- 4 N_C scru 195 u.s. NuCLEAa :tEGULATORY f MIS $lON DOCKET NUMLEn (2 788 50-313 NRC" DISTRIBUTION PoR PART 50 DOCKET MATERIAL T:
FROM-DATE OP 00CUMENT Arkansas Po* er & Light Company 9/30/76 Mr. Dennis L. Ziemann Little Rock, Arkansas DATE RECElVED tl. !!. Murphey 10/12/76 LLETTER O NOTORIZ E D PROP INPUT PORM NUMBER OF COPIES RECEIVED CoRio NAL
$itusCLAssiPiEo One signed
& OPY OEICalPTION ENCLOSURE Ltr. notorized 9/30/76...re our 6/7/76 Itr.
...trans the following:
Furnishing requested changes to various tech specs in order to delete responses to
" refueling period", refueling outag.e", and
" refuel! ; shutdown", and in their place, insert time period which would more readily be in.. p re ted.
PLANT NAME:
ACKNOWLEDGED t
DONOT EEM0yE Arkansas Unt'
- SAFETY FOR ACTION /INFORMATION ENVTRO 10/13/76 RJL 3
- COICNED AD:
I h
AR4TCNFn Ant gBRANCH CHIEF:
Ziemann
(#/
BRANCH CMTFF.
YPROJECT MANAGER:
Converse PROJECT MANAGER:
M'LIC. ASST.:
Dir,ns LIC. ASST.!
v INTERNAL OlSTRIBUTION YREGFILD SYSTEMS SAFETY PLANT sYsTFvs SITE SAFETY &
M NRC PDR HEINEMAN TFnFsco ENVIRO ANALYSIS VI&E
/2. )
SCHROEDER BENAROYA DENTON & MUT LFR k OELD s LAINAS h'GOSSICK & STAFF ENGINEFP.ING IPPOLITO ENVIRO TECH _
i]IPC BACCARRY KIRKWOOD FRNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLEIS PAWLICKI STELLO 9TTP TFPM PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.
CAMMTLL BOYD ROSS V
EISENHITT
[h. )
STEPP I
P. COLLINS NOVAK V
SHA0 HULMAN H0_USTON ROSZTOCZY V
BAER
/
PETERSON CHECK M
BITTLER SITE ANALYSIS I
MELTZ
~
' GRIMES VOLLMER
\\
v HELTE_MES AT &_I BUNCH I
SKOVHOLT SALTZMAN M 3 d OLLISS RUTRERG VRFCFR EXTEHN AL Dl5TRl0UTION CONTROL NUMBER
.s k, N5T TAB:
~
LPDR: Russellville.
B!m0K]t EN_NAT LAB
/
A r
' TIC:
REG. VIE ULRIKSON(ORNL) v/
ESIC:
LA PDR_
j ASLB; CONSULTANTS
/
n a OU d. 422O 1ACRS/4CYS
"^g DT.h ENT @ W 4.
t p
N_,_,.,.,
H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY STH & LCulSIAN A ST AEETS. LITTLE AOCK. A;4K ANSAS 72203.[501)372-4311 September 30, 1976 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis L. Ziemann, Chief Operating Reactor Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.
20555
\\g L-
-A.
u,
Subject:
Arkansas Power 4 Light Company
- js Arkansas Nuclear One-Unit 1 (by 7
Docket No. 50-313 Y y"~.. ' '
License No. DPR-51 Proposed Technical Specifications Gentlemen:
Your letter of June 7,1976, to Mr. J. D. Phillips requested changes to various Technical Specifications in order to delete references to
" refueling period", " refueling outage", and " refueling shutdown", and, in their place, insert a time period which would more readily be inter-preted. Attached find those changes as requested, save those exceptions Nhich are delineated below.
Specification Reason for Exception 4.4.1.2.5,,,e, Item 2 of your letter requested a 9*.-q ' p change to those specifications with
,[
reference to " refueling period". The
- g ') ( /, Js change to Specification 4.4.1.2.5
.m c;.c p, /,
. i.U_ -l[k' e.
f.f.'
reflects the requirements of Appendix J
' x '?
% 's of 10CFR50.
'V.V geo N
,%\\ The last sentence of this specification
- 4. 6.1. 3 '
M 7-j has been deleted as it adds no further p
/
pl meaning to the requirement. The remaining
'.. o u2*to" & -}/
portion has been changed to reflect the
- ',$/d7 request in Item 4 of your letter.
q,-
4.12.3(a) of the above mentioned letter requested a change to this specification, but no reference to
" refueling period" was found.
P
_L
- e.Aut i A T A X A AYtNG. INVE STO A CWN E O MEMBE A MICOLE SOUTH UTateTIES SYSTEM
Mr. Dennis L. Ziemann S:ptmabsr 30, 1976 4
Specification Reason for Exception 4.12.4 This specification was not noted in your Enclosure 1, but is associated with " refueling period". Therefore, a change has been made to comply with your request.
4.0 provided a model specifica-tion to replace the existing specifica-tion. However, we do not wish to change this specification because we feel that our present specification is adequate and accomplishes the same purpose.
4.1.b Item 4 of your letter requested a change Table 4.1-2 to those surveillance items presently Items 1 and 5 required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
)
A refueling shutdown is required to perform these surveillance items; therefore, no change has been made.
4.2.4 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
4.2.6 No change has been made to this specifica-tion as we see no benefit in such a wording change.
4.4.1.1.4 alludes to the fact that a reference is made to " refueling shutdown" or " refueling outage". However, no such wording exists in this specification, thus no change has been made.
4.4.1.3 The acceptance criteria referenced in this Specification are found in Specifications 4.4.1.1 and 4.4.1.2 rather than Specifications 4.3.1.1 and 4.3.1.2 respectively.
4.4.1.5 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling
s ltr. Dennis L. Ziemann
--3 S;ptembsr 30, 1976 Specification Reason for Exception 4.4.1.5 (cont 'd) shutdown" or " refueling outage" which are not directly associated with refueling.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
4.4.2.4.2 No change has been made to this specification as the specification will become obsolete after Cycle 1.
Specification 4.4.2.4.4 will then become effective and this requirement will be dropped or new specifications will be developed.
4.7.1.1 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
4.15.1 This specification will become obsolete at the beginning of Cycle 2.
Therefore, no change has been made.
4.15.2 No change has been made to this specifi-cation. Per our letter to you of June 9, 1976, revisions to Technical Specifications shall be made per the requirements of 10CFR50.55a(g)(5)(ii) before our next 40 month inspection interval begins.
4.16.1 No change has been made to this specification as it is presently covered by another Technical Specification Change Proposal.
4.17.2.a No change has been made to this specifi-cation as we see no logical need to test the fuel handling area ventilation system unless irradiated fuel is going to be handled. The specification already covers the surveillance to meet those Limiting Conditions for Operation of 3.15.1.a, and c, which is all that is required for system operability. This concern has already been discussed and resolved prior to the issuance of Amendment No.10 to these Tech-nical Specifications.
l L
I
,, Mr. Dennis L. Ziemann Sap * 'bsr 30, 1976 Specification Reason for Exception ~
4.6.3 Although no change to this specification was requested, we propose a change to this surveillance test that is consistent with other proposals submitted herein.
4.17.3 Although no change to this specification was requested, we have added additional wording as we see no need to repeat this surveillance test if performed within the previous 30 days.
Please be advised that the deletion of " refueling shutdown" and the insertion of "every 18 months" does not apply until cycles subsequent to Cycle 1.
This is due to the extended length of Cycle I as-compared to following cycles, as well as the fact that the specifications logically require these surveil--
lances to be done only during shutdowns associated with refueling.
If you have any questions and/or comments concerning the above, please contact us.
Very truly yours, M
y Senior Vice President WMM:ay
STATI: OF ARKANSAS l-1 SS COUNTY OF Pill.ASK!
)
W. bl.' Mu rphey being duly sworn, states that he is a Senior Vice President of Arkansas Power f, l.ight Company; that he is authori:ed on the part of said Company to -ign and file with the Nuclear Regulatory Comission this Supplementary in fo nna t i nn ; that he has reviewed or caused to have reviewed all of the statement s contained in such Infonnation, and that ali such statements made and mat ters set fo rt h the rein a re t rue and 4
correct to the best of his knowledge, in fo rma t i on and bel ie f.
/n
'W.M. [ phy h
h l
SUBSCRIBED AND SWORN II) before me, a Notary Public in and for the 5
M b day of k N a _._0 m _.
County and State above named, this 1976.
hik S. bk ws Nota ry I'ub t t e
- Sty Commission !!xpi res:
Ma rch 1, 1978 w