ML19323C871

From kanterella
Jump to navigation Jump to search
Forwards Inservice Test Program for Valves
ML19323C871
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 05/09/1980
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19323C872 List:
References
NUDOCS 8005190343
Download: ML19323C871 (1)


Text

8 00519 0 8D ;

B ALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 147 5 B ALTIMOR E. M A R YL AN D 21203 ARTHUR E. LU N DVALL, J R.

May 9, 1980 VeC E Pm(S'Ot sef Swee6 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cocmission Washington, D.C.

20555 ATTENTION:

Mr. Robert W. Reid, Chief i

Operating Brancn #4 Division of Operating Redctors

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No.1 Docket No. 50-317 Compliance with 10 CFR 50.55a

REFERENCES:

(a) BG&E Letter Dated February 2,1980, From Mr. A. E. Lundvall, Jr., to Mr. R. W. Reid (b) Telephone Conversation on March 12, 1980, Between Mr. S. M. Davis (BGEE) and Mr. V. Nerses (NRC)

(c) BG&E Letter Dated May 1, 1980, From Mr. A. E. Lundvall, Jr., to Mr. R. W. Reid Gentlemen:

Reference (a) provided information required for your review of our pump and valve inservice inspection program.

Reference (b) requested addi-tional information and clarification to enable you to complete your re-view of our valve test program.

Enclousre 2 provides the necessary in-fonnation and provides a current summary of our valve test program for Unit 1.

Enclaure 2 supersedes entirely enclosure 2 of reference (a). provides an interpretation of required testing while a reactor is in a cold shutdown or refueling mode.

It is our understanding that you find this explanation acceptable.

Therefore, we agree to follow the guide-line provided in enclosure 1 during the inservice test programs outlined in references (a) and (c).

Should you have further questions regarding our pump and valve test pro-gram we would be pleased to discuss them witn you.

Very tr ur

'lL A. E. LuTdM1, Jr.

'[)

n-o S

l Vice President Supply gf j[f j

Enclosures (2)

AEL/SM0/gfc

.