 TEM CODE EE-LacAt GENLRATGA LYL L CONTRCLd
- v /S /0 000 0 01 -00 0 0011//
2 CCESSION NO.
00ZOISbo*o
, ~1TLE OlESEL GLtsE R A T D4 FAILS O TIMES DU R INC-24 nOUR LO-U 1EST aT P IL GR I M 1
.shPAUTH EOSTON EDISON CC.
. ATE 19eO YPE O
EMO LTR 4/ lea E O-017 TU U.S.
ARC. hiGION 1.
sun L.
14t0.
OGCKET 50-295. T Y P E --ua A. t:FG--vE. AE 2Eth
. VAIL AVAILABILITY - NRC PubLIC UCCUMdNT R O Ot4 1717 H STREcT.
4ALnlNCTON.
D.
C.
205bt (CE LEN15/Paud -- *INIMUV CHARGE
$2 00)
->STRACT D AT C 3F EVENT - UbObbv.
PubER LEVEL - OU6%.
CAUSE - LGS $ OF 24 nOUR PCAFORMANCd TESl OF FUEL LIL ANG 2xCITEh FAILUAE.
4
'A' DIESEL GiNERAlan RtGUtbTED bY 1.c.
SULLETIN NC.
79-23. WAS INITIAlEL ON M AY 3.
19eo.
Tnt FOLLQ41Nu THREE * *EUCCE SSFUL ATTEMPTS PRLCIDE's THE SUCCESLFUL MAY 9 TEST.
Os S/3/60 AT lEle THE
'A' 01CSEL GENERATOR TdIPPED DUE TO LOW FUEL OIL LEVEL.
THE DAY TANK F uh L TRANSFu. PurP BRExsER. 315.
.Ad GFF.
THIS uREAAER SFCU J H-VE UEEN AdTURNEu TO NORYAL FULLCw1Nu P4ETEST MAINTENANCL.
LN 5/a/c0 AT lo*G THd
'A' DIEEEL F NERA TOR 'S ShAFl CRtvLN. FUEL U1L P UN.P ndL1 DRC4E.
A utC 1 S u1N 4AS MADE TO TERPINATL Tbh IEST, FIA InC bdL1 AND RkhUN THL TELT.
A CIRECT CutkiNi S A Cn UP FUEL PUMP MAS AVAILAcLd MAO IT SEEN DCCIDEO TO CONTINUE THE TCST.
GN 5/6/6C AT 123e rnd
'A' DIELEL GENERATCR TRIPPED.
PR10h TU ThE id!P TuO LOUD NblSES E*! TIED FROM THE m
4
49/5/0000001-0000011//
3 CONTINUAI!ON 1
par.E 412 GCNERATOR E X L1 1E R COUICLE.
AFTEN THE 1 RIP A SMALL Flkt IN THc EXCITER cub l LL L hAS E A T I NGU I SHt D.
THL ENilRE EXCITEh HIGH VULTAGE CHAShl5 WAS REPLACED.
COMPONENT CODE E Nb !NC-ENG I N ES. I N TE hN AL CCMbUS110N
.;YSTEM CODE EC-EMERG GENER ATCR LYb & CUNTAGLS 49/5/0000001-0000011//
4 ACCESSION NO.
00ZOIS7071
!!TLE DIESEL GcNE R AIGR F I RE PkC T LCT 10N S Y S T Ei4 FAILS AT PILChlbe 1 CORPAUTH BOSTON EblbON CO.
JATE 1960 TYPE O
NEMO L TR W/LER o 0 -0 15 Tb U.S.
NRC. REGION 1.
MAY 1.
1460.
DOCAET 50-193. T Y P E --ow R. AF G --C-E. A c --d E CH AVAIL AVAILA51LITY - NRC PUBLI C DOCUMENT ROGA. 1717 H STREET.
WASHINCTON.
D.
C.
20555 (06 CENTS /PAGE MINIMUM CHARGE 52.00)
AsSTRACT D AT E OF LVENT - 0*01EG.
POWER LE V EL - G00%.
CAUSE - FAILEO HEAL SENbLR / AC TU A TO R.
DURING THE PERFuRAANCL Ot2 A SUkVEILLANCE TEST GF THE CH Y CHEMICAL F IRE PAOTECTIGN SYSTEM FOR THE
'A' DIESEL GkNERATCR. 11 WAS LETCRFINED THAT THE LYSTEM 4AS INOPdRALLE.
THE bYblEM FAILE0 TO AUTUNAllCALLY INillATE OLRING THE TEST.
A F IRE W AICH.AS IMME01ATELY ANITIATED.
A PYROThuNICL. (YPt D TF 190 HEAT ACTUAlEu DEVICL (HAO) nAL ERRATIC IN I IS GPERATION.
blNCE NO sTF 190 MAL *d WEdE AVAILASLE. TMd UNIT
=AS nE-INdlALLEU.
A CONS 1ANI. FIRE WATCH ttAS ScEN Pub 1E D IN lHe SENERATCR RCCV blNCd THE SYST:M MALFUNCTION A90 1HE WA TCH WILL CONilaUd UNTIL TnE LNIT IS HEPA! RED.
A RLGulbiTION WAS IMMiDIArdLY GdNCRATCO TO PLACHASE 2 -O T F 190 MAUSS AND THE ORDER liLEPHONdD INTO THE PYROTRONICS OFFICE.
PYROTRCNICS INDICATEL JELIVERY bY M*Y S.
COMPONENT CODE I NS1R U-I NST R UM EN T AT I ON A fsU CONTROLS SYSTEM CODE AL-F I R E PRO T CC TI ON SYS G CONT
- 9/5/0000001-4000011//
5
,.CCES S IO N NO.
00Z0153992 TITLE D1dbEL G c NE R AI DR DIFFERCNT1AL LLCKuuT IRIPL Al PILbkik 1
'CORPAUTH dOb TON ELISON CD.
DATE 1979 TYPE G
EMO Llk w/LER 79-049 TO U.b.
NHC. kCGION 1.
SEC 2d. 1979, OCC4ET 50-293. TYPE cwa.
W - cd. At--eECH C O N T R O L --o c. 7 :- l.1 AVAIL AVA ILAd lL il Y - r.R C PU6Lic D OLur :ENT RuGM. 1717 M SThECT.
WASHINGTON u.C.
20bbb. (C6 /PAbt -- MINIMLM Cr1 A R G d 12.00)
AoSTR ACT D AT C GF EVEN1 - 112479. PunER LdVcL - 100%. CAUSE - RCP A IR VARIOUS FLLL O IL Ld4NS.
ON f4 0 V E M O E R 09, 19's4 AFTER COMPLETItG ROUTINE LURVEILLANCt Tc511hG OF "A"
UliSEL GCdEAATOR. TNE AL7.
TalP NELAf A NN UNC I A T OR DID NG1 LLEAR.
INVibilGATION OF THE D IESEL G:NtR AT GR OU1PL1 BREAKER REVtALCC A DiFFENaNTIAL RELAY PHASE "A"
TARGtT
- Ab CROUPdD AND THE
- t. lF FERin T I AL LCONOUT TRIPPED.
THE DIEbEL GENLRATCH nAL DCCLARED INOFdRAELE AND REOUNDANT TESTING CONOUCICD.
PERSCNNdL INVISTIGATED POSSILLE CAUSES FOR T HI S EVCNT ANO w ER L UNAdLL Tu F 1;.0 A r.Y EtcCTRICAL FAULTS.
THE PHAbE "A"
TAhGET M.O LIF FEhE A11 AL LOLNCU T 'ec A t RESET AND OIESEL GENERATOR CPthAblLITY TEST PCE F LA M:D w lTH P. O RECURRENCE OF THE TRIP.
LOMPONENT CODE H E L A Y X-Rc LA Y S SYSTEM CODE E C-E M c R G GdNERATCR SY S & CONTRCLS 49/5/0000001-0C00011//
o ACCESSION NO.
00Z01432h9 T4ILE HEACTOR REC 1kC MOTOR GdN ER A TOR SET 1 RIP 5 x1 1LGW1h I CD4PAUTH BOSTON EDISON CO.,
DLYMCLin. MA OATE 1977 TYPE O
"EMO 3 PGS. LTR w /L ER 7 7 -1 1/3 L TO bRC OFFILE OF 1 5 i. EcGlJN 1.
A PR I L 26. 1977. 00CAET $0-292.
1YPE--twR. Af s - ut. Ai--5; C HI FL AVAIL AVAILABILITY - NR C PUbLIC QCCUhtNT RGUM, 1717 h SIREET, WASHINGlON.
U.
C.
20c55 (0e CtNTS/'Avi -- x1NlvbM CnARGd 52 0J)
.AHSTRACT DATE OF tvet! - 032777.
POwEh LEVEL - TM:.
CAUSE - EXC11Eh CADLES LOUSENED 3MUdH R1culNu.
DunING A PO4dn 1.* t k L A d d.
REACTOR REC IRC UL A T 10t. MO I CR -G ENd R T G AR SLT "A"
THE CCMMUTA10R SLUSMCS WERE nORN COublDE4 ABLY. 1FERc 4At LITTLE
==
4 4
em
-~
99/5/0000001-0000011//
6 CO N T I NU A T I ON 1
PAGE 413 SPR ING TENSIGN GN THE bkUSh k!bu!NG. ANU THE SRUSH RIGGING HAD ROTATED AND MADE CONTACT mlTH THE BLIP AINGS RESULTING IN A TRIP SIGNAL.
THE RINGd whRE STONED, CRUSHES RdPLAC30. THE S UR SH RIGGING WAS REAL1CNcD, AND THE UNIT WAS W E TURNED TO SERVICE.
ON M AR CH 25, 1977. F<EACTOR hECIRC. FOTOR uENCRATOR BET "A"
bRUSnE S AcR b ARCING AGAIN.
ThE EXCITER CASLES, WHICH ARE ATTACHED TO THE ERUSH RICblNG, wERE CRE ATING A ROT AT ING FCRCE ON THE ORUSH HIGGING CAUS IN G 11 TO LOGLEN.
.34PONENT CODE GENER A-GENER AT OR S
,YSTEM C OD E Cb-COOLANT REC IR C sYb L CONTROLS 49/5/0000001-0000011//
7 CCESSION NO.
0020141700
ITLE DICSEL GENERATOR OUTPUT bdEAAER TRIPS AT P I L Gk 1 >. 1 ORPAUTH GOSTON ED1 SON CO.,
PLYMOU1H. MA JATE 1976 TYPE O
.E MO 3 PGS, LTR w /L ER 78 -0 4 9 / R 3L-O TO NRC OFFICE OF 1 G E.
RtGICN 1,
NOV.
10, 19 7t, OCCKET S C -2 9 3, TYPE JWR.
MFG--GE, A E--S E C H T E L
, V A I L.
AVAILAb1LITY - Nnc PUoLI C DOCUMEN T ROOM. 1717 H S TR EE T.
WASHINGTON, D.
C.
2G55d (0c CENTS /PAGF -- MINIMW4 CHARGE 52 00)
A3STRACT D AT E CF EVENT - 101178.
POWER LEVEL - 0%.
CAUSE
-A SHORT FROM ONE CO1L 10 TME ST A TOR.
Wh1LE PERFORMING ROUTINE SLhVEILLANCE TES T ING ON C/G "E",
THE JENERATOR Ou rPUT GHEANER TRIPPED.AFTEm THE UNIT MAD BEEN OPERATING FCR l o HIr:UTES AT RATED LOAD.
GENEkATOA VOLTAGE WAS READING 2ERC.
THE D/G WAS SECURED. A REA CT OR E TAR T UP WAS IN PROGhdSS AT THE 11ME OF OCCURRENCE wlTh 2 CRD GRuuPS WITo7RAwN.
THE CRJeg ngpg pyLLy INSERTED AND THE md AC TGW PLACEO 2.' COLL SHUTDOWN FOR REGA1AS TO THE udNERATCR.
THIL CVENT OCCURn.D Ab A RESULT OF A bHORT FPOV ONE Cult TO IH E S1 A TOR CAUSED cY LOOSE LAMINATIONS.
ALL COILS w ER E REPLACED, ACCEPTANCE TEST CONDUC1ED SAT 1bFACTORILY AND THE UNIT RE TURNE s TO SERVICM ON OCTOSER 26, 197S.
- O4PONENT CODE GENER A-GENER A"OR S LYSTEM CODE EE-EVERG OcNiniTOR SYS L CONTRCLS==-
49/S/0000001-0000011//
e
-CCESSION NO.
COZv 1402 a c 1TLE DIEdEL 6
. h A T OR INLPERauLE AFTER TEST AT PILCRIM 1
.sRPAUTH SOSTON u.. % CO.,
PLYMOUTH, MA iTE 197e YPE O
iMO
- PGb. Li w/LER 7 e -0 3v / c 3 L -u FC NRC OFFICE OF t &C. REGION 1.
AUG. al.
1973. DOCNci 50-493.
TYPE--ceR.
NFG--Gu, A E --b E CH T E L NRC PUuLit DULUPENT ROUM. 1711 h STRdET.
VAIL AValLArt 1TY WAbblNLlbN, b.
C.
2CSub (OC CENTS /PAGE -- MINIMUM Ch49G5
$2.00) 2STRACT OATE OF OviNi - OdUc71 POWER LEVEL - l O C i!.
CAUSE - FAILU%E TG FJLLOw PRLCEDbkES.
AFIER C CF P LE l i NG lHE (NL hCU4 RUN GN 6 i
DIESEL CcNLRATOR FOR SURv21LLANCE E.9.1.
THE D-u dECAME l
INUPERAELc a H2 N OlOUd5 FAILED IN cOTH THE AUTO ANJ r*ANUAL i
ClhCUITS CF TH E VOLlAGE h : G U L A I cts PR Ir4TdD C1kCUIT CARG.
THE CAULE wAL F A IL um b TO FOLLLw Pk;CdCURL IN THA1, lhE kdACTOR OPEkATOR PUT THC C/G TLST SwllCH SACN TU NOR!~AL bEFORE OPENING THE OUTPUT OkEAKih CAublNG AUX. TkANS. bhEANEh TO A-6 SUS TO OPEN. AND auR I NG RCCOVcRY ATTuvPTS, HE CLOSdb aux. TRANSFURSER l
oREAAER 1C Ao GUT CF SYNLHRLN12tTICN.
i.,VPONENT CODE INbl9 0-INS T R U-TEN T AT IGN AND CGNTROLS j.v5 TEM COGE dC-EMERG GENaiATUh bYS L CONTROLS l
l
-v /S /0 0 00 0 01 -CO O GO l l //
9
! LCESSION NO.
00ZC120279
' TITLE SLAC4 b MOr.E C3 f4E S F R OM 01ESdL v1NcRATCR iXHAUST MANIFOLD Al PILGRIM 1 24PAUTH SObTON ELISON CU.,
FLYMOuTH, MA ATE 1976 l YPE Q
! C40 3 PGS. LIR w /L ed 75 -31/ 2 L TG PAC OFFICE OF 1 G t.
RECION 1.
TY'c--561.
MFG--G.i.,
AE Jd C:sT EL DEC.
1.
197e. LOCsci 50-192, a
JAIL AVAILABILITY - NkC PubLIC DOccNtNT RGUM. 17t? h STkEET, MINIMUN. CHARGO WALhlNGTUN, J.
C.
EUSac (ce CENTb/PAuE S2.GO)
.5 TRACT CAU$d - FILL:I acLD FAILURE.
Duk1NG T db T ING WITH Thd mEACTOR 9
9
~
f *9/5 /0 000 0G.1 -0 0 0 0011//
9 COf T INb ATION 1
PAGE 414 AT 60% PQwER. SLACK SMOKE 4AS OdSEhVdD LfANING EnCM GlEbEL GENERA 1Cn U LXhAUST MAN!"GLD.
A SI.NGLE FILLLT aELO ON THE
.iELLG*$ CGNr.ECTION I NT ERN A L SUEFACE CF THE FLANC: TO EXPANSIGP AT THc ENGINE END F.t I LE D A L L C,- I N G EXHAudT GtbES TO ENTER ThE OG ROGM.
Tnd E AP AN b lO N CELLO 4b.CNNdCTOR WAS.cPLACED IN <1ND.
49/6/0000001-4u00011//
1G CCESSION NO.
0020119316 ITLE S t/C A d LCAAS FRCN LIESEL 6ctERnTCR EAMAULT MaNIFCLJ AT PILGh!M 1
..uRPAUTH UOb10N CD150N CO.,
PLYt:OUTH.
t'A
. ATE 1976
- YPE u
4 DMO 3 PGS, L th h/LER 70 -2 b / 3 L 10 f.nc GFFICL OF i C L,
- L C I C t.
1.
OCI. E1, 1970. DGCAET tc-292. T Y P E --ti e n. ' v5G --G. c., AE JdCHTEL
% VAIL AVAILAmlLilY - NRC PUcLIC DOLUVENT R O O t4.
1717 N S1AEET, MININUh CHARGE WASHINGTGN, D.
C.
20646 (Ob LENTb/PAGE d2 00)
'cSTRACT CAubt - FILLLT dCLO FAILUME.
GLR l f.G IEL11NG.v11H ThE RCACTCR AT 75% POwEk. BLACK bNCKt WAS ODSCkVEL LEAN 1hG FACM C125EL GENERATOR A LX hA U S T MANIFOLD.
AN EXPANSION FELLua5 CONNECTOR GN THE LUNG FA NIFCLO PIPE HAD 5EPARATED OUE 10 FAILURE CF A SINGLE FILLcT WbLD GN THt INTERNAL SUR FmCE OF 1hE.FLANuE TO dELLOWS CONNECTION.
THE ScLLUwS CONNcCTOR WAS hEPLACED IN KIND.
The hcLG FILLER MATERIAL nAS CHANGEO AND IMC FLANGE PREHEAT h tGU IR EM ENT WAS kODIFIED.
49/5/0000G01-0000011//
11
-CCESSION NO.
0 0Z O 1 10 9L4 STAR 1 IN 10 SECCNDb AT PILCRIM TITLE D IE SdL G:PCRATOR FAILb TO
.URPAUTH 60STON ED ISON CO.,
PLYMOUTH. hA
.ATc 1976 YPE O
'EMO 3 PGS, LTR h /R O 3G-?b-31 TO NRC CFFICE OF 1 &
E.
REGION 1.
FES.
2, 197o, DOCnE T S0-h93. TYPE Lhn, t iF G --G. f., AL--6ECHT1L VAIL AVAILA61LITY - NRC PUcLIC DGCvMENT ROJt*, 1717 m STAEET, WA5hlNGTON.
D.
C.
2054b (Oo CcN NTPAGE - A'!.1kUM CMARGC 12 00)
TURBO AS$1ST VALv0S MALFUNCriUN.
OvalNG TESTINC alrH
'2STRACT Cuubi THE REACTOR AT ELL POWER. DIEbEL GENEaATCR o 51 ant TIME vA1 11 SECGNDS, EAC-EulNG ThE 10 SECUND L It'I T.
THE ;UAe3 ASSIST VuuVES WERE NOT FUN CT 10N itJG CG9w=CTLY.
1MdY AERE CLEANED AND*
RETURNED 10 idRVICC.
SLANTING 114E AAd inEN CLLCNED Ab 7.. E 5ECONDS.
4 i
1 I
e we G
G em
....