ML20005E072

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-219/89-27 on 891008-1104 & Notice of Violation
ML20005E072
Person / Time
Site: Oyster Creek
Issue date: 12/21/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20005E073 List:
References
NUDOCS 9001030204
Download: ML20005E072 (3)


See also: IR 05000219/1989027

Text

y

._

yy

\\

A

u

.A

n,. ~

.1

..

,

3,

'

.

DEC 211939

l

l

,

Docket No.

50-219

l

License No. 50-DPR-16

j

'GPU Nuclear Corporation

ATTN: Mr. Eugene E. Fitzpatrick

.

'

Vice President and Director

Oyster Creek Nuclear Generating Station

P. O. Box 388

Forked River, New Jersey 08731

!

Gentlemen:

j

Subject: : In s. pecti on' Report" No?. 50-219/89-27%

-

. ..o mm

o

m

_~m

This letter refers to the routine safety inspection conducted by M. Banerjee,

E. Collins and D. Lew, for the period' October 8, 1989, through November 4, 1989,

at the Oyster Creek Nuclear Generating Station. The inspection consisted of

i

document reviews, personnel interviews and observations of activities. The

t

enclosed report documents the inspection results.

Inspectors discussed the

findings with you and members of your staff after the inspection.

Paragraph 3.0 of the enclosed report discusses an event involving a temporary

variation to the core spray booster pump breaker.

The controls taken on the

temporary variation were not conducted in accordance with the site's procedural

requirements governing temporary variations. As a result of this event, the

. temporary variation was effectively modified for a period of time without the

appropriate safety review and documentation. Although no adverse condition

!

resulted from this event, your increased attention in the area of equipment

control is warranted to ensure that the appropriate safety review, documenta-

tion and verification of temporary variations is performed and that no adverse

'

i

condition exists.

Based on the results of this inspection, it appears that some of your activi-

ties with regard to temporary variation controls were not conducted in full

compliance with NRC requirements, as set forth in the Notice of Violation

enclosed herewith as Appendix A.

The violation has been categorized by

severity level in accordance with the " General Statement of Policy and Proce-

dure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement

Policy). You are required to respond to this letter and in preparing your

response you should follow the instructions in Appendix A.

I appreciate your cooperation with us in these matters.

l

Sincerely,.

g.u,

. eu. , pf

$d~ .; Om y: 'T

'

'/%

E. Wenzinger, Chief

f

(

Projects Branch No. 4

Division of Reactor Projects

OFFICIAL RECORD COPY

IR OC 89-27 - 0001.0.0

(k(

f

12/18/89

9001030204 891221

gDR. ADOCK 05000219

PDC

.

-

i

., oy

.

+

,- ,

.

.. .

f

,

'

GPU Nuclear Corporat1on

2

DEC 21139

e

i,

Enclosures: Appendix A, Notice of Violation

'

NRC Region I Report No. 50-219/89-27

'

cc w/encls:

BWR Licensing Manager

Licensing Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

!-

State of New Jersey

"

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encis)

DRP Section Chief (w/o encis)

DRS Director (w/o encis)

DRSS Director (w/o encis)

DRP: rih

  • DRP:RI
  • DRP: RI

ECollins/pj

CCowgill

ECWenzing

L 2

12 /J 4 /89

12 /14 /89

I # //89

  • See previous concurrences

OFFICIAL RECORD COPY

IR OC 89-27 - 0002.0.0

12/21/89

l

1

i

4

&

m.,,

,

-

-o.

,

.

GF0 Nuclear Corporation

2

Enclosures: Appendix A. Notice of Violation

NRC Region I Report No. 50-219/89-27

cc w/encis:

BWR Licensing Manager

Licensing Manager, Oyster Creek

,

Public Document Rooin (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

m

NRC Resident Inspector

State of New Jersey

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

DRP Section Chief

DRS Director

DRSS Director

i

DRP:RI[jf

DRP:RIdb

DRP:RI

EColliM pj

CCowgill

ECWenzinger

it/fl/89

I&///89

g / /89

/

0FFICIAL RECORD COPY

IR OC 89-27 - 0002.0.0

{

11/30/89

'

l

l

.

.

-