ML19331D757

From kanterella
Jump to navigation Jump to search
Forwards Addl Info That Resulted from Preliminary Review of FSAR Per 800731 Request
ML19331D757
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/28/1980
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SLNRC-80-40, NUDOCS 8009030541
Download: ML19331D757 (10)


Text

.

e

/

SNUPPS Standardsed Nuclear Unit Pouset Mont System a cheme cherry n.ed Nicholas A. Petrick v

and 20050 Executive Director August 28, 1980 SLNRC 80-40 FILE: 0541 SUBJ: Responses to Acceptance Review Questions Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket Nos. STN 50-482, STN 50-483, STN 50 486

References:

1. NRC letter (D.G. Eisenhuti to Union Electric Company (J. K. Bryan), dated Jc'y 31, 1980: Acceptance Review for the Callaway Plants, Unit No. 1 and 2.
2. NRC letter (0.G. Eisenhut) to Kansas Gas and Elec+ric Company (G.L. Koester), dated July 31, 1980: Acceptance Review for the Wolf Creek Generating Station, Unit No. 1

Dear Mr. Denton:

The referenced letters included requests for additional information that resulted fron,the preliminary review of the SNUPPS FSAR and the Callaway and Wolf Creek Site Addenda. The enclosure to this letter provides the responses to those requests. The questions ard responses will also be incorporated in the next revision to the FSARs.

Ver truly yours,

-fMAC Nicholas A. Petrick RLS:dck:lall cc:

J. K. Bryan UE G. L. Koester KGE

0. T. McPhee KCPL pool s

///

.80090s0 Sql h

s' Attachment to SLNRC 80- 40 SNUPPS Responses to Acceptance Review Questions 110.01 Section 3.10(b).2 addresses only Bechtel's scope of supply.

Olscuss your compliance with IEEE 344, 1975 and Regulatory Guide 1.100 for equipment outside Bechtel's scope of supply.

Response-Section 3.10 is presented in two parts: 3.10(B) and 3.10(N).

Section 3.10(N) contains discussions on the compliance of the NSSS (Westinghouse) equipment to IEEE-344, 1975 and Regula-tory Guide 1.100. All equipment subject to R.G. 1.100 is discussed in either 3.10(B) or 3.10(N).

040.01 Figure 8.3-1 shows a " hold" symbcl next to MCC PG 12J.

Explain.

Response

The circle next to MCC PG 12J on Figure 8.3-1 was inadver-tently not removed for the original submittal of the FSAR.

The,srcle indicates that a change had taken place from the previous revision of the P&ID.

040.02 Figure 8.3-2 has several loads listed as "later".

Indicate the status of these loads.

Response

Since the original revision of the FSAR, Figure 8.3-2 has been revised to provide information for all "laters".

010.01 Describe the device located on the suction side of the aux-iliary feedwater pumps. This item is identified as SS001, S5002 and S5003 on Figure 10.4-9.

Response

The P&ID legend is provided on FSAR Figure 1.1-1.

The sub-ject device is a startup strainer. The strainers are used during the preoperational cleaning and testing program.

-Startup strainers in safety-related systems will be removed prior to fuel load.

I

Attachment to SLNRC 80-40 Page Two Wolf Creer Responses to Acceptance Review Questions 310.01 Figure 2.1-7 shows an abandoned A.T. & S.F. railroad line passing through the Wolf Creek site. Please explain the status of this line. Olscuss any easements which may exist relative to this railroad line.

Response

The Santa Fe Railroad and right-of-way located 0.3 miles west of the plant site is abandoned.

By Interstate Com-merce Commission Order in Finance Docket No. 26591, dated February 4,1972, captioned Atchison, Topeka and Santa Fe Railroad Company Abandonment, B. H. Junction and Gridley, Franklin and Coffey Counties, it was ordered that the branch line of the railroad extending between milcpost 0.0 at B. H.

Junction, Kansas, and milepost 52 plus 1,518 feet at Gridley, Kansas, be abandoned. With this abandonment, title of the right-of-way property reverted to the fee simple title owners.

310.02 The population of Burlington in the year 2010, as shown in Figure 2.1-13, is difficult to read. Please provide the population estimates for Burlington for the years 1990, 2000, 2010 and 2020.

Response

The population estimates for Burlington are given in the follcwing table.

Reference Burlington Figure Year Population 2.1-10 1980 1560 2.1-11 1990 1730 2.1-12 2000 1880 2.1-13 2010 1700 2.1-14 2020 1500 310.03 Discuss any recreational areas within the Wolf Creek site boundary.

Response-A feasibility study of the uses of the Wolf Creek cooling lake is provided in Appendix 2A of the Wolf Creek Generating Station Environmental Report-Operating License Stage.

No e

Attachment to SLNRC 80-40 Page Three recreational areas presently exist and none are planned to exist within the Wolf Creek site boundary.

422.01 Please provide the Administrative Controls Section of the Technical Specifications which describes the PSRC supervi-sory and technical personnel referenced in Section 13.4.1.1.

Response

A copy of the proposed Section 6.5.1, Plant Safety Review Committee, of the Plant Technical Specifications is attached.

440.01 Please provide a scheduled completion date for the plant ad-ministrative procedures which are referred to in Section 13.5.1.

Response

These procedures have been written, approved and issued for use at Wolf Creek. Staffing changes and reorganization have re-quired these procedures to be rewritten.

It is expected that revisions to these procedures will be made by 12-1-81.

440.02 Please indicate that you intend to include procedures for de-sign change processing, retest after design changes, and con-trol of plant docurents and records in the plant administra-tive procedures.

Response

Administrative procedures governing design change processing, providing general retest requirements after design changes and controlling plant documents and records in the plant ad-ministrative procedures will be written.

4

~

Attachment:

t3 SLNRC 80-40 Page Four 6.5.1 PLANT SAFETY REVIEW COMMITTEE FUNCTION 6.5.1.1 The Plant Safety Review Committee shall function to advise the Plant Superintendent on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The Plant Safety Review Committee (PSRC) shall be composed of the:

Chairman Plant Superintendent Member Operations Supervisor Member Technical Support Supervisor Member Maintenance Supervisor Member Plant Support Supervisor Member Instrument and Control Supervisor Member Reactor Supervisor Member Health Physicist i

Member Chemist Member Results Supervisor ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSRC Chairman to serve on a tem-4 porary basis; however, no more than two alter-1 nates shall participate as voting members in PSRC activities at any one time.

MEETING FRE00ENCY 6.5.1.4 The PSRC shall meet at least once per calendar month or as convened by the PSRC Chairman or his designated alternate.

OUORUM 6.5.1.5 The minimum quorum of the PSRC necessary for the performance of t>.e PSRC responsibility and authority provisions of these technical speci-fications shall consist of the Chairman or his designated alternate and four members including alternates.

4 RESPONSIBILITIES 6.5.1.6 The Plant Safety Review Committee shall be re-sponsible for:

-a r

-rm,-v-m m

.r.

g

Attachment to

- SLNRC 80-40 Page Five a.

Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Plant Super-intendent to affect nuclear safety.

b.

Review of all proposed tests and experi-ments that affect nuclear safety, c.

Review of all proposed changes to Appen-dix "A" Technical Specifications, d.

Review of all proposed changes or modif f-cations to unit systems or equipment that affect nuclear safety.

e.

Investigatton of all violations of the Technical Specifications, including the review arJ forwarding of reports covering evaluation and recommendations to prevent recurrence to the Director of Nuclear Operations and to the Nuclear Safety Review Committee, f.

Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.

g.

Review of unit operations to detect poten-tial nuclear safety hazards.

h.

Performance of special reviews, investiga-tions or analyses and reports thereon as requested by the Plant Superintendent or the Nuclear Safety Review Committee.

1.

Review of the Security Plan and implement-ing procedures and shall submit recommended changes to the Nuclear Safety Review Com-mittee.

j.

Review of the Emergency Plan and imple-menting procedures and shall submit recom-mended changes to the Nuclear Safety Re-

)

view Committee.

AUTHORITY 6.5.1.7 The Plant Safety Review Committee shall:

a.

Recommend in writing to the Plant Super-intendent approval or disapproval of items considered under 6.5.1.6(a) through (d) above.

M o%

~

Attachment to SLNRC 80 40 Page Six b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question, c.

Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Director of Nucle 6r Operations and the Nuclear Safety Review Committee of disagree-ment between the PSRC and the Plant Superin-tendent; however, the Plant Superintendent shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The Plant Safety Review Committee shall maintain written minutes of each meeting that, at a minimum, document the results of all PSRC activities per-formed under the responsibility and authority pro-visions of these technical specifications.

Copies l

shall be provided to the Director of Nuclear Oper-l ations and the Nuclear Safety Review Committee.

I 1

4

E, -

1 Attachment SLNRC 80-40 Page Seven Callaway Responses to Acceptance Review Questions 310.01 Discuss the mineral rights for all land.within the Callaway exclusion area.

Response

Union Electric owns all land within the exclusion area. The nature and source of authority to determine all activities on this property is by virtue of the rights of ownership thereof. As the exclusion area lands are owned in fee simple, Union Electric has complete ownership of the minerals on and under their lands.

310.02 Discuss any recreational areas within the Callaway site boundary.

Resoonse Various types of public use or development are permitted within the Union Electric property boundaries. Public use is governed by Union Electric policy and NRC regulations relating to the Protected Zone, the Exclusion Zone, and the Restricted Zone. The anticipated use within these zones during the operating life of the plant is discussed below.

The Protected Zone is a fenced area surrounding the reactor building and safety-related f acilities wit'nin the plant site area. This area is covered by plant security and access is granted only to authorized personnel.

The Exclusion Zone is the area around the plant to a radial distance of 1,200 meters. Union Electric retains control of this area, and residence in this zone is prchibited.

No de-velopments attracting uncontrolled public activity in or en-couraging casual public entry into the area are permitted.

The Restricted Zone includes all property defined by Union Electric as " plant site area" (see FSAR Site Addendum Figure 2.1-2forthisboundary). No residence or dairying opera-tions will be permitted within this zone during plant opera-tion. Developments with public attractions are permitted within this zone outside the Exclusion Zone.

Within the Union Electric ownership area, outside the plant site area, residence is permitted and developments may in-clude public attractions.

In cooperation with Union Electric, the Missouri Department of Conservation in 1976 prepared a plan for the development

Attachment to SLNRC 80-40 Page Eight and management of the forest, fish, and wildlife resources within the Callaway Plant property. Because of the zone controls and the need to effect evacuation procedures in the event of postulated accidental radiation releases, the land-use programs ultimately recommended for the Callaway Plant site are of a low-intensity nature. Recommendations included the f-110 wing: forest management, agriculture, research, wildlife management, hunting, fishing, picnicking, vistas and special areas.

The plan is flexible, and recommended activities can be further emphasized or modified to accommo-date additional priorities or restrictions.

In 1977, Union Electric and the Missouri Conservation Commis-sion entered into an agreement for an initial 5-year manage-ment plan that would be self-supporting and less intensive than the original plan. This plan presently allows public recreational use on designated lands within the Callaway Plant property coundaries; however, camping and use of firearms (firing a single projectile) are not permitted. User data on the Reform Wildlife Management Area is given in FSAR Sec-tion 2.1.3.3.

310.03 Explain the statement in Section 2.1.1.3.1 which roads

" Future developments may include public attractions without entry restriction".

Response

The statement means that the general public will be allowed to enter the restricted area to take advantage of public attractions as described in the response to item 310.02, with-out security restrictions.

310.04 Discuss the projections of industrial growth (2.2.2.6).

Response

The Callaway Plant is located in a sparsely populated rural area, with little existing or projected urban or industrial development within a 5-mile radius.

The primary land use trend in Callaway County has been the continued abandonment and consolidation of farms. Approxi-mately seven percent of the county's land area went out of farm production within the ten-year period from 1964 to 1974.

No trends have been identified that would disturb the rural agriculture and forested characteristics pre 1ent today within five miles of the Callaway Plant. This projection is based on population projections and trends observed over several years. A field reconnaissance by Dames & Moore in 1979 noted only minor new developments since 1973 within five miles of

Attachment to SLNRC 80- 40 Page Nine the Callaway Plant, not including site construction activi-ties. New developments include approximately six homes, two taverns, four small trailer parks, two gas stations, a cafe,

.and two small trucking companies. A review of 1979 aerial '

photographs indicated a conversion of approximately 1,240 acres of pasture to croplard within five miles of the Callaway Plunt since 1973. Changer, in all other land use types were less than 1 percent during the same period.

310.05 Olscuss chlorine storage including volumes and location at the Callawa" site.

Resoonse No gaseous or liquid chlorine is stored or used at the Callaway Site.

Sodium hypochlorite solution is added to the Circulating and Service Water Systems to prevent the systems from fouling with organic growths.

The sodium hypochlorite is produced on-site using a packaged electrolytic generation system. The hypochlorite generation system, along with other chemical feed equipment, is located in the Cooling Water Chemical Control System Building which is near the Circulating and Service Water Pumphouse adjacent to the natural draft cooling tower. Rock salt is used as a raw material to produce a 0.8% sodium hypochlorite solution.

Approximately 17,500 lb/ day of rock salt will be used at max-imum system capacity, which is 5,000 lb/ day of equivalent available chlorine. Rock salt is stored in two brinemaking tanks. The upper portion of each tank provides dry salt stor-age. Water is introduced in the lower portion to produce a saturated brine solution. The brine is diluted with softened water before entering the electrolytic cell, where the con-version to sodium hypochl9 rite occurs. The hypochlorite so-lution is pumped from the cell to three 25,000-gallon vertical storage tanks. Centrifugal pumps feed the hypochlorite to the circulating and service water pump intake bays. The hypo-chlorite circulates through the system being treated and the cooling tower before entering the blowdown discharge stream.

4