P O W E R. & L I G H T! p o Box ecce. NEW CRLEANS. LOUIS 1ANA 70174 142 CELARCNoE STAEET Cod) 366-2345 sm UTUT:tS SYSTEM October 15, 1980 LPL 15269 Q-3-A20.03.14 Mr. Karl V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Cor: mission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford 3 SES Docket No. 50-382 IE Bulletin No. 80-20 Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches
Dear Mr. Seyfrit:
The referenced IE Bulletin addresses the failure of Westinghouse type W-2 spring return to neutral control switches. After evaluating all equipment purchased for Waterford 3 LP&L has concluded that no Westinghouse type W-2 spring return to neutral control switches are being used on the Waterford 3 site.
The manpower expended in this review effort was 4 mandays.
If you have any questions, please advise.
l l
Yours very truly, 9nw L. V. Maurin Project Director j
LVM/WMA/dde cc:
U. S. Nuclear Regulatory Cor: mission l
Division of Reactor Operation Inspection Office of Inspection and Enforcement Washington, D. C.
20555 pyn; 333 m e ; sc!t
'...G g!
fu J i
& ('/
gg12%
yw-w-F:Clli':cl'd