Text
-
..
~
UNITED STATES
[
o').
ATOMIC ENERGY COMMISSION
-
7
DIRECTORATE OF REGULATORY OPERATIONS
'
\\ ..
REGION 111
5d
799 ROOSEVELT ROAD
mg
GLEN ELLYN, ILLINOIS 60137
(312) ass-zeso
AUG
6 1974
Commsessealth Edisca Company
Doeket No. 50-10
ATIN: Mr. Byron Lee, Jr.
Donket No. 50-249
Vise President
P.O. Bos 767
Chia ==a, 1114=ais
60690
Geme1====
This refers to the inspeetion conducted by Mr. F. Maura of this office
on May 7-10, 16, 17, 28-31 and June 7, 1974, of activities at Dresden
Units 1 and 3 authorised by ABC Operating Licenses No. DPR-2 and No.
DPR-25 and to the discussion of oer f4=di=g= with Mr. Stepherson and
other members of his staff at the comalunion of the inspection.
A espy of our report of this inspection is enclosed and identified the
-
areas ====in=d during the inspection. Within these areas, the taspection
consisted of a selective ====i== tion of procedures and representative
records, interviews with plant personnel, and observations by the inspector.
During this inspection we ====i==d your actions with respect to:
(1)
our enforeement letter dated February 28, 1974, (2) test performed to
demonstrate that the standby liquid control line to the reactor is open
as meted in our letter of October 19, 1972, and (3) the inse=11= tion of
testing equipment which uses steen rather than nitrogen in the testing
of safety valves at normal operating temperature conditions as noted in
our letter of May 12, 1972. We have no further questions on these items
at this time.
During this inspection, it was found that cartain of your activities
appear to be in violation of AEC requirements. The items and reference
to the portiment requirements are listed under Enforcement Action in the
Summary of Findings Section of the smalosed inspection report.
This notice is sent to you pursuant to the provisions of Section 2.201
~
of the AEC's " Rules of Practive," Part 2, Title 10. Code of Federal
Regulations. Section 2.201 requires you to subtit to this office within
twenty days of your receipt of this notice, a written statement or
explanation in reply, imeluding:
(1) corrective steps witich have been
,
taken by you, and the results mehiaved; (2) corrective steps which will
~ l
be taken to avoid further violations; and (3) the date when full compli==re
will be achieved. Such a statement or explanation should be provided
for each of the items listed.
- no 7(2
?
-
-
- - - - ---
__ . _ _ _
_
_
_
_ . _ _
..
,
O}
AUG
6 1974
.
. l
Commoamealth Edison Company
-2-
1
Based on the Unit 3 as found contai-t leakage rate and the deficianaima
related to the performance of the recently conducted Units 1 and 3
tests, we have r= - d=J to our Headquarters that the Unit 3 integrated
leak rate test be reseheduled the next ref==14== outage and that the
frequency of testing the Unit 3 feedveter check valves be increased.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part
2. Title 10. Code of Federal Regulariana, a copy of this notice, the
aantased inspection report, and your response to this notice will be
p1=eart in the AEC's Public Domanent Room.
If this report contains any
information that you or your contractors believe to be proprietary, it
is =======ry that you asks a written application to this office, within
twenty days of your receipt of this notice, to withhold such information
from publia disclosure. Any such application must include a full
statement of the reasons for which it is c1=f=ad that the information is
identified in the applicatica is contained in a separate part of the
document. Unless we receive an application to withhold information or
are otherwise contacted within the specified time period, the written
macerial identified in this paragraph will be placed in the Public
~
Document Room.
Should you have any guastions concerning this inspection, we will be
glad tra discuss them with you.
Sincerely yours,
James C. Kappler
Regional Director
Enclosure
RD Inspection Rpts No.
050-010/74-06 and
No. 050-249/74-05
ces
E. Stephenson
Dresden Station Superintendent, w/enci
)
bec:
R0 Chief, FS&EB
R0:HQ (4)
R0 Files
i
Licensing (4)
.
%F CCentral Files
Local PDR
DTIE
Anthony Roisman
'
.
-
- - - - - - - - -