ML19341B697
| ML19341B697 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 02/05/1981 |
| From: | David Jones, Mcalpine E, Todd G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19341B694 | List: |
| References | |
| 70-1151-80-28, NUDOCS 8102270043 | |
| Download: ML19341B697 (1) | |
Text
MATERIAL T2A35I,*JTTED IE3' lith C0HIAlHS 2J91:iFOR$.1AT10N peeta
/(
uq[o, UNITED STATES
+
j NUCLEAR REGULATORY COMMISSION w
REGION 11 c [c 101 MARIETT A ST., N.W., SUITE 3100 o,
%/
e
ATLANTA, GEORGI A 30303 FEB 0 51981 Report No. 70-1151/80-28 Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Drawer R Columbia, SC 29250 Docket No. 70-1151 License No. SNM-1107 Safeguards Group ' c: III Inspector
/
47 4
8/
(Tat (
d,{k di ted
< iu
.w.
7i ; i.,
D.
on ta ist cian
~
Date Approved by:
l #he
,b
/
s EW. WAlpine,41C$A Section Chief, Safeguards 7at/ ~
Branch
)
{
SUMMARY
Inspection on November 1-5, December 2-3, 1980 Areas Inspected This routine, announced Material Control and Accounting inspection involved 86 inspector-hours on site in the area of Physical Inventory Observation.
I Results l
Of the one area inspected, no items of noncompliance or deviations were identi-l fied.
1 i
i
?
8102880 y s-n i JO I
Copy of
_Copios Pases
~"
MATEE!AL TElliSidIIIE3 IIEEU'l!Ill tc specific Conwns2a;giica;fet
_e,a.,x,s m
-