Initial NSHC Determination & Noticing Action Re Util 841203 Application to Amend License NPF-3 Re Auxiliary Feedwater Operability
ML19310G648
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/06/1984
From: De Agazio A
NRC
To:
Shared Package
ML19284D497 List:
References
TAC-56390, NUDOCS 8501020522
Download: ML19310G648 (2)


Text

.

~

i I

~

i

,.g DLOP 228, R:.v. 1 Tg( %300 "i

I~

. INITIAL, NO SIGNIFICANT Hh2AkDS' CONSI ERATION DETERMl' NATION bd AND NOTICING ACTION-Docket No.

Facility:

Davis-Besse, Unit No.'l l

50-34G-Licensee: Toledo Edison Company Date of application: December 3,1984 Request for:

Provide for determining AFW operability without regard to status of SUFP until entering mode 1 for Cycle 5.

j l

1 (See attached notice or press release for more details.)

Initial Determination:

( X ) Proposed determination - amendment request involves no significant hazards consioerations (NSHC).

(

) Final determination - amendment request involves significant hazards considerations (SHC).

l Basis for Determination I

(

) Licensee's HSHC discussion has been reviewed and is accepted. See attached j

ament.nent request.

i

()() Basis for this determination is presented in the attached notice.

(

) Other (state):

i i

i (Attach additional sheets as needed.)

Initial Hoticino Action:

(Attach appropriate notice or input for monthly FRN) 1.

( ) Monthly FRN.

Notice of opportunity for hearing (30 days) and request for comments on proposed NSHC determination - monthly FRN input is

~

attached (Attachment 8).

(

2.

( ) Individual FRN (30 days). Same notice matter as above. Time does not

(

allow waiting for next monthly FRN (Attachments 9a and 9b).

(THIS FORM SHOULD BE TYPED EXCEPT FOR UNUSUAL, URGENT CIRCUMSTANCES.)

756L 91>~

7p.

~

. - page 2

.js DLOP 228 Rev. 1 u..

t 3.

( X ) local media notice.

Valid exigent circumstances exist (evaluated below).

. Local media notice requesting public c'omments on proposed F3HC

  • i determination is attached (Attachment 10).

4.

(

) No notice. A valid emergency situation exists (avaluated below) and there is no time for public notice on proposed NSHC determination.

(Noattachment.)

5.

(

) Individual FRN (30-days). Licensee's claim of exigent or emargency.

I-

[

. circumstances is invalid (evaluated below).

Notice of opportunity for hearing (30 days) and request for comments on prooosed NSHC determina-tion is attached (Attachments 9a and 9b).

Letter of explanation to t

licensee is also attached.

6.

(

) Individual FRN (30-days). The amenament request involves SHC. Notice l

of opportunity for prior hearing is attached (Attachment 5). Letter to licensee also attached.

7.

( -) Individual Short FRN.

Valid er,ergency circumstances exist (evaluated i

Delow).

There is no time for the usual 30-day FRN.

(Attachment 16).

Evaluation of exigant or emergency circumstances (if applicable):

The licensee did not realize that the startup feedwater cump would be needed to conduct low' powee Fhysics tests. When approval was requested, the licensee did not realize an amentment would be required. The licerisee then submitted a timely application but 't covered the full operating cycle and prenetite was requi red. This action, covering only the startup phase, could not be submitted

~,

in time to provide normal notice and still support 'Jrojected need by December 19, 1984.

Acorovals:

Da t t 1.

Albert W. De Agazio [ g 1 2/ [ /84 (Pr t Y na

/

j 2.

John F. Stolz 12/fo/84 l

(Bran Cnief)

}

( M ELD)

Additional aooroval or oticing actions types 3, 4, 5, 6 and 7):

4.

([V (psisdntDirector)

Mditional c.ooroval (for noticing action types 4 and 5):

5.

(Director. --Division of Licensing)

((

Attachment:

as indicated Original - Docket File (with note " Docket File only")

cc:

Project Manager Licensing Assistant Branch Files

.-