Requests Transmittal of Encl Notice of Receipt of Application for Fr Publication
ML19329C648
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/31/1970
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Robinson S
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002180160
Download: ML19329C648 (1)


Text

..

9 g c. P4

~

DEC 31 C Stanley T. Robinson, Jr., Chief, Public Proceedings Branch. Of fice of the Secretary of the Commission NOTICE OF RECEIPT OF APPLICATION - CAVIS-EESSE Please arrange for publication of the subject notice in the earliest possible issue of Luc Federal Ree8. ster.

C/ b4 c < < A -.-

f jf' Peter A. Morris, Director

- l.i Division of 2eactor Licensin g b

1%N&

i dl DRk..,.... i.......

I l

f

!PWh$f.........D omcz > '.ccc g.

' L.

l i

SURNtME>.MU$$.1.h.3.E.k.k j.....Nb..h 8......

i12-30-70 l 12- -70 i

l..

I 3

DATE > I FbrtIn AEC.31as i Rev. 9-53)

UA eowtanant enTine orria a ase-o-se4sse 8002180 /[O A

s ATOMIC ENERGY COMMISSION (Docket No. 50-344]

TOLEDO EDlSON CO. AND CLEVELAND ELECTRIC ILLUMINATING CO.

Notice of Receipt of Application for Construction Permit and Operating License; Time for Submission of Views on Antitrust Matter The Toledo Edison Co., 420 Madison Avenue, Toledo, Ohio 43601, and The Cleveland Electric Illuminating Co., 55 Public Square, Cleveland, Ohio 44101, pursuant to section 104b. of the Atomic Energy Act of 1954, as amended, have filed an application dated August 1, 1969, for a construction permit and a facility license to authorize construction and operation of a pressurized water nuclear reactor on the applicants' approximately 900-acre site on the southwest shore of Lake Erie, about 21 miles east of Toledo and about 9 miles northwest of Port Clinton, in Ottawa County, Ohio.

The proposed reactor, designated by the applicants as the Davis-Besse Nuclear Power Station (the station), is designed for initial operation at approximately 2,633 megawatts thermal, with a net electrical output of approximately 872 megawatts.

The Toledo Edison Co. and The Cleveland Electric Illuminating Co. as tenants in common will share undivided cwnership of the station and the site, with each sharing the costs of construction and operation of the station. Toledo Edison will have complete responsibility for

. the design, installation and operation of the facility.

4 foo2/IFO/03 A ~~

g m

f 2

Any person who wishes to have his views on the antitrust aspects of the application presented to the Attorney General for considera-tion shall submit such views within sixty (60) days from date of i

publication of this notice in the FEDERAL REGISTER.

A copy of the application is available for public inspection at the Commission's Public Document Room, 1717 H Street,N. W., Washington, D. C., and at the Ida Rupp Public Library, Port Clinton, Ohio.

FOR THE ATOMIC ENERGY COMMISSION

  • A4 y/ l-

+

h Peter A. Morris, Director Division of Reactor Licensing Dated at Bethesda, Maryland, this 3/kay of December,1970.