% e ib Metropolitan Edison Company r
Post Office Box 480 Middletown. Pennsylvania 17057 717 944-4041 j
Writer's Direct Dial Numeer November 7,1980 TLL 547 Office of Inspection & Enforcement Attn:
B. H. Crier, Director Ragion I U. S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, Pa.
19406
Dear Sir:
i Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 IE Bulletin 80-06 Metropolitan Edison responded to the subject bulletin on July 2, 1980 (TLL 293).
Our response indicated that the valves listed in TI.L 293 would not remain in their emergency mode position upon reset of the containment isolation signal.
This determination was based on a review of the elementary diagrams. We committed to replace the control room switches to prevent this occurrence.
Further, as an interim position, we were to modify procedures to prohibit such an occurrence prior to replacing the switches.
Af ter further investigation and testing the switches in the control room which operate the listed valves, it was determined that the switches are not identical to those noted in the elementary diagrams. The presently installed switches prevent the valves from leaving their emergency mode position upon reset of the containment isolation signal. Therefore, the changes committed to in the response to Item 3 of TLL 293 are not required and will not be performed.
However, the elementary diagrams in error will be revised to reflect actual conditions and a test will be conducted to assure that the response of components are censistent with the design. The test will be conducted when plant conditions permit and is expected to be completed by February 28, 1981.
Sincerely,
',3 H. D. Hukill Director, TMI-l HDH:DGM: hah cc:
R. W. Reid D. Di! anni H. Silver J. T. Collins B. J. Snyder 077 verecentan asen comoany s a Memter of me Generat Pucoc utm:>es sys:em
.r
- METROPOLITAN EDISON COMPMN JERSEY CENTRAL POWER MID LIGHT COMPA:n AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Operating License No. DPR-50 Docket No. 50-289 This letter is submitted in support of the Nuclear Regulatory Commission request concerning the March 13, 1980 letter transmitting IE Bulletin 80-06 and is a revision of our July 2, 1980 letter. The revised response to the subject bulletin is contained in the cover letter attached. Further, all statements contained in these responses have been reviewed and all such statemen*.s made and matters set forth therein are true and correct to the best of my knowledge, information and belief.
Q'
/I
/
3y
/
Dir'ector, TMI-l Sworn and subscribed to me'this 7
day of 77d h !d, 1980.
By
/c U
Notary Ecblic PC W pg.,s joy LM**M. N;*W P
,,m._m w a'CZh.m gf gg f:c, Cr '
I e