ML19350E612

From kanterella
Jump to navigation Jump to search
Forwards Design Criteria for Hot Chemistry Lab.Drains Will Be Added for Equipment Maint.Effect of Hot Chemistry Lab on Connecting Seismic Structures Will Be Evaluated
ML19350E612
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/17/1981
From: Hovey G
METROPOLITAN EDISON CO.
To: Barrett L
Office of Nuclear Reactor Regulation
Shared Package
ML19350E613 List:
References
LL2-81-0159, LL2-81-159, NUDOCS 8106230348
Download: ML19350E612 (1)


Text

~..,,.t.

e-f p'

Metropolitan Edison Company N

Post Office Box 480 Middletown, Pennsylvania 17057 Wr.ter's Direct Dial Number June 17, 1981

.3 LL2-81-0159

'G,

'c"

?=

7 '-

N5

~co TMI Program Office ne Attn:

Mr. Lake Barrett, Deputy Director n

gre U. S. Nuclear Regulatory Commission I '.

c/o Three Mile Island Nuclear Station c

]

Middletown, Pennsylvania 17057 E

v.

Dear Sir:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Hot Chemistry Laboratory Design Criteria Enclosed for your review is the Design Criteria for the. Hot Chemistry Laboratory (HCL).

In addition to the criteria described in the document, we intend to add the following criteria:

Drains will be added for equipment maintenance.

o o

The effect of the HCL on connecting seismic structures will be evaluated.

Based on our current work plans, we request your comments by July 6,1981.

tJe anticipate resolution to your comments consistent with a desired approval date of July 31, 1981._

I91,,

Sincerely, y

9

).

$\\

=

7 JUll 2 21981 m 1.

G. K. Hovey E

Vice-President and u.s. m a m a m m Ng Director, TMI-2 j

coawissa I

CKH:RBS:vjf

/

/Gr p\\

Enclosure 00I cc:

Dr. B. J. Snyder, Program Director, TMI Program Office 3

I(

F M Letroponta' E:. son Company s a Me-cr cf tre Ge ri E:.c UtJ.bes Sys:e~

8106230