ML19319C934
| ML19319C934 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/28/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19319C928 | List: |
| References | |
| CS-77-238, NUDOCS 8003040875 | |
| Download: ML19319C934 (1) | |
Text
_.
O M
28 October 1977 3-0-3-a-2 7
CS-77-238 c c.....,, o.,
Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement License No. DPR-72 U.S. Nuclear Regulatory Commission Ref: a)RII-SCE 230 Peachtree St. N.W., Suite 818 50-302/77-14 Atlanta, GA 30303 b)CS-77-224 11 October 1977
Dear Mr. O'Reilly:
We wish to amplify our response provided in Reference "b" per telecon between S. C. Ewald of your staff and our Dr. J. L.
Harrison.
Supplement to Item B:
Photon abundance and half-life limit the detection sensitivity that can be achieved for Cu-64 with Ge(L1) ganna ray spectroscopy to the extent that procedure and/or instrument modification is impractical.
Therefore, on or before 15 December 1977, a proposal to change Section 2.4.1 of the Environmental Technical Specifications will be submitted as a means of improving the use of detection sensitivity as a quality control parameter.
If there are further questions on this subject, please contact us.
Very truly yours, LO.(. d uau-e W. P. Stewart Director, Power Production DWP/rc l
NucTear Plant Manager O
800804o y7g General Office 32o1 Thirty fourth street soutn. P O. Box 14042 st. Petersburg. Fiorda 33733 813-866-5151
-