ML19308D097
| ML19308D097 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/07/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19308D098 | List: |
| References | |
| CS-77-19, NUDOCS 8002270592 | |
| Download: ML19308D097 (1) | |
Text
.
eso e*
IE FrrR mPYJ M
7 February 1977
-~
g CS-77-21
' g "
- ca.......o-3-0-3-a-1
- f. 2E.S
\\-Q; @T;l;lv
!!r. Norman C. ?!oseley, Director Crystal River Unit 3 -
Office of Inspection and Enforcement Docket No. 50-302 U. S. Nuclear Regulatory Commission License #DPR-72 230 Peachtree St., N.W., Suite 818 Licensee Event Report 77-6 Atlanta, Georgia 30303
Dear lir. Moseley:
This report is submitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Revision 4, Section 2.a.(3), as a written Fourteen (14) Day Report. Your office was notified on 31 January 1977 of this event.
7-A through wall crack was found in an eight inch Schedule 40 304 stainless steel building spray pipe. This crack is in the heat affected zone of a pipeto-pipe weld at a location which may have contained stagnant water. This is the second occurrence of this Q
condition.
It was discovered coincident with our ongoing study which is being conducted in accordance with IE Circular 76-06.
A summary report will be submitted by 10 March 1977.
Very truly yours, FLORIDA POWER CORPORATION bC bAldLL.
s.
W.P. Stewart Director, Power Production DUP /ib Enc.
Nucicar Plant Ifanager j
8002 27o 3 P2.. S u._a CRYSTAL RIVER NUCLEAR PLANT P.O. BOX 1228, CRYSTAL RIVER, FLA. 32629 l
,