ML19322A856
| ML19322A856 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/03/1973 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Thies A DUKE POWER CO. |
| Shared Package | |
| ML19322A857 | List: |
| References | |
| NUDOCS 7911270613 | |
| Download: ML19322A856 (4) | |
See also: IR 05000270/1973013
Text
?
- %'
UNITED STATES
g
ATOMIC ENERGY COMMISSION
o
'I h e )J
l
c,
T -
DIRECTORATE OF REGULATORY OPERATICNS
'
REoion se - suit e ets
/ /*
230 >* E AC MT M E E $7 R E ET , NQRT MwESP
4TES O
,
,
,
AT L, A N T A, G E oRG 8 A M 30)
OCT 3
F/3
In Reply Refer To:
RO:II:FJ
50-270/73-13
Duke Power Company
ATTN:
Mr. A. C. Thies, Senior Vice President
Production and Transmission
Power Building
422 South Church Street
Charlotte, North Carolina
28201
Gentlemen:
This refers to the inspec' tion conducted by Mr. F. Jape of this
office on September 17-21, 1973, of activities authorized by AEC
Construction Permit No. CPPR-34 for the Oconee Unit 2 facility,
and to the discussion of our findings held by Mr. Jape with
Mr. J. E. Smith at the conclusion of the inspection.
3
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. These are identified in Section IV of the summary of the
enclosed report.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
i
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room. If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
.
ll} -
V
a
asitno6/3
_
-_
___
___
___p=..-
,
-
.
_. -
_ _. - ___ _
_ - _ __
-
!.
.
-
.
-
.-
.
-
.
Duke Power Company
-2-
OCT 3
1973
V
i
,
!
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary.
The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
/f'
f
c.L'
/ Norman C. Moseley
Director
._
Enclosure:
RO Inspection No.
'
50-270/73-13
.
a+,.
W
.-n.
.,
n.,.-
. . - - . *
~ ~ ' ' '-,sQ"<'..n~
-
L.*****
- . . ,
. , _ . .
,-
-
,
---
,
. . _
-
- .
-
.
.
-
-
- -
-
'
.
. .
'
,
.
.
,
.
.
k
'
.
I
!
t
I
Ltr to Duke Power Company fm N. C. Moseley
-
- d OCT 3
B73
,
4
.
DISTRIBUTION:
!
H. D. Thornburg, RO
!
RO:HQ (4)
Directorate of Licensing (4)
D
MRCentralFiles
J. R. Lundy, L
- PDR
- Local PCR
- NSIC
,
- DTIE, OR
'
- State
,
I,
!
- To be dispatched at a later date.
%
a
4.,
i
I
I
I
,
!,
'
4
N)
_ - . , -
. .
. _ _ _ .
.. _ _ __.. _ _ _ _ _ _._,_.. ._ _ ._ _
S&_
g -
-
--w
,
, -
-
, , , . . ., ,
...y,
,
-
.
_
..
,'
,
.
-
.-
.
,
.
1_9
7
)
l
'
.
!
{
Duke Power Company
OCT 3
5 73
l
i
Oconee 2
RO Inspection Report No. 50-270-73-13
4
cc w/ enc 1:
i
H. D. Thornburg, RO
'
RO:HQ (5)
!
N Central Files
Regulatory Standards (3)
,
.
Directorate of Licensing (13)
J. R. Lundy, L
I
cc enei. only:
- PDR
l
- Local PDR
- NSIC
' ftrIE, OR
'
N.Jtate
l
- To be dispatched at a later date.
!
1
I
t
t
e
OO %
l
!
l
==
_%
_
_ _ . .
.....-w
..
._
!
.
.
._
. - - . .
.