ML19345C955
| ML19345C955 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/11/2019 |
| From: | NRC |
| To: | NRC/NRR/DNRL |
| References | |
| Download: ML19345C955 (4) | |
Text
From:
Gleaves, Billy Sent:
Wednesday, December 11, 2019 7:29 AM To:
Vogtle PEmails Cc:
Rankin, Jennivine
Subject:
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Attachments:
Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf These are the first 2 pages from the draft submittal for Vogtle LAR-19-020 on Cyber Security Plan Changes. These will be discussed at a meeting with SNC on 12/12/19.
Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
508 Mail Envelope Properties (BL0PR0901MB4387E7B0F55BAEA0E19D63699F5A0)
Subject:
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Sent Date:
12/11/2019 7:29:13 AM Received Date:
12/11/2019 7:29:17 AM From:
Gleaves, Billy Created By:
Bill.Gleaves@nrc.gov Recipients:
"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:
BL0PR0901MB4387.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 707 12/11/2019 7:29:17 AM Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf 659378 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 December XX, 2019 Docket Nos.:
52-025 ND-19-0000 52-026 10 CFR 50.90 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Request for License Amendment:
Cyber Security Plan Changes (LAR-19-020)
Ladies and Gentlemen:
In accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requests an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively). The requested amendment proposes changes to the VEGP Units 3 & 4 Cyber Security Plan (CSP).
The license amendment request (LAR) proposes changes to the VEGP Units 3 & 4 CSP to identify the VEGP 1&2 CSP for cyber security protection of digital assets in systems common to VEGP Units 1 through 4, to align language in the VEGP Units 3&4 CSP with the corresponding elements of the NRC-endorsed CSP template in NEI 08-09, Revision 6, including Addendum 1, and to enhance certain controls for the protection and safety monitoring system (PMS). SNC has reviewed the changes proposed in this LAR in accordance with the provisions of 10 CFR 50.54(p)(2) and has determined that a request for prior NRC approval constitutes the most prudent path forward. provides the description, technical evaluation, regulatory evaluation (including the Significant Hazards Consideration Determination) and environmental considerations for the proposed changes. Enclosure 2 identifies the requested changes and provides markups depicting the requested changes to the VEGP Units 3 and 4 current licensing basis documents. The information in Enclosures 1 and 2 contains Security-Related Information and, therefore, cannot be disclosed to the public in accordance with 10 CFR 2.390.
This letter contains no regulatory commitments.
SNC requests NRC staff review and approval of this license amendment request (LAR) no later than May 1, 2020 to support receipt of nuclear fuel for VEGP Unit 3. Delay approval of this license amendment could result in a delay in establishing the VEGP Unit 3 protected area boundary, and a subsequent delay in fuel receipt onsite. SNC expects to implement the proposed amendment within 30 days of approval of the LAR.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia by transmitting a copy of this letter and its enclosures to the designated State Official.
Should you have any questions, please contact Ms. Kelli A. Roberts at (706) 848-6991.
DRAFT mpany mpany Units 3 and 4 Units endment:
endme es es (LAR LA 020)
FT ern Nuclear Operating Company Operatin OLs) for Vogtle Electric Generating OLs) for Vogtle Electric Ge and NPF NPF-92, respectively) 92, respectively). The T
ts 3 & 4 Cyber Security Plan (CS 4 Cyber Security Plan (CS st (LAR) st (LA proposes changes to oses chan the the ber security protection of digital a ber security protection o n language in the VEGP Units 3&4 n language in the VEGP U CSP template in NEI 08 CSP template in NEI 08-09, Re 09, trols for the protection and safety ols for the protection and safety osed in this LAR n this LAR in accordance wi n accordance wi t a request for prior NRC approva request for prior 1 provides the 1 provides the description, tech description ant Hazards Consideration Dete ant Hazards Consideration De sed changes.
sed ch Enclosure sure 2 identif ntif uested changes to the VE uested changes to the n in Enclosures 1 and n in Enclosures 1 an to the public in ac to the public in a s no reg s no reg 12/12/2019 Pre-Submittal Meeting
U.S. Nuclear Regulatory Commission ND-19-0000 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the XXth of December 2019.
Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company Enclosures
- 1) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Request for License Amendment: Cyber Security Plan Changes (LAR-19-020)
(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)
- 2) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Proposed Changes to Licensing Basis Documents (LAR-19-020)
(CONTAINS SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390)
DRAFT ng Plant (VEGP) Units 3 and 4 ng Plant (VEGP) Unit Security Plan Security Changes (
hanges LAR ED INFORMATION INFORMATIO
- WITHHOLD THHO Generating Plant (VEGP) Units g Plant (VEGP) Units g Basis Documents (
g Basis Documents LAR-199 D INFORMATION D INFORMA
- WITHHOLD U WIT 12/12/2019 Pre-Submittal Meeting