Deficiency Rept Re Dravo Class I & III Pipe Spools,Initially Reported on 810501.Reinspection Program Is Being Completed. Liquid Penetration Exam Could Not Be Performed W/O Weld Surface Preparation.Results Provided by 810630
ML20008D518
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/27/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, KMLNRC-81-081, NUDOCS 8106050264
Download: ML20008D518 (1)


Text

- _. - - _ _ _

se.s ste)

Dm8 KANSAS GAS AND ELECTRIC COMPANY 4 t. E N N L stOESTEA vCE posse 0Ese?.anucLaam May 27, 1981 Mr. G.L. Madsen, Chief 9

Reactor Projects Branch U.S. Nuclear Regulatory Commission

/ /v y

9, k

Region IV

[ k{. L

.'G.

611 Ryan Plaza Drive

=

Suite 1000

'A 4 jggjp {;

p Arlington, Texas 76011 W u nsesm use W NB.'

O.

cimensum iciLNPC 81-081 9

Eff,Q&

y Ret Docket No. 50-482 Subj: 50.55(e) Report - Dravo Piping Spools g

Dear Mr. Madsen:

On May 1. 1981, Mr. Wm. G. Eales made a telephone report to Mr. W. Hubacek of your office regarding a potential deficiency of some of the Class I and Class III pipe spools supplied by Dravo Corporation. Background information can be found in the letter that Dravo sent to the NRC Region III Office (Dravo letter, Schwab to Keppler, dated 1/26/81).

A re-inspection program for Dravo piping spools is being completed at the Wolf Creek Generating Station. The initial inspection found some welds that had rough sur' ces, such that meaningful liquid penetrant examination could

_t be performed without weld surface preparation.

The results of the re-inspection program will be reported on or before June 30, 1981.

Yours very truly, a