ML20003H617

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810201-28
ML20003H617
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/18/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20003H615 List:
References
50-267-81-03, 50-267-81-3, NUDOCS 8105060510
Download: ML20003H617 (2)


Text

,

Public Service Company of Colorado Docket No. 50-267/81-03 NOTICE OF VIOLATION Based on the results of an NRC inspection conducted during tte per kd of February 1-28, 1981, and in accordance with the Interim Enforcemenc Policy, 45 FR 66745 (October 7, 1980), the following violations were identified.

i 1.

Technical Specification LCO 4.8.2.(a) states that "the maximum instan-taneous release rate of radioactive liquid effluents from the site shall be such that the concentration of radionuclides in the Cooling Tower blowdown water discharge does not exceed the values in Table II, Column 2, 10 CFR 20, Appendix B, for unrestricted areas."

Contrary to the above, on February 3, 1981, at 11:15 a.m. it was determined by the licensee that the concentration of tritium in the Cooling Tower blowdown water discharge which was made on January 23 and 24, 1981, was 3.39E-3uci/cc and 3.57E-3uci/cc respectively, exceeding the limiting concentration for tritium (3.00E-3uci/cc).

This is a Severity Level IV Violation.

(Supplement I.D.2) 2.

Technical Specification 7.4, " Procedures, Administrative Controls,"

paragraph d, requires that " Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involvinq personnel radiation exposure."

Administrative Procedure P-3, " Radioactive / Contaminated Waste / Area Control,"

Issue 2, dated August 4, 1980 requires in paragraph 4.5.3 that "The environ-ment in controlled work areas must be monitored and the work authorized by l

use of a Radiation Work Permit as described by Procedure P-1."

Administrative Procedure P-1, " Plant Operations," Issue 2, dated l

August 4, 1980, requires in part in paragraph 4.6.2 that ".

Each assigned employee reads RWP and signs RWP to indicate the job instructions are understood.... "

[

Radiation Work Permit No. 2566, required a contamination check upon leaving the area on hands, clothing, shoes, and tools.

Contrary to the above, two maintenance individuals and one results individual were observed exiting from an RWP area on February 9, 1981, whereby the maintenance individuals failed to check their clothing for contamination, and the results individual failed to perform a contamina-tion check on hands, clothing, and shoes.

This is, Severity Level V Violation.

(Supplement I.E) 810 50fl0 510

)

2 Pursuant to the provisions of 10 CFR Part 2.201, Public Service Company of Colorado is hereby required to submit to this office within 25 days of the date of this Notice, a written statement or explanation in reply, including (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Under the autnority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Dated 3 ll fl9I YGbv' G. L. Madsen, Chief Reactor Projects Branch

.