ML19323F655
| ML19323F655 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Crane |
| Issue date: | 06/22/1977 |
| From: | Scott R DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19323F652 | List: |
| References | |
| TASK-TF, TASK-TMR EP-O-A-1800-3, NUDOCS 8005290283 | |
| Download: ML19323F655 (4) | |
Text
P.
r
~
EP/0/A/1800/3 j
Checked Control copy
?
i l
DuxE Pcan Cc:e.urf P*
l OCONEE NUCLEAR STATION
[
r j
[
l REACTOR TRIP 5
l t
l e
l f
l l
1.0 Symptoms Channel. trip alarm on tuo or more reactor protective channels.
. 5 1.1
~
I 1.2 droups 1-7, control rod "in limit" light on.
1.-3 NI's indicating a rapid decrease in neutron power.
fl l'
1.4 ICS runb'ack in progress, l
1 2.0 Immediate Action I
l-;
I 2.1 Automatic-f Control rod groups 1-7 d:cp into the core, g
2.1. l '
i
-j
'2.1.2 Turbine generator trips.
t Unit auxiliary load transfers to startup transformer.
~ l 2.1.3 f
2.1.4 Turbine bypass valves open at setpoint +125 PSI.
i' j,
Feedwater runback to minimum level in OTSG's.
2.1.5 2.2 Manual iI I
Verify automatic actions occur, if not, perform manually.
2.2.1 2.2.2 Verify neutron level decreasing.
2.2.3 Close (2)(3) EP-5 (Letdown Isolation).
2.2.4 Maintain LDST level by adding water with boron concen-tration > RCS boron concentration.
2.2.5 If pressurizer level cannot be maintained due to severe shrinkage open (2X3) HP-26.
NOTE:
(2)(3) "C" HPI Pu=p can be used to maintain i
pressuri ct level if needed.
j f
8 0052 90-OXO g l
r, t
- ee s _ _
=
'T-2-
('
3.0 Subsequent Action
- ?
3.1 Notify unit supervisor and arga dispatcher -
,j i
3.2
'w rify OTSG's controlling at' minimum level.
- [
E 3.3 Determine cause of trip and correct-l t
3.4 If LDST level approaches zero, open (2)(3) HP-24 to supply i j
.i.t HPI pump suction from BWST.
t 5 I!
l8 3.5 Go to one hoewell pump, one condensate booster pump, and one
.I Ii
'feedwater pump, as required -
j 3.6
- 0. pen (2)(3) HP-5 when pressurizer level returns to normal.
i ;,
I'l i
.i 6
)
I g.
L, t
-t r
[,
d l
l l
l E
t o
e f
, _ ;.._ _ --,h 4_
- t r a.
h -._ -
7/
. Fro r.3 5-& W b
Tdp Sk\\ OWC fO bb*k W oTcG RPS L'dh a
'Tv 7 sqech4
=%
o"
-+
ton.
u c.naA i
W y,L OW' 'W % TW py r~ j k j
'{.
Y"f ad L J,;cf rw +- ~ p 4
g
- cum, nr V <L vC-c cJ~ 7
~
com.
iLJ b:s
s
=.
t y
f fa 3PC-1002-0 l
. i:.
u.,. c e.
.w e -
p
' ~ ' ' ' ' ' ' "
'1
/ 746 j
. /
DUKE POWER C0' IPA';Y (1) ID Not.[A
2 '> ' C "' " PRCCEDURE 'PREPA2ATIC::
l}I
/
i g,,,}
6 /.'.s.,<j s. A PROCESS RECORD
_i ca
..i 9
OCOja= NUCLEAR STATION M
(2)
STATION:
Aeoo/e 7'~,d (3) PRoCccuaE TITLE:
/
r t
g (4) PREPARED BY: h.
Tea DATE:
M /?-77
$~/d 77 (5) REVIE!ED BY:
(1 DATE:
N/R:
Cross-Disciplinary Review By:
i
?
r (6) TDIPORARY APPRO\\*AL (IF NECESSARY):
(SRO)
Date:
By:
e Date:
By:
d e
1 4
e e
D D
F D W y{/il '
,M
'MJ 3
m
.