Text
.
Distribution:
Suppl. 4 y
DRL Reading R&PRSB Reading DEC 2 7 "6 Orig: HSteele (2) 1 E. G. Case (2) 1 Docket Nos. 50-269 & q H. Shapar, OGC 50-270 g,g R. S. Boyd
{
D. R. Muller i
R. Hart, DC.
C. Long Dr. Esthan E Neuenark J. F. Newell 111 Talbot Laboratory J. Cook, REG University of Illinois R. Leith, OC l
Urbana, Illinois 61803 l
Dear.Dr. Neumark:
Re: Contract No. AT(49-5)2667 Nathan & Neissark Consulting Engineering Services is hereby requested, pursuant to the conditions of Contract AT(49-5)2667, to provide the following services for the ra--f=sion concerning the proposed construction of the Oconee Nuclest station Units 1 and 2 at Duke Power company's Oconee Station site near Sancca, South Carolinat 1.
Analyses of the engineering factors included in the proposed design to mini =1=e damage from seismically-induced ground motions.
2 Preparation of a report on (1) above.
3.
Serving as an expert witness in the public hearing on this facility.
The =ewi=== maovat payable to your firm for this project is $3,000.
Enclosed for your review are Volumes I and II of the Oconee Nuclear station Preliminary Safety Analysis Report.
On the basis of our thatative schedule for this project, it would be desirable to have your report available for our use by-learch 1, 1967.
By mid-February 1967 % would hope to be able to discuss with you the results.ef your preliminary evaluation.
Sincerely yours, Originalsigned by
.f@r E. G. Case og DR W h\\ BRB OGC DJy[Ndson G. _ Case, Deputy Director
\\Q
@ M ifts E of Reactor Llcensing
[
summe R&Beyd d
[h rEGCh%/
Enct a==: 12/20/t 6id/O/66 12/it,/66 r w m m an Msi
~L.i 7912170 % /
h m