Forwards Safety Insp Rept 50-341/89-28 on 891030-1218.No Violations Noted.Mod Performed on Four Inboard MSIVs Considered to Be Positive Step in Effort to Reduce Util Local Penetration Leakage
ML20005E676
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/05/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20005E677 List:
References
NUDOCS 9001100082
Download: ML20005E676 (2)


See also: IR 05000341/1989028

Text

_

-

_ . . -

-

- - . - ~

!

!

m

.,

..

.

...

t

l

3N

5 1990

,

'

Docket No. 50-341

-The betroit Edison Company

.

ATTN:

B. Ralph Sylvia

'

.

,

Senior Vice: President

i

Nuclear Operations

6400 North Dixie Highway

.i

.

Newport, MI- 48166-

Gentlemen:

l

6

This refers to the routine safety inspection conducted by Ms. V. P. Lougheed

[

of this office on October 30 through December 18, 1989, of activities at Fermi

Huclear Power Station, Unit 2, as authorized by HRC 0)erating License

No. NPF-43, and to the discussion of our findings wit 1 Mr. B. Sheffel and

other members of your staff at the conclusion of the inspection.

I

The purpose of this inspection was to review and witness activities dealing

with the performance of your first periodic containment integrated leak rate

test and local containment penetration leak rate testing. Within these areas,

the inspection consisted of a selective examination of procedures and

,

representative records, observations, and interviews with personnel as well

as independent computation of your leakage results..

The results of this inspection indicate that you have failed the periodic

integrated leak rate test due to excessive as-found penetration leakage.

Although the periodic test result is overwhelmingly dominated by the main steam

' isolation valve (MSIV) leakages, it should be noted that the test would have

failed even if the MSIVs had been removed from the as-found leakage penalty.

Since your as-left test results are below the 10 CFR 50 Appendix J requirement

and since Appendix J allows for an as-found failure, no additional actions are

'

necessary on your part in regard to the periodic test.

7

We consider the modification performed on the four in-board MSIVs to be a

positive ste) in an effort to reduce your local penetration leakage. However,

it appears t1at additional effort is necessary on your part with regard to the

other containment isolation valve leakages. This is based on the periodic

test results and the fact that the local penetration results (Type B & C

L

testing) have exceeded the appendix J requirements for the last two outages.

We will continue to monitor your results for the local penetration tests.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

Obk bObd8$q

/

PDC

I }l? /

-

.

- .-

.

--.

-- -

(:

- -

-

...

'.

(

. . .

t ..

The Detroit Edison Coinpany

2

JAN

51990

.

'We will gladly' discuss any questions you have concerning this inspection.

i.

Sincerely,

ggg g i s'.G2ED SY C3 M N O'

--

!

Geoffrey C. Wright,~ Chief

,LL

Operations Branch

Enclosure:

Inspection

Report No. 50-341/89028(DRS)

cc w/ enclosure:

Patricia Anthony,-Licensing

P. A. Marquardt, Corporate

Legal Department

'

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

James R. Padgett

Harry H. Voight, Esq.

'

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

,

i

&.

'97

9

1

F: I

RI I

I

L

'

Lougheed/cg

Philit[if

D&ay te

prgJt

6dcE 90

d

o

j

g

c:

j