Draft Phase III Test Procedure 501-7-001, Cooldown Capability of Charging & Letdown Sys
ML19331D949
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/26/1980
From:
ALABAMA POWER CO.
To:
Shared Package
ML19331D947 List:
References
501-7-001, 501-7-1, NUDOCS 8009040389
Download: ML19331D949 (16)


Text

-

=

501-7-001 J

July 26, 1980 Revision 0 FARIZI NUCLEAR PLANT UNIT 2 PEASE III TEST ?RCCEDURE 501-7-001 CCCLDOWN CAPABILITY OF THE CHARGING AND LETDOWN SYSTEM 4.

Approved:

h

  1. 3

, n.g Plant +ganager Date Issued:

i s

Diskette No. 4 8 0 09040 $% q

REVISICN NO. O PAGE NO.

0 1

2 3

4 6

7 8

9 10 11

'(

1 X

2 X

3 X

4 X

5 X

DATA SHEETS 1

X 2

X l

3 X

j i

4 X

id I

APPDTDII A I

i 1

X l

l lf A??ENDII 3

(

1 X

l l

2 X

i 3

I ATTAC3. 1 X

j i

l l

l I

(

Page 1 of 1 1

501-7-001 FARIZI NUCLEAR PLANT 9

UNIT 2 l

PEASE III TEST PRCCEDURE 501-7-001 C00LDOWN CAPA3ILITY OF THE CHARGING AND LETDOWN SYSTEM 1.0 Pur;cse This procedure contains the information necessary to verify plant performance capabilities and provide operator experience and training in the following condition:

1.1 Determination of the CCOLDOWN CAPA3ILITY OF THE CEARGING AND LETDOWN SYSTEM with all three S/G's isolated and one RCP in operation.

2.0 Initial Conditions 2.1 T

is approximately 535'F.

The Steam Dump i$V8perating (or available) to maintain T"Y" in

/

l the Steam Pressure Mode.

2.2 Pressurizer pressure is being maintained

/

at approximately 2235 psig by automatic operation of the Pressurizer Pressure Control System.

2.3 Pressurizer level is being maintained at

/

approximately 22% by automatic operation of the Pressurizer Level Control System.

2.4 The S/G's are being maintained at approxi-

/

mately 33%.

The Main Feedwater or AFW System is operating (or available) to maintain S/G levels.

2.5 23 RCP is running.

/

l 2.6 The CVCS is in a normal at-power lineup.

(

/

2.7 Excess letdown is available for operation.

l

/

t 2.8 Both shutdown banks are fully withdrawn.

/

2.9 RCS Soren concentration is high enough to

/

provide sufficient Shutdown Margin at 450 F 1

Rev. O

501-7-001 2.10 The Core Subcooling Monitor is operable.

k

/

1 2.11 Temporary instrumentation has been installed

/

as required by Appendix A of this procedure.

4 2.12 The computer trend printer is set up to

,l

/

monitor the parameters specified in Appendix B l

of this procedure.

2.13 All test equipment to be used during the

/

performance of this procedure is operational and in calibration, as verified on the Test Equipment Record, Data Sheet 1 of this procedure.

2.14 The Shift Supervisor has been notified of the

/

impending performance of this procedure.

2.15 S/G chemistry is in a condition such that

/

blowdown may be isolated for the duration of the test.

2.16 Prior to commencing this test, record the

/

following information (as applicable) on each Recorder Strip Chart.

Test Procedure Number Recorder Number Time and Date Chart Speed Scale of each Pen Input to each Pen 3.0 Precautions and Limitations 3.1 The difference in Boron concentration between the RCS and Pressurizer should not exceed 50 ppm.

Use Pressurizer Spray to equalize concen-tration.

3.2 Monitor and record Source Range count rate on Data Sheet 4 every 15 minutes.

Any unexplained increase in count rate by a factor of two is grounds for test termination and investigation for cause.

2 Rev. O

501-7-001 4.0 Instructions 4.1 Record the "d me on the recorder charts in the

/

instrument rack area and/or Control Room and start the recorders at an appropriate speed determined by the Test Supervisor.

4.2 Record the initial plant conditions on Data

/

Sheet 2.

4.3 Close the Main Steam Line 2A (B, C) upstream

/

drain pot to Aux Steam Condensate Tank isolation valves Q2N11V006A (B, C) and Q2N11V008A (B, C).

4.4 Shutdown the S/G Blowdown System, if in

/

operation, using FNP-2-SOP-16.1.

4.5 Stop 2A and 2C RC?'s, if operating.

/

4.6 Adjust T to 535*F 2*F using the Steam ave

/

Dump.

4.7 Stop feeding the S/G's and shutdown the AFW

/

System using FNP-2-SOP-22.0 or the Main Feedwater System using FNP-2-SOP-21.0.

4.8 Verify that S/G 23 Atmospheric Relief Valve

/

is in AUTO and set for 1035 psig.

4.9 C1cse all six MSIV's.

/

4.10 Verify that the Pressuriser Level Control

/

System is in AUTO.

4.11 Increase letdown flow to maximum using

/

FNP-2-SOP-2.1.

NOTE T

may increase or decrease decending odVIhe charging temperature and "flowrate and RCS ambient losses.

4.12 Maintain the flow conditions established in

/

step 4.11 for 30 minutes, or until T decreases to 525*F, or until T incFeases to"535 F, whichever comes :1:sIY" Record the information required in Data sheets 3 and 4.

3 Rev. O

501-7-001 W

CAUTION If T reaches 545 F, proceed directly tosfd$4.15.

4.13 After 30 minutes or when T reaches 525 F reduce letdown flow to minfEdm using FNP-2-SOP-2.1.

/

CAUTION Maintain 6 to 13 gym seal injection flow to 23 RCP.

4.14 Maintain the flow conditions established in

/

step 4.13 for 30 minutes or until T decreases to 520*F, or until T increases t8V545*F, whichever i:omes firsgye Record the information required in Data Sheets 3 and 4.

4.15 Stop the recorders and trend printer after

/

the test is completed and restore plant conditions using the following steps.

4.16 Re-establish normal Charging and Letdown

/

conditions.

4.17 If necessary restore normal levels in all

/

three S/G's with the AFW System using FNP-2-SOP-22.0.

4.18 Verify that the Steam Dump is set up for Steam

/

Pressure Mode operation using FN?-2-SOP-18.0.

4.19 Cpen the MSIV's using FNP-2-SOP-17.0.

4.20 If required, restore S/G Blowdown using

/

FNP-2-SOP-16.1.

4.21 Notify the Shift Supervisor that this Test

/

is complate.

4 Rev. O

501-7-001 4.22 Verify that all Data Sheets associated with

/

this procedure are complete and signed-off (where required).

4.23 Attach all relevant printouts and strip charts

/

to this procedure and remove the temporary instrumentation if this concludes Natural Circulation testing.

Completed By:

Time /Date:

5.0 Acceotance Criteria The effects on T"E,tes have been determined.of variations in Chargin S.1 and Letdown flow a

/

6.0 References 6.1 PLS Document 6.2 Farley Unit 2 Technical Specifications 6.3 VEPCO North Anna Unit 2 procedure 2-ST-6 6.4 Westinghouse Safety Evaluation for Farley Unit 2 Natural Circulation Testing.

7.0 Data Sheets, and Attachments 501-7-001 Data Sheet 1:

TEST EQUI? MENT RECORD 501-7-001 Data Sheet 2:

INITIAL PLANT CONDITIONS 501-7-001 Data Sheet 3:

LETDOWN AND CHARGING l

501-7-001 Data Sheet 4:

SCURCE RANGE COUNT RATE l

l 501-7-001 Appendix A:

TEM?CRARY RECORDERS 501-7-001 Appendix 3:

PRCCESS COMPUTER TREND BLCCKS l C 501-7-001 Attachment 1:

TRAINING ATTENDANCE S~c:.ZT t

5 Rev. O l

501-7-001 Data Sheet 1 Revision 0 Page 1 of 1 DATA SEEET 1 TEST EQUIP N RECORD TEST EQUIP N

  • FNP or CAL DUE DATES DESCRIPTION ID NUMBER DATE USED t

I This applies only to temporarily installed test equipment

=

or inst mentation.

Permanent insementation which is cart

~

of the system and shown on drawings, should not be included.

Test Supervisor

/

rate signatura

501-7-001 Data Sheet 2 Revision 0

?cge 1 of 1 i

DATA SEEET 2 INITIAL PLANT CONDITIONS - STEADY STATE REACTOR CCOLANT SYSTEM Pressurizer Pressure PR-444 (Red Pen) psig Pressurizer Level LR-459 (Red Pen)

RCS Loop 1 Eot Leg Temperature TR-413 (Red Pen)

  • F RCS Loop 1 Cold Leg Temperature TR-410 (Red Pen)
  • F RCS Loop 2 Ect Leg Temperature TR-413 (Blue Pen)
  • F RCS Loop 2 Cold Leg Temperature TR-410 (Blue Pen)
  • F RCS Loop 3 Hot Leg Temperature TR-413 (Green Pen)

F RCS Loop 3 Cold Leg Temperature TR-410 (Green Pen)

Steam Generator 2 Level (WR) LR-477 Pen 2 (Green)

Steam Generator 3 Level (WR) LR-477 Pen 3 (Blue)

Steam Generator 2A Pressure PI-474 psig Steam Generator 23 Pressure PI-484 psig Steam Generator 2C Pressure PI-494 psig Data Taken by

/

en

501-7-001 Data Sheet 3 Revision 0 Page 1 of 1 DATA SEEET 3 LETDOWN AND CHARGING Maximum Letdown and Charging Charging Flow gym Letdown Flow gpm data for the F (Use the T"Ee running RCP.)

Average Temperature Change loop with Time Period Min.

Rate of Temperature Change = Avg. Change 2

=

(Time Period /60) hr.

Minimum Letdown and Charging (if applicable)

Charging Flow gpm Letdown Flow gym Average Temperature Change

  • F (Use the T"Ee running RCP.)

data for the loop with Time Period Min.

Rate of Temperature Change = Avg. Change

  • F

=

(Time Period /60)

IE.

i Data Taken by

/

Signature Date

501-7-001 Data Shoot 4 Revision 0 I

Page 1 of 1 DATA SEEET 4 SOURCE RANGE COUNT RATE l

PRCCEDURE TIME

  • STEP NI-31 NI-32 l

i Record Source Range Count Rate everf 15 minutes i

f Data Taken by

/

Signature Date

501-7-00' l-Appandix A Revision 0 Page 1 of 1 APPENDIX A 1

TEMPORARY RECORDERS Connect temporary strip-chart recorders as indicated below.

l l

NOTE 4

set the chart speed on the following recorders to 25 mm/ min.

1.0 Strip-Chart Recorder No. 1 Channel Connection Monitorinc.

1 FF-4143, Cl-432 RCS Flow, Loop 1 2

FF-4243, Cl-433 RCS Flow, Loop 2 l

3 FP-4343, Cl-434 RCS Flow, Loop 3 4

FQY-122, CE 522 RCS Charging Flow 5

FQY-150, CS-4 ' :

RCS Letdown Flow 2.0 Strip-Chart Recorder No. 2 Channel Connection Monitorinc gyg, Loog 1

T?-412K, Cl-423 Narrow Rr.ge T 2

TP-422K, C2-423 Narrow Nange T b

k AVG'

~

3 TP-432K, C3-723 Narros Range T bU k AVG' The above installation has been completed and check-out is satisfactory.

Completed by:

/

signature Date Test Supervisor:

/

Signature Date!

The above installation has been removed.

m Completed by:

/

Signature Date Test Supervisor:

/

501-7-001 Appendix B Revision 0 Page 1 of 3 s

PROCESS COMPUTER TREND BLOCK A COLUMNS ADDRESS PARAMETER LWITS 1

TO406A RCL A TCOID 2

T0426A RCL P TCOLD 3

T0446A RCL C TCOLD 4

T0419A.

RCL A TECT 5

T0439A RCL B TECT 6

T0459A RCL C TECT 7

T0400A T

LOOP A F

gyg 8

T0420A T

LOOP 3

  • F g7g 9

T0440A T

LOOP C F

gyg 10 T0403A AT LCOP A 11 T0423A AT LOOP 3 12 T0443A aT LCOP C 13 F0128A CHARGING FLOW GPM 14 F0134A LETDCWN FLOW GPM 15 U1250 EIGEEST REL FUEL ASSY PWR 16 LO480A PRESSURIZER LEVEL 17 LO112A VCT I2 VEL 18 U1251 EIGEEST REL ASSY PWR INDENT

501-7-001 Appendix S Revision 0 Page 2 of 3 PRCCESS COMPUTER TREND BLCCK 3 CCMUMNS ADDRESS PARAMETER UNITS 1

LO400A S/G A LEVEL 2

LO420A S/G B LEVEL 3

LO440A S/G C LEVEL 4

PO400A S/G A PRESS PSIG 5

PO420A S/G B PRESS PSIG 6

PO440A S/G C PRESS PSIG 7

PO483A PRESSURIEER P PSIG 8

PO499A RC SYSTEM P PSIG 1

9 P0142A CHARGING PRESS PSIG 10 UO462 AVG PZR PRESS PSIG 11 UO483 AVG PZR LEVEL 12 U1118 RX THERMAL POWER MW 13 U1170 AVG T/C TEMP F

14 AS REQUIRED EOTTEST T/C (QUADRANT 1)

F 15 AS REQUIRED ECTTEST T/C (QUADRANT 2)

F 16 AS REQUIRED ECTTEST T/C (QUADRUTP 3)

  • F 17 AS REQUIRED ECTTEST T/C (QUADRANT 4)

F m

e

501-7-001 Appendix B Revision 0 Page 3 of 3 PROCESS CCMPUTER TREND BLCCK C 1

COLUMNS ADDRESS PARAMETER UNITS 1

T0003A INCORE T/C F

2 T0006A INCORE T/C

  • F 3

T0002A INCORE T/C F

4 T0005A INCORE T/C F

5 T0020A INCORE T/C F

6 T0024A INCORE T/C F

7 T0022A INCORE T/C

  • F S

T0023A INCORE T/C

  • F 9

T0045A INCORE T/C

  • F 10 T0033A INCOBE T/C

'F 11 T0036A INCORE T/C

  • F 12 T0029A INCORE T/C
  • F 13 T0030A INCORE T/C F

14 T0046A INCORE T/C

  • F 15 T0048A INCORE T/C
  • F 16 T0044A INCORE T/C
  • F 17 PO499A RC SYSTEM P PSIG 18 PO484A PRESSURIZER P PSIG

50 001 Attachmont i

~

n NOTE The Training Attendance Sheet will be orovided in the Control Room by the Training Department, prior'to the performance of this procedure.