ML20003A499
| ML20003A499 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/20/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20003A493 | List: |
| References | |
| NUDOCS 8102040163 | |
| Download: ML20003A499 (2) | |
See also: IR 05000413/1980029
Text
.
'o
UNITED STATES
[
3 mf[ g
NUCLEAR REGULATORY COMMISSION
,
g
fg e
REGION il
e,
8
101 MARRTTA cT., N.W., SUITE 3100
%,<
ATLANTA, G EoRGI A 30303
s
- ...*
In Reply Refer To:
NOV 2 01980
RII:WPK
50-413/80-29
50-414/80-29
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by W. P. Kleinsorge of this office on
October 14-17, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CFPR-117 for the Catawba facility, and to the discussion of our
findings held with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
l
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
,
l
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
i
inspection report will be placed in the NRC's Public Document Room.
If this
'
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
!
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
W2 Mono
..
.
.
-
._
. . _ .
_.-.
.
.
--..
-
-
,
i
- .
.
,
N0n/ 2 01980
9
Duke Power Company
-2-
.
!
i
I
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
1
Sincerely,
,
.
C. E. Murphy, Chief
i
Reactor Construction and Engineering
Support Branch
Enclosutes:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/80-29
and 50-414/80-29
!
cc w/ enc 1:
i
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
i
l
t
e,
e
5
i
_ _ _ . , . . _ , , _ . _
. . . _ . _
. . . _ ,
, _ _ . .
,
.-
- . .
.
. _ . .
-
--