ML19338F074

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 4.7.1.2b Verifying Normal Flow Path of turbine-driven Emergency Feedwater Sys Train
ML19338F074
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/17/1980
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19338F068 List:
References
NUDOCS 8010070498
Download: ML19338F074 (1)


Text

1 PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.

At least once per 18 months during shutdown by:

1.

Verifying that each automatic valve in the flow path actuates to its correct position on MSIS or EFAS test signals.

2.

Verifying that the motor driven pump starts automatically upon receipt of an EFAS test signal.

3.

Verifying that the turbine driven pump steam supply MOV opens automatically upon receipt of an EFAS test signal.

4.

Verifying the normal flow path of the turbine driven EFW trair, from the primary EFW system water source to the steam generators.

The provisions of Specification 4.0.4 are not applicable.

i ARKANSAS - UNIT 2 3/4 7-6 8810070 qty