Text
~
fg o.
- OYSTER CREEK NUCLEAR GENERATING STATION Ir L J j 1-pA',16,,fdg.,8jg (609) 693-1951 P.O. BOX 388
- FORKED RIVER
- 08731 f""
cene urue sacm July 7, 1980 Mr. Boyce H. Grier, Director Office of Inspection & Enforcemnt United States Nuclear Regulatory Comnission Region I 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Grier:
i
Subject:
Oyster Creek Nuclear Generating Station Ibcket No. 50-219 I. E. Bulletin No. 80-08 The purpose of this letter is to respond to I. E. Bulletin No.
80-08 which requests infonration regarding contaiment liner penetration welds. Our response to Iction itens I through 3 are given in Attachment I.
Attachment II contains specific infonration requested by Iction Itens 2 b. and 2 c.
]
Very truly yours, i
j 3
r AR/DAR/jgb Donald A. Pass Attachmnts (2)
Manager Nuclear Generation cc: Director Division of Reactor Construction Inspection Washington, DC 20555 8007250 / 76 1
e 4
ATIPLIFENT I OYSTER CREEK NtK1 EAR GENERATING S'IATION I. E. BUILETIN 80-08 1.
Determine if your facility contains the flued head design for penetration connections, or other designs with containment boundary butt weld (s) between the penetration sleeve and process piping as illustrated in Figure NE 1120-1, Winter 1975 Addenda to the 1974 and later editions of the ASbE B&PV ODde.
Response
We have determined that 17 containment penetrations are of the type illustrated in Figure NE 1120-1, Winter 1975 Addenda of the ASbE Boiler and Pressure Vessel Code.
2.
If an affirmative answer is reached for Item 1, determine the following:
a)
Applicability of the ASME Code including year and addenda and/or Regulatory Guide 1.19, b)
Type of nondestructive examinations performed during construction, c)
Type of weld joint (including pipe material and size) and whether or not backing bars were used, d)
Results of construction nondestructive examinations, i.e.,
if repairs were required, this should be identified includ2ng extent of repairs and description of defects encountered during repair, if known.
Response
a)
All joints are full penetration butt welds in accordance with ASbE Section III, 1965 and the addenda in effect at August 1967.
b)
See Attachment II.
c)
See Attachment II.
d)
All construction nondestructive examinations wre acceptahle except for Reactor Feedwater system penetration welds F-RF-N1, F-RF-N2 and F-RF-S1 which were rejected for porosity. The e.xtent of the repairs i
is not known; however, the radiographs perforned after l
repairs were acceptable.
l Cont'd... 2
ATIAQs err I Page 2 3.
For those facilities cmmitteri during construction to perform volumetric examination of such penetrations through SAR com-mitnents which have not performed radiography, justify not performing radiography or subnit plans and schedules for parforming radiographic examinations.
Response
All of the information for the welds is not available at this time. Further efforts will be made to find the weld records for the Liquid Poison System (weld SW NP2-B) and Reactor Feedwater Systen (welds S1367 and S1364). A written response will be made within 45 days of this date containing the weld information requested or a schedule for perfornung radiographic inspection of the above welds if physically possible.
l l
l l
u,uuc.o oin, vi i u w w Ai - u u SYSTEM PENETPATIO4 WELD NO.
'IYPE OF WEID JOINT BAR EXAMIlmTION PEPFOITED USED Visual fiju l u i.
- X= Ray M3g. cart 10.
...s...-..
1.
Main Steam X-2A F-1013 36"xl/2" Full Penetration Pipe to Fitting NO X
X X
X Butt weld.
ASTM A-105 to A-212-B r
X X
X X
X-2B F-1014 36"xl/2" Full Penetration Pipe to Fitting NO Butt weld. AS'IM A-105 to A-212B I
i i
Main Steam X-72 F-3231-A 14" Schedule 80 Full Penetration Butt NO X
X X
X Drain
- weld AS1M 201-B i
l
' NOTE:
'1hese tables only contain the information I
' that can be supported try written records.
i I
i i
6 I
l l
i
.i i
I l
i e
I
i BACKIIE TYPE OF NOtOESTRUCTIVE SYSTD4 PENETRATION WEID NO.
TYPE OF WELD JOINP BAR EXNIINATIW PFMDfffPn
,_USED
! Visual j Dve LNm. i 2--Iby__Itag Pen i
t i
Reactor X-4-A S 1367 l 24" A-106-C Schedule 80 Feedwater F-RF-N1 A-212-B pipe to A-105 fitting 30",
NO X
X X
X 1/2" wall i
'A-212-B pipe to A-105 fitting 30",
NO X
X X
X
,1/2" wall i
i l
X-4-B F-RF-S1
'A-212-B pipe to A-105 fitting, 30" NO X
X X
X 1/2" wall j
i F-RF-S2 A-212-B pipe to A-105 fitting, 30" NO X
X X
X 1/2" wall S 1364 24" A-106-C Schedule 80 l
i i
i f
I i
i i
BACKIIG TYPE Ob' tONDESHkAJHVU SYSTD4 PENETRATICN WEED NO.
TYPE OF WELD JOINI' BAR EXAMINATION PFRFORMFY)
NO.
USED IVisual i. Dye Pen.4,X-Ray._,__ _
i i.
Isolation
' X-3A EW 5564 Full penetration butt weld 18" AS'IM NO X
X X
Condenser A-333 Gr. 1 Schedule 80 l
I i
I EW 5564A Full penetration butt weld 18" AS'IM NO X
X X
.A-333 Gr. 1 Schedule 80 i.
FW 5562 Full penetration butt weld 24" AS'IM NO X
X X
l A-106 Schedule 80 EW 5562A
[ Full penetration butt weld 24" AS'IM NO X
X X
iA-106 Schedule 80 i
i I
i X X
X SW NE 5-6--I I
t i
X-3B EW 5555 Full penetration butt weld 24" AS'IM NO j X X
X A-106 Schedule 80 t
Il
+
i X
X X
Full penetraticn butt weld 24" ASE NO l
EW 5555A lA-106Sclniule80 t
l 1,
t EW 5557 Full penetration butt weld 18" AS'IM NO X
X X
i
,A-106-B Sclnlule 80 l
EW 5558 IFull penetration butt weld 18" AS'IM NO I X X
A-106-B Schedule 80 SW NE 5-3-1!
X X
X i
X-5A EW 5575
! Full penetration butt weld 24" AS'IM NO
- X X
X
'A-106 Schedule 80 to A-201-B i
FW 5575A
, Full penetration butt weld 24" AS'IM NO X
!X IA-106 Schedule 80 to A-201-B SW NE 2-17-3 10" AS'IM 312, TP 316 NO X
X X
t i
X X
- X SW NE 2-17-4 18" AS'IM 312, TP 316 NO 1
i i
l
BACKIIU TYPE OF tONDESTRUCf1VE SYSTEM PENETRATION WELD NO.
TYPE OF WEID JOINT BAR EXAMINATION PEIKIMm p.
-~
yipn1 i Dye Pen,f,X-pal __ flag.Part No.
USED g
Isolation X-5B FW 5567 Full Penetration Butt weld pipe to 10 X
X X
fitting 24" A-106-B Schedule 80 to Condenser I'
e A-201B i
SW NE 2-6-3 10" ASD1 A-312, TP 316 to X
X X
'SW NE 2-6-4 18" ASD1 A-312, TP 316 to i
X X
X i
j Liquid X-6 FW 1657 Full Penetration Butt weld NO X
X X
Poison 8" ASD1 A-106-B Schedule 80 i
i SW NP 2-B l-Shutdown X-7 FW 5678 Full Penetration pipe to fitting butt to X
X X
(boling weld 26" ASD1 A-106 Schedule 80 to i
A-201-B i
X-8 FW 5705 Full Penetration pipe to fitting butt NO X
X X
X weld 26" ASTI A-106-B Schedule 80 to A-201-B Core Spray X-12B FW 5940 Full Penetration butt weld 22" ASTM NO X
X X,
A-106-B Sclnlule 80 pipe i
I FW 5940A Full Penetration Butt weld 22" ASTM NO X
X X
i A-106-B Schedule 80 pipe to A-212-B fitting SW NZ 3-9-5 Full Penetration butt weld 8" ASTM-NO X
X X
312, TP 316 X-70 FW 5923 Full Penetration butt weld 16" ASTM NO X
X X
A-106-B Schedule 80 SW NZ 3-2-4 Full Penetration butt weld 8" ASTM NO X
X X
312, TP 316 i
i I
Cleanup X-9 FW 399A Full Penetration butt weld, 22" AS'IM NO
[X X
X A-106-B Sclnlule 80 i
l X-10 FW 634A Full Penetration butt weld 22" AS1M NO X
X X
A-106-B Schedule 80
)
.X-61 FW 1096 Full Penetration butt weld 3" ASTM NO 1X X
A-106B Schedule 160
{