Ack Receipt of NRC 801222 Generic Ltr 81-07 Re Control of Heavy Loads.Interim Actions Are Not Applicable to Facility as CP Holder.Review Repts W/Design Change Info Will Be Provided by 810922
ML20004E444
Person / Time
Site: Beaver Valley
Issue date: 05/28/1981
From: Woolever E
DUQUESNE LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
2DLC-4059, GL-81-07, GL-81-7, NUDOCS 8106120189
Download: ML20004E444 (1)


Text

b dum

'Af M

(41a 4ss sooo "f,"/7 May 28, 1981

=

2DLC-4059 S:

2+

United States Nuclear Regulatory Commission Washington,, D. C.

20555 f)' {

J Ii 3

ATTENTION:

Mr. Darrel G. Eisenhut, Director f

Division of Licensing S Jup) 1 1 g j m _,

Office of Nuclear Reactor Regulation

]%

C3; canam

SUBJECT:

BEAVER VALLEY POWER STATION - UNIT NO. 2 Docket No. 50-412, CPPR 105 y) y Generic Letter 81-07 cs j,

Control of Heavy Loads Gentlemen:

We have reviewed your Generic Letter No. 81-07 and your letter dated 12/22/80 concerning control of heavy loads.

The 90 day interim actions described in enclosure two (2) of your 12/22/80 letter are not applicable to Beaver Valley Power Station - Unit No. 2 as a Construction Permit holder.

However, as a #tture Operating License applicant, we will submit review reports with design change information (if any) by 9/22/81 per your enclosure three (3) of the 12/22/30 letter.

If you have any further questions, please contact our staff.

l DUQUESNE LIGHT COMPANY by E. J/. Woolever l

Vice President cc:

l Mr. V. Stello, Director Office of In3pection and Enforcement Mr. B. H. Grier, Director Region 1 h

Mr. K. Jabbour, Project Manager 8

Licensing and Review g/8 20555 hWashington,D.C.