ML19317D332
| ML19317D332 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/27/1973 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Thies A DUKE POWER CO. |
| Shared Package | |
| ML19317D333 | List: |
| References | |
| NUDOCS 7911270556 | |
| Download: ML19317D332 (4) | |
See also: IR 05000270/1973007
Text
. . _ ' _
_.
- - -
_. _
=
-
. -
.
.
-
.
"
-
.
,
.
I
e^# # %
UNITED STATES
f
t[
ATOMIC ENERGY COMMISSION
i W ! (g 'k,} -
Ve
DIP 2CTCPATE C? F2GUIATCRY CPIPATIC::S
t
g7
/J
aEGiou n - su.T e sis
'~
' \\'t '
230 PC AC MT R E E st R E ET , N ORT M eE ST
,,
'
I'a r g t C*
AT t. A N T A. G E C RG i A 30303
1
In Reply Refer To:
JUN 271973
'
RO:II:FJ
--
'
50-270/73-7
,
,
Duke Power Company
Attn
Mr. A. C. Thies
Senior Vice President
Production and Transmissien
Power Building
422 South Church Street
Charlotte, North Carolina 28201
i
Gentlemen
!
!
This refers to the inspection conducted by Mr. F. Jape of this office
on June 10-17, 19-21, 1973, of the activities authorized by AEC Con-
struction Permit No. CPPR-34 for the Ocence 2 facility, and to the
!
discussien held with Mr. J. E. Smith of your staff at the conclusion
l
of the inspection.
>
l
Areas examined during this inspection are described in the enclosed
l
inspection report No. 50-270/73-7. Within these areas, the inspec-
^
l
tion consisted of selective examination of procedures and represent-
ative records, interviews with plant personnel, and cbservations by
t
{
the inspectors.
l
.
No violations or safety items were identified within the scope of
this inspection.
,
f
In accordance with Section 2.790 of the AEC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the AEC's Public
Document Rocm.
If this report contains any information that you
.
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such informa-
tion from public disclosure. Any such application must include a
full statement of the reasons on the basis of which it is claimed
that the information is proprietary, and should be prepared so that
.
proprietary informatien identified in the application is contained
l
in a separate part of the document.
If the report contains no infor-
matien which you believe to be proprietary, please inform us in
!
b
l
-
q9112o 55'
/
,
v9
Y
'
(T
,
- - _ -
. _ - .
____
_ .
_ .
. _ _ -
,
,
.
'.
.,
.
t
.
.
.
Duke Power Company
-2-
JUN 27 E73
[O
-
i
's
writing within 20 days to this effect.
In such case, the report,
as enclosed with this letter, will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
-
,,
,
/ 7 j. ,.n ..- 2%;g
.
,
Norman C. Moseley
Director
Enclosure:
Inspection Report No.
50-270/73-7
.
e
O
m
0
.+.
l~
!
l
- .
--
.
.- . . - .
- --
-
.-
._
-
L_.
J
.
. .
.
. .
. .
. . . . .
-. .. -
.
.
-
..
+
.
I
!
-
Ltr to Duke Power Cc=pany
dtd Juli 27 E
,
n
.
ec w/ encl:
H. D. Thornburg, RO
RO:HQ (h)
irectorate of Licensing (! '
'
R Central Files
cc v/o enc 1:
Local PDR
DTIE, CR
State
.
o
em
%
%
0
~,
.
.-
.--
.
. . .-_ --. -
-
. ---
.-
- - -
. _ .
.. .
-.-
. -
_ .
.... - -
.
.
.
.
.
i
s
!
Duke Power Ceepany
'
Oconee 2
JUN 271973
RO Inspection Report lo. 50-270/73-7
.
cc v/ encl:
H. D. Thornburg, R0
RO:HQ (5)
--
R Central Files
Regulatory Standards (3)
Directorate of Licensing (13)
cc enel only:
- PDR
- Local PDR
- IISIC
- DTIE, OR
- State
- To be dispatched at a later date.
.
to
.
l
v
. s
.~eome+--
-- m n w n
sme._-
--- . .
_
,_
2