Forwards IE Insp Repts 50-413/81-08 & 50-414/81-08 on 810326-0425 & Notice of Violation
ML20009D897
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/20/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20009D878 List:
References
NUDOCS 8107240477
Download: ML20009D897 (2)


See also: IR 05000413/1981008

Text

,

.

.

.

OFFICIAL COPY

m

.

jf

o,

UNITED STATES

%

NUCLEAR REGULATORY COMMISSION

.

U~

aE

REGION li

k

'8

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA. GEORGIA 30303

.....

MAY 2 01981

Ouke Power Company

. . O. Parker, Jr.

ATTN:

W

Vice President, Steam Production

-

P. O. Box 2178

-Charlotte, NC _28242

Gentlemen:

Subject: Report Nos. 50-413/81-08 and 50-414/81-08

.

_

-1.is refers to the routine safety inspection conducted by Mr. P. K. VanDoorn of

th.s office on March 26 - April 25, 1981, of activities authorized by NRC

Construwon Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility.

Our

.

prelir.; nary findings were discussed with Mr. S. R. Dressler, Senior Construction

EngiNer, at the conclusion of the inspection.

Areas examined during the inscection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. Tne status of these items is discussed

in the enclosed report.

Two new unresolved itens are ideadfied in the enciosed inspection report. These

items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the. enclosed inspection report will be placed in the NRC's Public

Document Rcom. If the letter or report contains any information that you believe

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)

notify this office by telechone within ten (10) days from the date of this letter

of your intention to file a reauest for withholding; and (b) submit within 25

days from 4.he date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less then seven (7) days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(o)(1), any cuch apolication must be accompanied by an af fidavit

executed by the owner of the information which identifies the occument or part

8107240477 810706

T

PDR ADOCK 05000413 .

G

PDR

.- .-

-.

-

._

. - . .

.,.

.

.

.

.

.

MAY 2 01981

'

Duke Power Company

2

sought to be withheld, and which contains a full statement of the reasons for

claiming that the information should be withheld from public disclosure.

This

- section further requires the statement to address with specificity the conside-

ratinns listed in 10 CFR 2.790(b)(4). The information sought to be withheld

- shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

l

- ,

E.c.

m

._

R. C.

wis, Acting Director

,

Division of Resident and

Reactor Project Inspection

-

i

Enclosures:

1.

Appendix A, Notice of Violazion

- 2.

-Inspection Report Nos. 50-413/81-08

ant 50-414/81-08

cc w/ encl:

-

J. W. Hampton, Station Manager

G. G. Beam, Project Manager

'

,