January 18, 1990 (g
l DISTRIBUTION
.e5octe u p/f ~e g NRC & Local PDRs Docket Nos. 50-266 PDIll-3 r JHannon and 50-301-JZwolinski PKreutze WSwenson-OGC Mr. C.W. Fay, Vice President EJordan ACRS(10);
-Nuclear Power Department PDIII-3 gray MBoyle Wisconsin Electric Power Company JFlack 231 W. Michigan Street, Poom 308 Milwaukee, Wisconsin 53201
Dear Mr. C.W. Fay:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) - POINT BEACH 1/2 (TAC NO. 74452/53)
Generic Letter.88-20 requires, in part, that each operating reactor licensee and-construction permit holder: (1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submit the results to the NRC. This information was to be submitted to the NRC within 60 days of issuance of
-Supplement 1 of the generic letter.
We have reviewed your letter dated October 27, 1989, submitted in response to the reporting requirements of the generic letter. We conclude that your IPE approach, methodology and schedule are acceptable. We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not.have any adverse effect on your schedule. However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR, at (301) 492-1308 or Mr. John H. Flack, RES, at (301) 492-3979.
Sincerely,
-/s/
Warren Swenson, Project Manager Project Cirectorate III-3 Division of Reactor Projects - III, IV, V and Spectil Projects Office of Nuclear Reactor Regulation cc: See next page (s
Office:
P
/LA P@
-3/PD Name:
P er WSwenson/mw JHanFon Date:
l g/90 J/p/90
//g/90 l
nsas ange3 g\\0 e
\\
40, g a.y:.
J
. ; m --
tir. C". W. Fay,
Point Beach Nuclear Plant o
f
- Wisconsin Electric Power Company Units-1 and'2 y
cc:-
Mr.. Bruce Churchill, Esq.--
Shaw, Pittman, Potts and Trowbridge
-2300 N Street,.N.W.
o Washington,- DC 20037 Mr. James J. Zach, Manager.
. Point Beach Nuclear Plant JWisconsin Electric Power Company 6610-Nuclear Road'.
.Two Rivers, Wisconsin 54241 Town Chairman
. Town of Two-Creeks
' Route 3' Two Rivers, Wisconsin 54241' Chairman-Public Service Comission sof Wisconsin Hills Farms State Office Building
~
Madison, Wisconsin 53702 Regional Administrator, Region _III
'U.Sc Nuclear. Regulatory Commission Office of-Executive Director for Operations
'799: Roosevelt Road Glen Ellyn clilinois 60137 Resident Inspector'.s Office U.S.' Nuclear Regulatory Comission
.6612 Nuclear Road'
'Two Rivers, Wisconsin 54241 t